Over six families without stores
75 CABRINI BOULEVARD
MANHATTAN · BIN 1064303
💬 Discuss this project
1910Year Built
5Stories
C1Building Class
R7-2Zoning
20,670 sfGross Floor Area
29Units
Rent Stabilized33 Open Violations ▸
Over six families without stores · Owner of record: RPN MANAGEMENT CO INC · 5,500 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RPN MANAGEMENT CO. 1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.803/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & C HEATING SERVICES INGeneral Contractor207/08/2026
A & C HTG SERVICES, INCPlumbing207/08/2026
JOHN MOOREElectrical103/21/2026
GSB PLUMBING & HEATING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851803/30/2022
Building Lifecycle
All (100)Filed (8)Permit Issued (7)Signed Off (4)Violation (60)Inspection (3)Special Inspection (18)
10/11/2025
Violation issued (HPD, closed)
C
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
A
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
A
08/18/2024
Violation issued (HPD, open)
A
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
B
08/18/2024
Violation issued (HPD, open)
B
04/01/2024
Violation issued (HPD, closed)
A
12/02/2023
Violation issued (HPD, open)
B
12/02/2023
Violation issued (HPD, open)
C
09/02/2022
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00608273-I1
05/29/2022
Violation issued (HPD, open)
B
05/26/2022
Signed off — Alteration
INSTALL CHIMNEY LINER PER PLANS.
M00608289-I1
05/26/2022
Signed off — Alteration
REPLACE BOILER AND BURNER.
M00608257-I1
05/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/27/2022
Violation issued (HPD, open)
B
04/27/2022
Violation issued (HPD, open)
A
04/27/2022
Violation issued (HPD, open)
A
04/27/2022
Violation issued (HPD, open)
A
03/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
03/31/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
03/30/2022
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00608273-P2
03/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/11/2022
Filed — Alteration
INSTALL CHIMNEY LINER PER PLANS.
M00608289-P1
03/11/2022
Filed — Alteration
REPLACE BOILER AND BURNER.
M00608257-P1
03/11/2022
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00608273-P1
03/11/2022
Special inspection requirement — Mechanical Systems
LOUIS ARENA
03/11/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
03/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/11/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
03/11/2022
Special inspection requirement — Chimneys and vents
LOUIS ARENA
03/11/2022
Special inspection requirement — Final
LOUIS ARENA
03/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
03/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/03/2022
Special inspection requirement — Chimneys and vents
LOUIS ARENA
03/03/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
03/03/2022
Special inspection requirement — Mechanical Systems
LOUIS ARENA
03/03/2022
Special inspection requirement — Final
LOUIS ARENA
03/03/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
03/03/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
03/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/22/2022
Permit issued — Boiler Equipment
M00608257-I1-BE
02/22/2022
Permit issued — Mechanical Systems
M00608289-I1-MS
01/27/2022
Permit issued — Plumbing
M00608273-I1-PL
11/15/2021
Permit issued — Mechanical Systems
M00608289-I1-MS
11/12/2021
Permit issued — Plumbing
M00608273-I1-PL
11/12/2021
Permit issued — Boiler Equipment
M00608257-I1-BE
11/08/2021
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00608273-I1
11/08/2021
Filed — Alteration
INSTALL CHIMNEY LINER PER PLANS.
M00608289-I1
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC02/22/2022
DOB NOWMechanical SystemsSigned-offA & C HEATING SERVICES IN02/22/2022
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP01/27/2022
DOB NOWMechanical SystemsSigned-offA & C HEATING SERVICES IN11/15/2021
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP11/12/2021
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC11/12/2021
DOB NOWPlumbingSigned-offGSB PLUMBING & HEATING CO11/27/2019
BISOTISSUEDROYAL BUILDERS GROUP INC04/24/2014
BISOTISSUEDROYAL BUILDERS GROUP INC04/24/2014
BISOTISSUEDJEPOL CONSTRUCTION INC12/06/2013
BISOTISSUEDJEPOL CONSTRUCTION INC08/20/2013
2 projects · most recent 08/15/2022
Boiler Controls
FiledStatusContractorScope
08/15/2022CompleteJOHN H. MOOREBoiler Controls
12/01/2021CompleteJOHN H. MOOREBoiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/31/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/31/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
03/11/2022Mechanical SystemsLOUIS ARENAspecial
03/11/2022Heating SystemsLOUIS ARENAspecial
03/11/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/11/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/11/2022Maintenance informationLOUIS ARENAenergy_progress
03/11/2022Chimneys and ventsLOUIS ARENAspecial
03/11/2022FinalLOUIS ARENAprogress
03/03/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/03/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/03/2022Chimneys and ventsLOUIS ARENAspecial
03/03/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
03/03/2022Mechanical SystemsLOUIS ARENAspecial
03/03/2022FinalLOUIS ARENAprogress
03/03/2022Heating SystemsLOUIS ARENAspecial
03/03/2022Maintenance informationLOUIS ARENAenergy_progress
03/03/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
09/03/2026M00608273-P1Request digital key ↗
09/03/2026M00608273-P2Request digital key ↗
09/03/2026M00608273-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00252346-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
05/01/2014121856955Open ↗
12/16/2013121856955Open ↗
08/22/2013121753272Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
12/05/2013121856955Open ↗
08/22/2013121753272Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature10
08/29/2026M00608257-P1Open ↗
08/29/2026M00608257-P1Open ↗
08/29/2026M00608257-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/05/2026M00252346-I1Open ↗
09/03/2026M00608273-I1Open ↗
09/03/2026M00608273-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/29/2026M00608257-P1Open ↗
08/28/2026M00608289-P1Open ↗
08/28/2026M00608289-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/22/2013121753272Open ↗
08/22/2013121753272Open ↗
12/05/2013121856955Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/05/2013121856955Open ↗
08/22/2013121753272Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
12/05/2013121856955Open ↗
08/22/2013121753272Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00252346-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/05/2026M00252346-I1Open ↗
09/03/2026M00608273-P1Open ↗
09/03/2026M00608273-P2Open ↗
Showing 3 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
12/05/2013121856955Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/22/2013121753272Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/22/2013121753272Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/05/2013121856955Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00608257-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00608257-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSUPERSEDING LETTER1
05/01/2014121856955Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/05/2013121856955Open ↗
08/22/2013121753272Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
12/05/2013121856955Open ↗
08/22/2013121753272Open ↗