Office with commercial, 7-19 stories
Chelsea Market
75 9 AVENUE · BIN 1012541
💬 Discuss this project
1905Year Built
8Stories
O6Building Class
M1-5Zoning
1,100,533 sfGross Floor Area
167Units
LL97 Covered6 Open Violations ▸FISP: SWARMPFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: MANHATTAN CHELSEA MARKET LLC · 165,200 sf lot · 6.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction32p · 13 filings · 20 docs
BulkheadUnder Construction2p · 2 filings · 20 docs
Floor 87p · 5 filings · 20 docs
Floor 76p · 5 filings · 20 docs
Floor 615p · 8 filings · 20 docs
Floor 534p · 16 filings · 20 docs
Floor 423p · 15 filings · 20 docs
Floor 320p · 16 filings · 20 docs
Floor 239p · 14 filings · 20 docs
Floor 1122p · 23 filings · 20 docs
Mezzanine1p · 1 filing · 7 docs
Cellar78p · 22 filings · 20 docs
Basement3p · 1 filing · 9 docs
Sub-Basement34p · 4 filings · 20 docs
4 jobs · most recent 08/20/2026
Ventilation Systems Air Conditioning Systems Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2026Permit Issued4 MORI CONSTRUCTION INCVentilation Systems
Ventilation
Wells WVU 48 1,500 CFM · Kitchen Exhaust ×1
06/30/2026Permit IssuedSOUND REFRIGERATION & AIRAir Conditioning Systems, Ventilation Systems
Cooling
Climatemaster SR-024 2 tons · Crac Unit ×1
Ventilation
Climatemaster SR-024 800 CFM · Crac Unit ×1
01/24/2024Permit IssuedJTJ STUDIO CORPAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane 4TTR3060E1000NA 60,000 BTU · Condensing Unit ×1
TEM4B0C60S51SAA 60,000 BTU · Ahu ×1
Ventilation
Greenheck CSP-A390-VG 175 CFM · Exhaust Fan ×1
SQ-120-VG 1,300 CFM · Exhaust Fan ×1
Ducts & Piping
N/A n/a Ductwork ×1
05/19/2023Permit IssuedARP HOME IMPROVEMENT CORPVentilation Systems
Ventilation
__Junk__ Custom 1,000 CFM · Kitchen Exhaust ×1
5 jobs · most recent 11/07/2025
FiledStatusContractorScope
11/07/2025Signed-offAGGRESSIVE FIRE PROT LLC2 heads
01/24/2024Permit IssuedCROSSFIELD PLBG.&HTG.CORP—
03/26/2020Permit IssuedSTANDARD FIRE PROTECT LLC54 heads, 4 outlets
02/27/2020Signed-offKG SPRINKLER CORP13 heads
10/30/2019Signed-offABCO PEERLESS SPRINKLER C13 heads
4 jobs · most recent 11/07/2025
Water/Sanitary Gas
FiledStatusContractorScope
11/07/2025———
01/24/2024Signed-offAP PLUMBING & HVAC LLCWater/Sanitary
03/26/2020Signed-offJOE PARZIALE PLUMBING COGas, Water/Sanitary
10/30/2019Signed-offTRISTATE PLBG SVCS CORPWater/Sanitary
25 jobs · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
03/26/2026CompleteFRED GELLER ELEC'L INC.General Wiring
01/16/2026Permit IssuedNEE ELECTRICAL, LLC—
11/21/2025CompleteFRED GELLER ELEC'L INC.General Wiring
11/06/2025CompleteAXCEL ELECTRIC CO., INC.—
10/22/2025Permit IssuedTITAN ELEC'L & ELEV CONTR—
10/22/2025Permit IssuedTITAN ELEC'L & ELEV CONTRGeneral Wiring
10/22/2025CompleteTITAN ELEC'L & ELEV CONTR—
10/22/2025Permit IssuedTITAN ELEC'L & ELEV CONTRGeneral Wiring
10/22/2025CompleteTITAN ELEC'L & ELEV CONTRGeneral Wiring
10/22/2025Permit IssuedTITAN ELEC'L & ELEV CONTRGeneral Wiring
10/22/2025CompleteTITAN ELEC'L & ELEV CONTRGeneral Wiring
04/25/2025CompleteFRED GELLER ELEC'L INC.General Wiring
03/28/2025CompleteAXCEL ELECTRIC CO., INC.—
01/31/2025Permit IssuedTITAN ELEC'L & ELEV CONTR—
1 job · most recent 10/31/2022
Concrete
FiledStatusContractorScope
10/31/2022Permit IssuedL&K PARTNERS, INCConcrete
3 jobs · most recent 10/10/2024
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/10/2024Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
05/10/2024Permit IssuedROYAL CONCRETE AND MASON*Scaffold
06/12/2018Permit IssuedTRI BOROUGH SCAFFOLDINGScaffold
2 jobs · most recent 10/10/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
10/10/2024Permit IssuedM & L SIGNS, INCSuspended Scaffold (SC)
06/25/2024Permit IssuedM & L SIGNS, INC—
Building Lifecycle
All (300)Filed (75)Permit Issued (58)Signed Off (34)Violation (10)Inspection (32)Objection (61)Special Inspection (30)
09/09/2026
Objection raised — Other
09/09/2026
Objection resolved — Addressed
09/09/2026
Objection resolved — Addressed
09/09/2026
Objection resolved — Addressed
09/09/2026
Objection resolved — Addressed
08/25/2026
Filed — Alteration
INSTALLATION OF A SELF-CONTAINED VENTLESS HOOD FOR ELECTRIC COOKING EQUIPMENT IN AN EX. COMMERCIAL KITCHEN. SCOPE OF WORK DOES NOT REQUIRE CHANGE IN OCCUPANCY, EGRESS, OR USE.
M01450201-I1
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Special inspection requirement — Lighting controls
Adrian Figueroa
08/25/2026
Special inspection requirement — Final
Spencer Goroff
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
08/25/2026
Special inspection requirement — Interior lighting power
Adrian Figueroa
08/24/2026
Objection raised — Other
08/24/2026
Special inspection requirement — Mechanical Systems
Spencer Goroff
08/24/2026
Special inspection requirement — Final
Spencer Goroff
08/21/2026
Filed — No Work
M01445444-I1
08/20/2026
Filed — Alteration
INTERIOR RENOVATION TO AN EXISTING COMMERCIAL SPACE (720 SF). NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS REQUIRED.
M01390049-P1
07/31/2026
Special inspection requirement — Final
Spencer Goroff
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
07/31/2026
Special inspection requirement — Lighting controls
Adrian Figueroa
07/31/2026
Special inspection requirement — Interior lighting power
Adrian Figueroa
07/17/2026
Signed off — Alteration
REPLACE ONE (1) DUCTLESS SPLIT AC SYSTEM PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01374064-I1
07/16/2026
Filed — Alteration
REPLACE ONE (1) DUCTLESS SPLIT AC SYSTEM PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01374064-P1
07/16/2026
Special inspection requirement — Mechanical Systems
Joseph Bazini
07/16/2026
Special inspection requirement — Final
Joseph Bazini
07/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/09/2026
Permit issued — General Construction
M00971404-I1-GC
06/30/2026
Filed — Alteration
REPLACE ONE (1) COMPUTER ROOM AIR CONDITIONING (CRAC) UNIT ON SECOND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01366770-I1
06/30/2026
Permit issued — Mechanical Systems
M01366770-I1-MS
06/23/2026
Signed off — Alteration
M01353563-I1
06/22/2026
Filed — Alteration
M01353563-P1
06/04/2026
Signed off — Alteration
M01300996-I1
05/27/2026
Permit issued — General Construction
M01299154-I1-GC
05/22/2026
Objection resolved — Addressed
05/20/2026
Objection resolved — Addressed
05/20/2026
Objection resolved — Addressed
05/17/2026
Objection raised — Other
05/17/2026
Objection raised — Other
05/17/2026
Objection raised — Other
05/15/2026
Filed — No Work
M01396637-I1
05/13/2026
Signed off — Alteration
Modification of sprinkler system. Installation of new sprinkler heads in relocated phone booths.
M01295903-I1
05/08/2026
Permit issued — General Construction
M01374064-I1-GC-CX
05/06/2026
Permit issued — General Construction
M01390049-I1-GC
05/05/2026
Filed — Alteration
REPLACE ONE (1) DUCTLESS SPLIT AC SYSTEM PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01374064-I1
05/04/2026
Permit issued — General Construction
M01381146-I1-GC
04/23/2026
Filed — Alteration
SIDEWALK REPLACEMENT AND VAULT REPAIR PROJECT NO CHANGE IN USE EGRESS OR OCCUPANCY
M01299154-P2
04/23/2026
Filed — Alteration
Interior demolition on the 1st floor (former Maker Studio Eat and Beats) as indicated on drawings.
M01381146-I1
04/23/2026
Special inspection requirement — Masonry
BRIAN O'CONNOR
04/23/2026
Special inspection requirement — Concrete - Cast-In-Place
BRIAN O'CONNOR
04/23/2026
Special inspection requirement — Final
04/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN O'CONNOR
04/21/2026
Filed — Alteration
INTERIOR RENOVATION TO AN EXISTING COMMERCIAL SPACE (720 SF). NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS REQUIRED.
M01390049-I1
04/21/2026
Filed — Alteration
INTERIOR RENOVATION TO AN EXISTING COMMERCIAL SPACE (720 SF). NO CHANGE IN USE, OCCUPANCY, OR EGRESS IS REQUIRED.
M01390049-S1
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
03/31/2026
Special inspection requirement — Final
Alfonso DElia
03/23/2026
Filed — Alteration
SIDEWALK REPLACEMENT AND VAULT REPAIR PROJECT NO CHANGE IN USE EGRESS OR OCCUPANCY
M01299154-P1
03/23/2026
Special inspection requirement — Final
03/23/2026
Special inspection requirement — Concrete - Cast-In-Place
03/23/2026
Special inspection requirement — Masonry
03/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JLL14709/13/2026
GOOGLE8907/08/2026
PLATINUM SERVICES NY1007/08/2026
TACONIC MANAGEMENT11207/08/2026
TRI BOROUGH SCAFFOLDING303/22/2026
MANHATTAN CHELSEA MARKET LLC9903/22/2026
COLGATE RESTORATION203/22/2026
JAMES TWON PROPERTIES603/22/2026
AGBCW 85 TENTH LLC203/22/2026
XINOS CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/20/2018$2.4B—— → —$2,178/sf building
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHETYPE CONSULTANTS8203/21/2026
RIZZO GROUP5203/21/2026
D R BROWN203/21/2026
EXPEDIENT CONSULTING203/21/2026
A1 EXPEDITING SERVICE CORP.3503/21/2026
JENNY FLORES EXPEDITING503/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
KD DESIGNS203/21/2026
JP EXPEDITE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BENCHMARK BUILDERS LLCGeneral Contractor2207/08/2026
PLN INCGeneral Contractor1203/21/2026
L&K PARTNERS, INCGeneral Contractor1107/08/2026
ROYAL CONCRETE AND MASON*General Contractor1107/10/2026
JTJ STUDIO CORPGeneral Contractor1007/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection907/08/2026
SOUND REFRIGERATION & AIRGeneral Contractor807/08/2026
TRISTATE PLBG SVCS CORPPlumbing507/08/2026
ARP HOME IMPROVEMENT CORPGeneral Contractor403/21/2026
TERRANOVA CONTRACTING CORGeneral Contractor404/09/2026
M&T PLBG AND HTG CO., INCPlumbing407/08/2026
PACE PLUMBING CORPFire Protection407/08/2026
ADCO ELEC'L CORPElectrical403/22/2026
STANDARD FIRE PROTECT LLCFire Protection407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor307/08/2026
HENEGAN CONSTRUCTION CO.,General Contractor307/08/2026
TRISTATE AIR CONDITIONINGGeneral Contractor303/21/2026
WESBUILT CONSTRUCTION MANGeneral Contractor307/08/2026
ATLAS PRO CONSTRUCTIONGeneral Contractor303/21/2026
ASHLAR MECHANICAL CORPFire Protection307/08/2026
COMPLEX DEVELOPMENT INCGeneral Contractor303/21/2026
ALED TECHNOLOGIES INCGeneral Contractor303/21/2026
HARBOUR MECHANICAL CORPGeneral Contractor307/08/2026
GREAT CITY MECHANICAL INCFire Protection307/08/2026
EXA USA,CORPGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SE INSPECTIONS7486408/25/2026
BAZINI ENGINEERING, P.C.1808507/16/2026
BENAZZI ENGINEERING, PC5603106/30/2026
ROCK ARCH ENG CORP1760504/23/2026
KEYOWNER ENGINEERING, P.C4817103/04/2026
MILROSE CONSULTANTS LLC20031511/07/2025
ANZ CONSULTING ENGINEERIN3946204/16/2025
NEW AGE ENGINEERING PLLC7746603/10/2025
SOCOTEC ENGINEERING49832003/07/2025
PCS ENGINEERING3745410/10/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedROYAL CONCRETE AND MASON*07/09/2026
DOB NOWMechanical SystemsPermit IssuedSOUND REFRIGERATION & AIR06/30/2026
DOB NOWGeneral ConstructionPermit IssuedROYAL CONCRETE AND MASON*05/27/2026
DOB NOWGeneral ConstructionSigned-offSOUND REFRIGERATION & AIR05/08/2026
DOB NOWGeneral ConstructionPermit Issued4 MORI CONSTRUCTION INC05/06/2026
DOB NOWGeneral ConstructionPermit IssuedA.R. EQUIPMENT LLC05/04/2026
DOB NOWGeneral ConstructionPermit IssuedTERRANOVA CONTRACTING COR03/12/2026
DOB NOWGeneral ConstructionSigned-offSOUND REFRIGERATION & AIR03/05/2026
DOB NOWGeneral ConstructionSigned-offSOUND REFRIGERATION & AIR12/02/2025
DOB NOWMechanical SystemsSigned-offSOUND REFRIGERATION & AIR12/02/2025
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC11/18/2025
DOB NOWSupported ScaffoldPermit IssuedROYAL CONCRETE AND MASON*11/12/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC11/10/2025
DOB NOWPlumbingPermit IssuedSTANDARD FIRE SUPP CORP08/11/2025
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC07/23/2025
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC07/23/2025
DOB NOWGeneral ConstructionPermit IssuedROYAL CONCRETE AND MASON*07/14/2025
DOB NOWGeneral ConstructionSigned-offINS CONSTRUCTION CORP06/17/2025
DOB NOWStructuralSigned-offINS CONSTRUCTION CORP06/17/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH05/20/2025
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC03/17/2025
DOB NOWMechanical SystemsSigned-offCANNON MECHANICAL INC03/14/2025
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC03/13/2025
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR11/21/2024
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC11/13/2024
DOB NOWMechanical SystemsSigned-offPLN INC10/28/2024
DOB NOWGeneral ConstructionSigned-offPLN INC10/22/2024
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC07/31/2024
DOB NOWGeneral ConstructionPermit IssuedROYAL CONCRETE AND MASON*07/15/2024
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC06/28/2024
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC05/10/2024
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP04/05/2024
DOB NOWSupported ScaffoldPermit IssuedROYAL CONCRETE AND MASON*03/28/2024
DOB NOWMechanical SystemsSigned-offCOMPLEX DEVELOPMENT INC03/20/2024
DOB NOWMechanical SystemsSigned-offSOUND REFRIGERATION & AIR03/08/2024
DOB NOWSprinklersSigned-offSTANDARD FIRE SUPP CORP02/22/2024
DOB NOWGeneral ConstructionSigned-offREIDY CONTRACTING GROUP02/14/2024
DOB NOWGeneral ConstructionPermit IssuedROYAL CONCRETE AND MASON*02/13/2024
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC02/08/2024
DOB NOWGeneral ConstructionPermit IssuedL&K PARTNERS, INC02/05/2024
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 57
DateTypeResultReport
07/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/04/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2024Fail-Final CND-Occupancy InspectionFailView ↗
03/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 57.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/25/2026Interior lighting powerAdrian Figueroaenergy_progress
08/25/2026Lighting controlsAdrian Figueroaenergy_progress
08/25/2026Fire-Resistant Penetrations and JointsSpencer Goroffspecial
08/25/2026FinalSpencer Goroffprogress
08/24/2026FinalSpencer Goroffprogress
08/24/2026Mechanical SystemsSpencer Goroffspecial
07/31/2026FinalSpencer Goroffprogress
07/31/2026Lighting controlsAdrian Figueroaenergy_progress
07/31/2026Fire-Resistant Penetrations and JointsSpencer Goroffspecial
07/31/2026Interior lighting powerAdrian Figueroaenergy_progress
07/16/2026Mechanical SystemsJoseph Bazinispecial
07/16/2026FinalJoseph Baziniprogress
04/23/2026MasonryBRIAN O'CONNORspecial
04/23/2026Structural Stability – Alterations of existing buildingsBRIAN O'CONNORspecial
04/23/2026Final—progress
04/23/2026Concrete - Cast-In-PlaceBRIAN O'CONNORspecial
04/21/2026Fire-Resistant Penetrations and JointsSpencer Goroffspecial
03/31/2026FinalAlfonso DEliaprogress
03/23/2026Concrete - Cast-In-Place—special
03/23/2026Masonry—special
03/23/2026Structural Stability – Alterations of existing buildings—special
03/23/2026Final—progress
03/16/2026Maintenance informationGregory Benazzienergy_progress
03/16/2026HVAC-R and service water piping design and insulationGregory Benazzienergy_progress
03/16/2026HVAC-R and service water heating system controlsGregory Benazzienergy_progress
Latest 25 of 150.
▾Documents — 11,704 on file (BIS + DOB NOW)
▸Plans & Drawings206
▸DOB NOWPlans/Sketch129
09/06/2026M01390049-I1Request digital key ↗
09/06/2026M01390049-P1Request digital key ↗
09/06/2026M00009015-I1Request digital key ↗
Showing 3 of 129 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly24
09/05/2026M00132715-I1Request digital key ↗
09/05/2026M00317712-I1Request digital key ↗
09/02/2026M00700509-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Plumbing16
09/05/2026M00222043-I1Request digital key ↗
09/05/2026M00222043-P1Request digital key ↗
09/05/2026M00235058-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler10
09/05/2026M00222043-I1Request digital key ↗
09/05/2026M00241359-I1Request digital key ↗
09/05/2026M00219636-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems9
09/05/2026M00203047-I1Request digital key ↗
09/05/2026M00241337-I1Request digital key ↗
09/04/2026M00345258-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
09/05/2026M00247673-I1Request digital key ↗
Showing 1 of 5 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
09/05/2026M00219636-I1Request digital key ↗
09/04/2026M00349741-I1Request digital key ↗
Showing 2 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/05/2026M00209883-I1Request digital key ↗
09/05/2026M00258596-I1Request digital key ↗
09/04/2026M00306036-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00459176-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00248460-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00312788-I1Request digital key ↗
▸Applications & Permits2,214
▸BISPLAN / WORK APPROVAL APPLICATION1,276
03/02/2026104025706Open ↗
02/13/2026104025706Open ↗
02/10/2026104025706Open ↗
Showing 3 of 1,276 on file for this type
▸BISWORK PERMIT APPLICATION870
09/10/2021123112719Open ↗
11/09/2020123112719Open ↗
Showing 2 of 870 on file for this type
▸BISPLACE OF ASSEMBLY37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit15
09/03/2026M00629476-I1Open ↗
09/02/2026M00762865-I1Open ↗
Showing 2 of 15 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Seals & Professional Certifications2,912
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1,728
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1,728 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST309
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 309 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT259
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 259 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature192
09/06/2026M00009015-I1Open ↗
09/05/2026M00146133-I1Open ↗
09/05/2026M00189213-I1Open ↗
Showing 3 of 192 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM133
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 133 on file for this type
▸DOB NOWProgress Inspector Seal & Signature128
09/29/2026M00718964-P1Open ↗
09/29/2026M00718964-P1Open ↗
09/29/2026M08027198-I1Open ↗
Showing 3 of 128 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature100
09/29/2026M00586111-P2Open ↗
09/29/2026M00718964-P1Open ↗
09/29/2026M08027198-I1Open ↗
Showing 3 of 100 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISPC FULL REPORT12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISProfessional and Owner Certification (POC3)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment1,360
▸BISSELF-CERT PLUMBING NOTICE332
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 332 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE300
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 300 on file for this type
▸BISSCHEDULE B - PLUMBING218
12/16/2020123553387Open ↗
Showing 1 of 218 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA163
02/16/2021123589955Open ↗
Showing 1 of 163 on file for this type
▸BISEQUIPMENT USE PERMITS162
08/02/2021123822355Open ↗
07/29/2021123822355Open ↗
05/19/2021123903589Open ↗
Showing 3 of 162 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT125
08/02/2021123822355Open ↗
07/29/2021123822355Open ↗
07/29/2021123822355Open ↗
Showing 3 of 125 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8548
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-8412
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸Safety & Tenant Protection90
▸DOB NOWHPD-1: Anti-Harassment Area Checklist58
09/03/2026M00629566-I1Open ↗
09/03/2026M00629566-P1Open ↗
09/03/2026M00629476-I1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWCertificate of No Harassment19
09/03/2026M00629476-I1Open ↗
Showing 1 of 19 on file for this type
▸BISSTREET TREE CHECKLIST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTenant Protection Plan and Notes5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Environmental & Asbestos761
▸BISASBESTOS: CERTIFICATION (DEP ACP5)399
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 399 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'159
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 159 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report145
09/06/2026M01390049-I1Open ↗
09/06/2026M01390049-P1Open ↗
09/05/2026M00203047-I1Open ↗
Showing 3 of 145 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance145
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS64
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 64 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS33
03/18/2021140900808Open ↗
03/18/2021140900755Open ↗
03/17/2021140900791Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: ENERGY15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY15
03/31/2021140900808Open ↗
03/31/2021140900808Open ↗
03/18/2021140900755Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis6
09/02/2026M00762865-I1Open ↗
Showing 1 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports93
▸BISTECHNICAL REPORT: RESPONSIBILITY65
03/14/2025120286779Open ↗
03/14/2025120220929Open ↗
03/14/2025120283503Open ↗
Showing 3 of 65 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs1,181
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST754
01/12/2023123112719Open ↗
10/27/2022123465696Open ↗
07/29/2021123822355Open ↗
Showing 3 of 754 on file for this type
▸BISADMINISTRATIVE OBJECTIONS212
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 212 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION125
08/20/2025104025706Open ↗
Showing 1 of 125 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE68
02/10/2026104025706Open ↗
04/10/2025104025706Open ↗
04/02/2025104025706Open ↗
Showing 3 of 68 on file for this type
▸BISSUPERSEDING LETTER21
09/10/2021123112719Open ↗
Showing 1 of 21 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership1,168
▸BISCOST AFFIDAVIT1,168
06/27/2022123465696Open ↗
06/22/2022123465696Open ↗
07/29/2021123822355Open ↗
Showing 3 of 1,168 on file for this type
▸Filing & Intake Forms1,389
▸BISEFILING COVER SHEET625
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 625 on file for this type
▸BISADDITIONAL INFORMATION409
08/07/2024104025706Open ↗
08/07/2024104025706Open ↗
08/07/2024104025706Open ↗
Showing 3 of 409 on file for this type
▸BISBOROUGH INTAKE FORM315
09/10/2021123112719Open ↗
11/09/2020123112719Open ↗
10/30/2020123112719Open ↗
Showing 3 of 315 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents101
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION72
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 72 on file for this type
▸DOB NOWProof of Historic Building11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPLOT DIAGRAM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWManufacturer's Specifications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWCalculations4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWApproved Plans with no change in layout1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 21
09/05/2026M00247673-I1Open ↗
▸DOB NOWAlternate Plan 11
09/05/2026M00247673-I1Open ↗