← Back
One story - permanent living quarter
75-31 175 STREET
QUEENS · Pomonok-Electchester-Hillcrest · BIN 4151422
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R2Zoning
990 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: KW QUEENS PROPERTY LLC · 4,000 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanical
Floor 26p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar8p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/27/2022$878K—— → —$887/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/20/2025
TWIG CONSULTING ENGINEERS PC909/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
WM ARCH1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITYTECH CONSTRUCTION CO*General Contractor407/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/20/2025
D&E BUILD EVERGREEN I9342509/04/2025
CL ENGINEERING P.C.6781406/11/2025
NKM ENGINEERING PLLC6244206/11/2025
Building Lifecycle
All (72)Filed (10)Permit Issued (5)Signed Off (4)Inspection (9)Objection (14)Special Inspection (30)
12/19/2025
Signed off — Alteration
Q01302481-I1
11/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2025
Permit issued — Solar
Q01302481-I1-SL
10/20/2025
Filed — Alteration
Q01302481-I1
10/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2025
Special inspection requirement — Air barrier - visual inspection
CALVIN TRAN
09/26/2025
Special inspection requirement — Insulation placement and R values
CALVIN TRAN
09/26/2025
Special inspection requirement — Electric vehicle service equipment requirements
CALVIN TRAN
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
09/26/2025
Special inspection requirement — Structural Steel - Details
Danny Chen
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
09/26/2025
Special inspection requirement — Permanent certificate
CALVIN TRAN
09/26/2025
Special inspection requirement — Maintenance information
CALVIN TRAN
09/26/2025
Special inspection requirement — Structural Wood Frame
CALVIN TRAN
09/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Danny Chen
09/26/2025
Special inspection requirement — Interior lighting power
CALVIN TRAN
09/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
CALVIN TRAN
09/26/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Danny Chen
09/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CALVIN TRAN
09/26/2025
Special inspection requirement — Final
CALVIN TRAN
09/26/2025
Special inspection requirement — Fenestration areas
CALVIN TRAN
09/26/2025
Special inspection requirement — Fenestration air leakage
CALVIN TRAN
09/04/2025
Filed — Alteration CO
FILE HEREWITH MECHANICAL WORK FOR TWO & A HALF STORY ONE FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT CO JOB # Q00846637-I1.
Q00846637-P5
09/02/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Danny Chen
09/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Danny Chen
09/02/2025
Special inspection requirement — Electric vehicle service equipment requirements
CALVIN TRAN
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
09/02/2025
Special inspection requirement — Permanent certificate
CALVIN TRAN
09/02/2025
Special inspection requirement — Insulation placement and R values
CALVIN TRAN
09/02/2025
Special inspection requirement — Fenestration areas
CALVIN TRAN
09/02/2025
Special inspection requirement — Structural Wood Frame
CALVIN TRAN
09/02/2025
Special inspection requirement — Air barrier - visual inspection
CALVIN TRAN
09/02/2025
Special inspection requirement — Maintenance information
CALVIN TRAN
09/02/2025
Special inspection requirement — Structural Steel - Details
Danny Chen
09/02/2025
Special inspection requirement — Final
CALVIN TRAN
09/02/2025
Special inspection requirement — Fenestration air leakage
CALVIN TRAN
07/24/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/15/2025
Signed off — Alteration CO
FILE HEREWITH MECHANICAL WORK FOR TWO & A HALF STORY ONE FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT CO JOB # Q00846637-I1.
Q00846637-S3
06/11/2025
Filed — Alteration CO
FILE HEREWITH MECHANICAL WORK FOR TWO & A HALF STORY ONE FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT CO JOB # Q00846637-I1.
Q00846637-P3
06/11/2025
Filed — Alteration CO
FILE HEREWITH MECHANICAL WORK FOR TWO & A HALF STORY ONE FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT CO JOB # Q00846637-I1.
Q00846637-P4
06/09/2025
Signed off — Alteration CO
FILE HEREWITH MECHANICAL WORK FOR TWO & A HALF STORY ONE FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT CO JOB # Q00846637-I1.
Q00846637-S1
06/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2025
Signed off — Alteration CO
FILE HEREWITH MECHANICAL WORK FOR TWO & A HALF STORY ONE FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT CO JOB # Q00846637-I1.
Q00846637-S2
04/15/2025
Objection resolved — Addressed
04/02/2025
Objection raised — Energy
03/19/2025
Objection resolved — Addressed
03/18/2025
Permit issued — Mechanical Systems
Q00846637-S3-MS
03/18/2025
Objection resolved — Addressed
03/13/2025
Filed — Alteration CO
FILE HEREWITH MECHANICAL WORK FOR TWO & A HALF STORY ONE FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT CO JOB # Q00846637-I1.
Q00846637-S3
02/27/2025
Objection resolved — Addressed
02/27/2025
Objection resolved — Addressed
02/27/2025
Objection resolved — Addressed
02/26/2025
Objection raised — Inspections
02/26/2025
Objection raised — Scope
02/26/2025
Objection raised — Fire_Protection
02/26/2025
Objection raised — Structural
02/26/2025
Objection raised — Zoning
02/13/2025
Filed — Alteration CO
FILE HEREWITH MECHANICAL WORK FOR TWO & A HALF STORY ONE FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT CO JOB # Q00846637-I1.
Q00846637-P2
02/10/2025
Filed — Alteration CO
FILE HEREWITH MECHANICAL WORK FOR TWO & A HALF STORY ONE FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT CO JOB # Q00846637-I1.
Q00846637-P1
11/14/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/30/2025
DOB NOWMechanical SystemsSigned-offCITYTECH CONSTRUCTION CO*03/18/2025
DOB NOWPlumbingSigned-offS & L PLUMBING INC10/03/2024
DOB NOWStructuralPermit IssuedCITYTECH CONSTRUCTION CO*07/12/2024
DOB NOWConstruction FenceSigned-offCITYTECH CONSTRUCTION CO*04/23/2024
1 project · most recent 09/04/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/04/2025Signed-offCITYTECH CONSTRUCTION CO*Heating and Air Conditioning Systems
Heat / Cool
Gree MULTIU36HP230V1DO 36,000 BTU · Heat Pump Outdoor ×6
4LIV24HP230V1AO 24,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 09/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/04/2025Signed-offS & L PLUMBING INCGas, Water/Sanitary
2 projects · most recent 10/20/2025
General Wiring
FiledStatusContractorScope
10/20/2025CompleteSUNRUN SOLAR ELECTL CORP—
06/25/2025CompleteALL AROUND ELECTRIC CORP.General Wiring
1 project · most recent 09/04/2025
Wood
FiledStatusContractorScope
09/04/2025Signed-offCITYTECH CONSTRUCTION CO*Wood
1 project · most recent 09/04/2025
Fence
FiledStatusContractorScope
09/04/2025Signed-offCITYTECH CONSTRUCTION CO*Fence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/24/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/30/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
09/26/2025Structural Steel - High Strength BoltingDanny Chenspecial
09/26/2025Maintenance informationCALVIN TRANenergy_progress
09/26/2025Insulation placement and R valuesCALVIN TRANenergy_progress
09/26/2025Fenestration air leakageCALVIN TRANenergy_progress
09/26/2025Permanent certificateCALVIN TRANenergy_progress
09/26/2025Fenestration areasCALVIN TRANenergy_progress
09/26/2025Interior lighting powerCALVIN TRANenergy_progress
09/26/2025Fenestration and door U-factor and product ratingsCALVIN TRANenergy_progress
09/26/2025Electric vehicle service equipment requirementsCALVIN TRANenergy_progress
09/26/2025Air barrier - visual inspectionCALVIN TRANenergy_progress
09/26/2025Structural Wood FrameCALVIN TRANprogress
09/26/2025Energy Code Compliance InspectionsCALVIN TRANprogress
09/26/2025Fire-Resistance Rated ConstructionCALVIN TRANprogress
09/26/2025FinalCALVIN TRANprogress
09/26/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
09/26/2025Structural Stability – Alterations of existing buildingsDanny Chenspecial
09/26/2025Structural Steel - DetailsDanny Chenspecial
09/02/2025Fenestration and door U-factor and product ratingsCALVIN TRANenergy_progress
09/02/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
09/02/2025Structural Stability – Alterations of existing buildingsDanny Chenspecial
09/02/2025Structural Steel - DetailsDanny Chenspecial
09/02/2025Structural Steel - High Strength BoltingDanny Chenspecial
09/02/2025Energy Code Compliance InspectionsCALVIN TRANprogress
09/02/2025FinalCALVIN TRANprogress
09/02/2025Fire-Resistance Rated ConstructionCALVIN TRANprogress
Latest 25 of 65.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/20/2026Q00846637-P4Request digital key ↗
08/20/2026Q00846637-P5Request digital key ↗
08/20/2026Q00846637-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation1
09/08/2023440794909Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/08/2023440794909Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
07/24/2025440794909Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00846637-P2Open ↗
08/13/2026Q00846637-I1Open ↗
08/13/2026Q00846637-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00846637-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026Q00846637-P3Open ↗
08/20/2026Q00846637-P4Open ↗
08/20/2026Q00846637-P5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/29/2026Q00846637-I1Open ↗
08/29/2026Q00846637-P4Open ↗
08/29/2026Q00846637-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/29/2026Q00846637-I1Open ↗
08/29/2026Q00846637-I1Open ↗
08/29/2026Q00846637-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/08/2023440794909Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/08/2023440794909Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00846637-P2Open ↗
08/13/2026Q00846637-I1Open ↗
08/13/2026Q00846637-P5Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES SITE PLAN1
07/14/2025440794909Open ↗
▸BISSTREET TREE CHECKLIST1
09/08/2023440794909Open ↗
▸BISSTREET TREE SIGNOFF1
07/14/2025440794909Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/20/2026Q00846637-P3Open ↗
08/20/2026Q00846637-P5Open ↗
08/20/2026Q00846637-P4Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports1
▸BISBPP: FIELD INSPECTION1
07/24/2025440794909Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/08/2023440794909Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01302481-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
07/24/2025440794909Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/08/2023440794909Open ↗
▸Other Documents20
▸DOB NOWPlot Diagram4
08/13/2026Q00846637-I1Open ↗
08/13/2026Q00846637-P2Open ↗
08/13/2026Q00846637-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00846637-I1Open ↗
08/13/2026Q00846637-P5Open ↗
08/13/2026Q00846637-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026Q00846637-P4Open ↗
08/20/2026Q00846637-P5Open ↗
08/20/2026Q00846637-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00846637-P5Open ↗
08/13/2026Q00846637-P2Open ↗
08/13/2026Q00846637-P4Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
07/24/2025440794909Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
07/24/2025440794909Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/24/2025440794909Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00846637-I1Open ↗