← Back
Two stories - detached, small or mid-size
75-46 186 STREET
QUEENS · BIN 4154955
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,920 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,880 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/11/2021$1.4M—Private party → Private party$755/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC109/13/2024
H3 WORKSHOP ARCHITECTURE DESIGN109/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R J WELLBROCK203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAIETEUR CONSTRUCTION INC.General Contractor107/08/2026
SUSTAINABLE STRATEGIESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341109/13/2024
C.M. TESTING LABORATORY,1352109/29/2023
Building Lifecycle
All (18)Filed (2)Permit Issued (2)Signed Off (2)Violation (1)Objection (4)Special Inspection (7)
01/14/2025
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01111246-I1
09/23/2024
Permit issued — Solar
Q01111246-I1-SL
09/13/2024
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01111246-I1
09/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
09/13/2024
Special inspection requirement — Final
Michelle Contri
09/13/2024
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
09/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
05/22/2024
Signed off — Alteration
Q00935557-I1
05/09/2024
Permit issued — General Construction
Q00935557-I1-GC
10/23/2023
Objection resolved — Addressed
10/23/2023
Objection resolved — Addressed
10/07/2023
Objection raised — Scope
10/07/2023
Objection raised — Energy
09/29/2023
Filed — Alteration
Q00935557-I1
09/26/2023
Special inspection requirement — Tenant Protection Plan Compliance
JOHN SEMIOLI
09/25/2023
Special inspection requirement — Final
Daniel Hawes
12/05/2008
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES09/23/2024
DOB NOWGeneral ConstructionSigned-offKAIETEUR CONSTRUCTION INC05/09/2024
BISPLISSUEDQMB PLUMBING & HEATING INC12/08/2006
BISOTISSUEDTHREE STAR CONSTURCTION COM.12/04/2006
1 project · most recent 12/11/2024
FiledStatusContractorScope
12/11/2024CompleteSOURCE ELECTRIC INC1 meters
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/13/2024Structural Stability – Alterations of existing buildingsMichelle Contrispecial
09/13/2024FinalMichelle Contriprogress
09/13/2024Air barrier - visual inspectionMichelle Contrienergy_progress
09/13/2024Fire-Resistant Penetrations and JointsMichelle Contrispecial
09/13/2024Energy Code Compliance InspectionsMichelle Contriprogress
09/26/2023Tenant Protection Plan ComplianceJOHN SEMIOLIspecial
09/25/2023FinalDaniel Hawesprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01111246-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026Q00935557-I1Open ↗
08/28/2026Q01111246-I1Open ↗
08/28/2026Q01111246-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026Q00935557-I1Open ↗
08/28/2026Q01111246-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01111246-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01111246-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01111246-I1Open ↗