Office with commercial, 1-6 stories
75-59 188 STREET
QUEENS · BIN 4155064
💬 Discuss this project
2024Year Built
3Stories
O5Building Class
R2AZoning
9,032 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 7559 188 LLC · 4,000 sf lot · 2.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof46p · 1 filing · 20 docs
Floor 340p · 1 filing · 20 docs
Floor 246p · 1 filing · 20 docs
Floor 138p · 1 filing · 20 docs
Cellar49p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IMPACT BUILDERS1503/22/2026
MORGAN SERVICES GROUP COR603/22/2026
GROUP COR MORGAN SERVICES203/22/2026
7559 188 LLC203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/28/2021$1.3M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS3603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORGAN SERVICES GROUP CORGeneral Contractor2207/08/2026
IMPACT BUILDERS CORPGeneral Contractor907/30/2026
FOUR POINTS P & H CORPPlumbing207/08/2026
CN PLUMBING INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191207/09/2026
Building Lifecycle
All (176)Filed (23)Permit Issued (22)Signed Off (5)Violation (27)Inspection (15)Objection (54)Special Inspection (30)
08/18/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/14/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/14/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
08/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
08/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
08/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
08/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/29/2026
Permit issued — Mechanical Systems
Q08035309-S9-MS
07/10/2026
Special inspection requirement — Lighting controls
Younes Abouyaala
07/10/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/10/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/10/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
07/10/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
07/10/2026
Special inspection requirement — Metering
Younes Abouyaala
07/10/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/10/2026
Special inspection requirement — Exterior lighting power
Younes Abouyaala
07/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/10/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
07/10/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/09/2026
Filed — New Building
Erection of a 3 story building with cellar.
Q08035309-A6
07/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/09/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
07/09/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/08/2026
Objection raised — Other
07/08/2026
Objection resolved — Resolved
06/19/2026
Filed — New Building
Erection of a 3 story building with cellar.
Q08035309-A5
06/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
06/05/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
06/05/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/05/2026
Special inspection requirement — Exterior lighting power
Younes Abouyaala
06/03/2026
Signed off — New Building
Erection of a 3 story building with cellar.
Q08035309-S4
06/03/2026
Signed off — New Building
Erection of a 3 story building with cellar.
Q08035309-S5
06/02/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2026
Objection resolved — Addressed
05/13/2026
Objection raised — Scope
05/11/2026
Permit issued — Curb Cut
Q08035309-S5-CC
04/22/2026
Filed — New Building
Erection of a 3 story building with cellar.
Q08035309-A4
04/22/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/08/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/16/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/13/2026
Filed — New Building
Erection of a 3 story building with cellar.
Q08035309-A3
03/13/2026
Filed — New Building
Erection of a 3 story building with cellar.
Q08035309-A2
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2026
Objection resolved — Addressed
02/25/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/18/2026
Permit issued — Sprinklers
Q08035309-S8-EW-SP
01/28/2026
Objection raised — Zoning
01/12/2026
Filed — New Building
Erection of a 3 story building with cellar.
Q08035309-P9
12/18/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/05/2025
Permit issued — Plumbing
Q08035309-S7-PL
Latest 60 of 176 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offIMPACT BUILDERS CORP07/29/2026
DOB NOWCurb CutSigned-offIMPACT BUILDERS CORP05/11/2026
DOB NOWSprinklersSigned-offCN PLUMBING INC02/18/2026
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP12/05/2025
DOB NOWGeneral ConstructionPermit IssuedIMPACT BUILDERS CORP06/20/2025
DOB NOWConstruction FenceSigned-offIMPACT BUILDERS CORP04/09/2025
DOB NOWConstruction FenceSigned-offMORGAN SERVICES GROUP COR03/27/2025
DOB NOWConstruction FenceSigned-offMORGAN SERVICES GROUP COR10/18/2024
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP07/31/2024
DOB NOWConstruction FenceSigned-offMORGAN SERVICES GROUP COR06/26/2024
DOB NOWGeneral ConstructionPermit IssuedIMPACT BUILDERS CORP06/25/2024
DOB NOWGeneral ConstructionPermit IssuedIMPACT BUILDERS CORP05/14/2024
DOB NOWSupport of ExcavationSigned-offMORGAN SERVICES GROUP COR05/06/2024
DOB NOWStructuralSigned-offMORGAN SERVICES GROUP COR05/06/2024
DOB NOWSupport of ExcavationSigned-offMORGAN SERVICES GROUP COR02/08/2024
DOB NOWStructuralSigned-offMORGAN SERVICES GROUP COR02/08/2024
DOB NOWConstruction FenceSigned-offMORGAN SERVICES GROUP COR02/08/2024
DOB NOWGeneral ConstructionPermit IssuedIMPACT BUILDERS CORP09/20/2023
DOB NOWConstruction FenceSigned-offMORGAN SERVICES GROUP COR08/11/2023
DOB NOWFoundationSigned-offMORGAN SERVICES GROUP COR08/08/2023
DOB NOWStructuralSigned-offMORGAN SERVICES GROUP COR08/08/2023
DOB NOWSupport of ExcavationSigned-offMORGAN SERVICES GROUP COR08/07/2023
BIS—RE-ISSUEDFIRST WORLD DEVELOPMENT05/12/2023
1 project · most recent 07/09/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/09/2026Signed-offIMPACT BUILDERS CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
1 project · most recent 07/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/09/2026Signed-offFOUR POINTS P & H CORPGas, Storm, Water/Sanitary
2 projects · most recent 05/11/2026
General Wiring
FiledStatusContractorScope
05/11/2026CompleteNAS ELECTRIC CORPGeneral Wiring
05/23/2024CompletePOWER DIRECT ELECTRIC INC—
1 project · most recent 07/09/2026
Steel Concrete Masonry
FiledStatusContractorScope
07/09/2026Signed-offIMPACT BUILDERS CORPSteel, Concrete, Masonry
1 project · most recent 07/09/2026
Fence
FiledStatusContractorScope
07/09/2026Signed-offIMPACT BUILDERS CORPFence
1 project · most recent 07/09/2026
Earthwork
FiledStatusContractorScope
07/09/2026Signed-offIMPACT BUILDERS CORPEarthwork
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
08/18/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/18/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/02/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
05/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2026Fail-Final CND-Occupancy InspectionFailView ↗
03/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/16/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/25/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/05/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/04/2024Pass-Final PL - UndergroundPassView ↗
08/05/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 136
DateRequirementInspectorRole
08/14/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
08/14/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/14/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
08/14/2026Maintenance informationYounes Abouyaalaenergy_progress
08/14/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
08/14/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/10/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/10/2026Exterior lighting powerYounes Abouyaalaenergy_progress
07/10/2026Maintenance informationYounes Abouyaalaenergy_progress
07/10/2026Interior lighting powerYounes Abouyaalaenergy_progress
07/10/2026MeteringYounes Abouyaalaenergy_progress
07/10/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/10/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
07/10/2026Fenestration air leakageYounes Abouyaalaenergy_progress
07/10/2026Lighting controlsYounes Abouyaalaenergy_progress
07/10/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/10/2026Fenestration areasYounes Abouyaalaenergy_progress
07/10/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/10/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/09/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/09/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/09/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/09/2026Maintenance informationYounes Abouyaalaenergy_progress
07/09/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
07/09/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
Latest 25 of 136.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/17/2026Q08035309-S9Request digital key ↗
08/17/2026Q08035309-P2Request digital key ↗
08/17/2026Q08035309-P1Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
03/18/2023440761604Open ↗
02/06/2023421791564Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
09/07/2023440761604Open ↗
03/18/2023440761604Open ↗
▸BISWORK PERMIT APPLICATION1
07/26/2023421791564Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram6
08/17/2026Q08035309-P3Open ↗
08/17/2026Q08035309-I1Open ↗
08/15/2026Q08035309-A5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08035309-I1Open ↗
▸Seals & Professional Certifications55
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/17/2026Q08035309-S9Open ↗
08/17/2026Q08035309-S3Open ↗
08/17/2026Q08035309-S1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026Q08035309-S2Open ↗
09/01/2026Q08035309-S2Open ↗
08/31/2026Q08035309-P8Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q08035309-S8Open ↗
09/01/2026Q08035309-S2Open ↗
09/01/2026Q08035309-S2Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/18/2023440761604Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/18/2023440761604Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/17/2026Q08035309-AR01Open ↗
08/17/2026Q08035309-P4Open ↗
08/17/2026Q08035309-P3Open ↗
Showing 3 of 5 on file for this type
▸BISGAS CUT-OFF1
07/26/2023421791564Open ↗
▸BISSEWER CUT-OFF1
07/26/2023421791564Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist6
08/17/2026Q08035309-P3Open ↗
08/17/2026Q08035309-I1Open ↗
08/17/2026Q08035309-AR01Open ↗
Showing 3 of 6 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/26/2023421791564Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/04/2023440761604Open ↗
▸BISSTREET TREE CHECKLIST1
04/04/2023440761604Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q08035309-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08035309-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/26/2023421791564Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/17/2026Q08035309-S1Open ↗
08/13/2026Q08035309-P1Open ↗
08/13/2026Q08035309-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q08035309-S2Open ↗
08/13/2026Q08035309-S1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/26/2023421791564Open ↗
07/26/2023421791564Open ↗
07/26/2023421791564Open ↗
▸BISDOB APPROVAL FOR NEW CC1
09/07/2023440761604Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
07/26/2023421791564Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
07/26/2023421791564Open ↗
02/06/2023421791564Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/18/2023440761604Open ↗
▸BISEFILING COVER SHEET1
02/06/2023421791564Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/18/2023440761604Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial6
08/17/2026Q08035309-P3Open ↗
08/17/2026Q08035309-I1Open ↗
08/17/2026Q08035309-AR01Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/17/2026Q08035309-AR01Open ↗
08/17/2026Q08035309-P4Open ↗
08/17/2026Q08035309-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/17/2026Q08035309-P3Open ↗
08/17/2026Q08035309-AR01Open ↗
08/17/2026Q08035309-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q08035309-S2Open ↗
08/13/2026Q08035309-S1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/18/2023440761604Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
04/04/2023440761604Open ↗