← Back
Two stories - detached, small or mid-size
75-20 185 STREET
QUEENS · BIN 4154910
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R2AZoning
1,951 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,999 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/28/2022$950K—— → —$487/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC904/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DMCONSULTING68601603/21/2026
Mdl consulting services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY DYNAMIC CONSTRUCTION CGeneral Contractor507/08/2026
FOUR POINTS P & H CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519804/10/2024
Building Lifecycle
All (55)Filed (9)Permit Issued (5)Signed Off (3)Inspection (6)Objection (2)Special Inspection (30)
05/22/2024
Signed off — Alteration CO
HEREWITH FILING ALTERATION SUBSEQUENTLY WITH ALT #Q08030610-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q08030610-S2
05/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/24/2024
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
04/24/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/24/2024
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
04/24/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
04/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/24/2024
Special inspection requirement — Final
NAVEEN KUMAR
04/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/24/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/24/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
04/24/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/24/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/24/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/24/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
04/24/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
04/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/24/2024
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/24/2024
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
04/24/2024
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
04/24/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/24/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
04/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/22/2024
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/22/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
04/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/10/2024
Filed — Alteration CO
HEREWITH FILING ALTERATION SUBSEQUENTLY WITH ALT #Q08030610-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q08030610-P4
04/10/2024
Filed — Alteration CO
HEREWITH FILING ALTERATION SUBSEQUENTLY WITH ALT #Q08030610-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q08030610-P5
04/01/2024
Permit issued — Plumbing
Q08030610-S2-PL
12/01/2023
Signed off — Alteration CO
HEREWITH FILING ALTERATION SUBSEQUENTLY WITH ALT #Q08030610-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q08030610-S3
10/23/2023
Signed off — Alteration
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q08028319-I1
07/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/15/2023
Filed — Alteration CO
HEREWITH FILING ALTERATION SUBSEQUENTLY WITH ALT #Q08030610-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q08030610-P3
06/11/2023
Filed — Alteration CO
HEREWITH FILING ALTERATION SUBSEQUENTLY WITH ALT #Q08030610-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q08030610-P2
06/11/2023
Special inspection requirement — Permanent certificate
Younes Abouyaala
06/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/17/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/15/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/24/2023
Permit issued — Plumbing
Q08030610-S2-PL
02/12/2023
Filed — Alteration CO
HEREWITH FILING ALTERATION SUBSEQUENTLY WITH ALT #Q08030610-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q08030610-P1
01/05/2023
Permit issued — General Construction
Q08030610-S3-GC-CX
12/27/2022
Permit issued — General Construction
Q08030610-I1-GC-CX
12/22/2022
Filed — Alteration CO
HEREWITH FILING ALTERATION SUBSEQUENTLY WITH ALT #Q08030610-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q08030610-S3
12/13/2022
Permit issued — Construction Fence
Q08028319-I1-FN
12/12/2022
Objection raised — Other
12/12/2022
Objection resolved — Addressed
12/07/2022
Filed — Alteration CO
HEREWITH FILING ALTERATION SUBSEQUENTLY WITH ALT #Q08030610-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q08030610-S2
11/03/2022
Filed — Alteration CO
HEREWITH FILING ALTERATION SUBSEQUENTLY WITH ALT #Q08030610-I1 FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED.
Q08030610-I1
10/26/2022
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q08028319-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP04/01/2024
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP02/24/2023
DOB NOWGeneral ConstructionSigned-offNY DYNAMIC CONSTRUCTION C01/05/2023
DOB NOWGeneral ConstructionPermit IssuedNY DYNAMIC CONSTRUCTION C12/27/2022
DOB NOWConstruction FenceSigned-offNY DYNAMIC CONSTRUCTION C12/13/2022
1 project · most recent 04/10/2024
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/10/2024Signed-offNY DYNAMIC CONSTRUCTION CHeating Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×9
Heating
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×9
Ventilation
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×9
1 project · most recent 04/10/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/10/2024Signed-offFOUR POINTS P & H CORPGas, Storm, Water/Sanitary
1 project · most recent 03/15/2023
General Wiring
FiledStatusContractorScope
03/15/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 04/10/2024
FiledStatusContractorScope
04/10/2024Signed-offFOUR POINTS P & H CORP1 scope_items
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/08/2024Fail-Final CND-Occupancy InspectionFailView ↗
07/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/29/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/17/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/15/2023Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
04/24/2024Concrete - Cast-In-PlaceYounes Abouyaalaspecial
04/24/2024Mechanical SystemsYounes Abouyaalaspecial
04/24/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/24/2024Subgrade InspectionsYounes Abouyaalaspecial
04/24/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
04/24/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/24/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/24/2024FinalNAVEEN KUMARprogress
04/24/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/24/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
04/24/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/24/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/24/2024Fenestration areasYounes Abouyaalaenergy_progress
04/24/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/24/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/24/2024Interior lighting powerYounes Abouyaalaenergy_progress
04/24/2024Exterior lighting powerYounes Abouyaalaenergy_progress
04/24/2024Maintenance informationYounes Abouyaalaenergy_progress
04/24/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
04/24/2024Permanent certificateYounes Abouyaalaenergy_progress
04/24/2024Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
04/24/2024Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
04/24/2024Fenestration air leakageYounes Abouyaalaenergy_progress
04/24/2024Lighting controlsYounes Abouyaalaenergy_progress
04/22/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
Latest 25 of 37.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026Q08028319-I1Request digital key ↗
08/24/2026Q08030610-P1Request digital key ↗
08/24/2026Q08030610-S3Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/24/2026Q08030610-I1Open ↗
08/24/2026Q08030610-P1Open ↗
08/24/2026Q08030610-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/24/2026Q08030610-I1Open ↗
08/24/2026Q08030610-P1Open ↗
08/24/2026Q08030610-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08030610-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature27
09/01/2026Q08030610-P3Open ↗
09/01/2026Q08030610-P3Open ↗
09/01/2026Q08030610-P3Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q08030610-P3Open ↗
08/31/2026Q08030610-S2Open ↗
08/23/2026Q08030610-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026Q08028319-I1Open ↗
08/24/2026Q08030610-S2Open ↗
08/24/2026Q08030610-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/24/2026Q08030610-I1Open ↗
08/24/2026Q08030610-P1Open ↗
08/24/2026Q08030610-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q08030610-I1Open ↗
08/24/2026Q08030610-P1Open ↗
08/24/2026Q08030610-P3Open ↗
Showing 3 of 8 on file for this type
▸Other Documents20
▸DOB NOWSite Survey: Initial5
08/24/2026Q08030610-I1Open ↗
08/24/2026Q08030610-P1Open ↗
08/24/2026Q08030610-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/24/2026Q08030610-I1Open ↗
08/24/2026Q08030610-P1Open ↗
08/24/2026Q08030610-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/24/2026Q08030610-I1Open ↗
08/24/2026Q08030610-P1Open ↗
08/24/2026Q08030610-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026Q08030610-I1Open ↗
08/24/2026Q08030610-P1Open ↗
08/24/2026Q08030610-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q08030610-I1Open ↗