← Back
Two stories - detached, small or mid-size
75 79 STREET
BROOKLYN · BIN 3150177
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R4AZoning
2,080 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,476 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 22p · 2 filings · 6 docs
Floor 11p · 1 filing · 4 docs
Cellar1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI205/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394105/07/2024
Building Lifecycle
All (5)Filed (2)Special Inspection (3)
05/07/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01045810-I1
05/07/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW COMBI. BOILERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01045814-I1
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
05/07/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
05/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
Nothing on file for this building.
1 project · most recent 05/07/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/07/2024——Gas, Water/Sanitary
1 project · most recent 05/07/2024
FiledStatusContractorScope
05/07/2024——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/07/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
05/07/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
05/07/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026B01045814-I1Request digital key ↗
08/25/2026B01045810-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01045810-I1Open ↗
08/13/2026B01045814-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026B01045810-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01045810-I1Open ↗