← Back
Elevator cooperative
75 CENTRAL PARK WEST
MANHATTAN · BIN 1028243
💬 Discuss this project
1929Year Built
15Stories
D4Building Class
R10AZoning
117,150 sfGross Floor Area
56Units
LL97 CoveredRent Stabilized11 Open Violations ▸FISP: SAFE
Elevator cooperative · 10,041 sf lot · 11.67 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 112p · 1 filing · 20 docs
Floor 10Under Construction6p · 1 filing · 20 docs
Floor 9
Floor 84p · 1 filing · 16 docs
Floor 7
Floor 6
Floor 52p · 1 filing · 3 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RUDD REALTY MGMT3907/08/2026
RUDD MANAGEMENT203/22/2026
RUDD103/22/2026
JP DAY REALTY103/22/2026
75 CENTRAL PARK WEST9603/21/2026
75 CPW2103/21/2026
COLGATE ENTERPRISE303/21/2026
75 CENTRAL PARK903/21/2026
C O RUDD REALTY MANAGEMENT203/21/2026
75 CENTRAL PARK WESY C O RUDD203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DHD ARCHITECTURE603/21/2026
J A EXPEDITING1003/21/2026
GREEN LIGHT EXPEDITING LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLDNY INCGeneral Contractor307/08/2026
NERTON CONSTRUCTION INCGeneral Contractor303/21/2026
BIRNBAUM, ALANElectrical203/21/2026
TOUGH STALLION LLCElectrical203/21/2026
HOMECREST INCGeneral Contractor203/21/2026
NU-WAY HEATING & COOLINGGeneral Contractor203/21/2026
DYNAMIC BLUE WATER MECHPlumbing207/08/2026
FIVE STAR P&H CO,INCPlumbing207/08/2026
TOP DOG PLBG & HTG CORPPlumbing207/08/2026
VAN KLEECK, ADAMElectrical103/21/2026
F.M.A.CONSTRUCTION INCGeneral Contractor107/10/2026
AUTHENTIC PLBG CORPPlumbing109/07/2026
JL ARTS INCGeneral Contractor104/09/2026
DANIEL DRAGOMIRElectrical103/21/2026
EDWARDS ROLANDElectrical103/21/2026
JORDAN, JOSEPHElectrical103/21/2026
ROLAND EDWARDSElectrical103/21/2026
TONY DE FALCOElectrical103/21/2026
CLEMENT CHAMBERSElectrical103/21/2026
ULTIMATE ELECTL CONTG INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEONID BUKHGALTER, P.E.1150208/21/2026
SZEKELY ENGINEERING299105/25/2026
MOSCHELLA ARCHITECTURE9194105/20/2026
EP INSPECTIONS AND COMMIS7079207/11/2025
A2 ARCHITECT, PC2504201/29/2024
POLITI + SIANO ARCHITECTS5162310/22/2020
ANZ CONSULTING ENGINEERIN3946112/19/2019
Building Lifecycle
All (172)Filed (17)Permit Issued (15)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (10)Objection (19)Special Inspection (30)
09/08/2026
Objection resolved — Addressed
09/02/2026
Objection raised — Scope
08/31/2026
Permit issued — Plumbing
M01390391-S2-PL
08/21/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 5A ON 5TH FLOOR. RELOCATION OF NON-BEARING PARTITIONS, NEW INTERIOR FINISHES. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
M01325180-P1
08/12/2026
Special inspection requirement — Final
Leonid Bukhgalter
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Leonid Bukhgalter
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Leonid Bukhgalter
08/12/2026
Special inspection requirement — Lighting in dwelling units
Leonid Bukhgalter
07/09/2026
Permit issued — General Construction
M01390391-I1-GC
06/30/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
05/31/2026
Objection raised — Scope
05/28/2026
Objection raised — Scope
05/28/2026
Objection raised — Scope
05/25/2026
Filed — Alteration
Interior renovation in Apt. #10D on the 10th floor. No change to use, egress or occupancy.
M01390391-S1
05/20/2026
Filed — Alteration
Interior renovation in Apt. #10D on the 10th floor. No change to use, egress or occupancy.
M01390391-I1
05/20/2026
Filed — Alteration
Interior renovation in Apt. #10D on the 10th floor. No change to use, egress or occupancy.
M01390391-S2
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Moschella
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Richard Moschella
05/13/2026
Special inspection requirement — Lighting in dwelling units
Richard Moschella
05/13/2026
Special inspection requirement — Lighting controls
Richard Moschella
05/13/2026
Special inspection requirement — Interior lighting power
Richard Moschella
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Tom Szekely
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Tom Szekely
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Tom Szekely
05/12/2026
Special inspection requirement — Ventilation and air distribution system
Tom Szekely
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Tom Szekely
04/21/2026
Special inspection requirement — Final
Richard Moschella
04/21/2026
Special inspection requirement — Final
Tom Szekely
04/21/2026
Special inspection requirement — Mechanical Systems
Tom Szekely
03/25/2026
Signed off — Alteration
Replacement of existing mechanical units and mechanical exhaust in apartment 8B on the 8th floor. Mechanical work. No change in use, occupancy or egress.
M00906538-S1
03/20/2026
Signed off — Alteration
Replacement of existing mechanical units and mechanical exhaust in apartment 8B on the 8th floor. Mechanical work. No change in use, occupancy or egress.
M00906538-I1
02/02/2026
Permit issued — General Construction
M01325180-I1-GC
01/12/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT 5A ON 5TH FLOOR. RELOCATION OF NON-BEARING PARTITIONS, NEW INTERIOR FINISHES. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
M01325180-I1
12/11/2025
Permit issued — Plumbing
M00906538-S1-PL
12/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Leonid Bukhgalter
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Leonid Bukhgalter
11/26/2025
Special inspection requirement — Final
Leonid Bukhgalter
11/26/2025
Special inspection requirement — Lighting in dwelling units
Leonid Bukhgalter
09/23/2025
Permit issued — General Construction
M00906538-I1-GC
08/12/2025
Objection resolved — Resolved
08/12/2025
Objection resolved — Resolved
07/24/2025
Objection raised — Admin
07/24/2025
Objection raised — Scope
07/23/2025
Objection raised — Cost
07/11/2025
Filed — Alteration
Replacement of existing mechanical units and mechanical exhaust in apartment 8B on the 8th floor. Mechanical work. No change in use, occupancy or egress.
M00906538-S2
07/10/2025
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
07/10/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
MOLLY GLENN
07/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
05/13/2025
Permit issued — General Construction
M00906538-I1-GC
02/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/20/2024
Permit issued — Plumbing
M00906538-S1-PL
09/12/2024
Objection resolved — Addressed
09/06/2024
Permit issued — General Construction
M00906538-I1-GC
08/29/2024
Objection resolved — Addressed
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAUTHENTIC PLBG CORP08/31/2026
DOB NOWGeneral ConstructionPermit IssuedF.M.A.CONSTRUCTION INC07/09/2026
DOB NOWGeneral ConstructionPermit IssuedJL ARTS INC02/02/2026
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP12/11/2025
DOB NOWGeneral ConstructionSigned-offKLDNY09/23/2025
DOB NOWGeneral ConstructionSigned-offKLDNY05/13/2025
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP09/20/2024
DOB NOWGeneral ConstructionSigned-offKLDNY09/06/2024
DOB NOWPlumbingSigned-offFIVE STAR P&H CO,INC09/15/2022
DOB NOWPlumbingSigned-offFIVE STAR P&H CO,INC09/30/2021
DOB NOWGeneral ConstructionSigned-offHOMECREST INC09/02/2021
DOB NOWGeneral ConstructionSigned-offNU-WAY HEATING & COOLING09/01/2021
DOB NOWMechanical SystemsSigned-offNERTON CONSTRUCTION INC02/11/2021
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP02/25/2020
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP01/29/2020
BISOTISSUEDSTANDARD WATERPROOFING C03/29/2022
BISPLISSUEDFRED SMITH P&H CO INC01/14/2022
BISEQISSUEDCOLGATE ENTERPRISE CORP11/30/2021
BISOTISSUEDSTANDARD WATERPROOFING C03/03/2021
BISEQISSUEDCOLGATE ENTERPRISE CORP12/01/2020
BISOTISSUEDTIAGO & SONS ENTERPRISES07/27/2020
BISSPISSUEDWTC PLUMBING & HTG CORP07/22/2020
BISPLISSUEDABSOLUTE PLBG & HTG CORP06/05/2020
BISOTISSUEDNERTON CONSTRUCTION INC06/03/2020
BISOTISSUEDSTANDARD WATERPROOFING C03/23/2020
BISOTISSUEDHITE CONSTRUCTION INC03/12/2020
BISMHISSUEDHITE CONSTRUCTION INC03/12/2020
BISEQISSUEDCOLGATE ENTERPRISE CORP12/09/2019
BISOTISSUEDNERTON CONSTRUCTION INC12/03/2019
BISMHRE-ISSUEDPRECISION-AIRE INC09/03/2019
BISOTISSUEDTIAGO & SONS ENTERPRISES08/29/2019
BISOTISSUEDTIAGO & SONS ENTERPRISES07/23/2019
BISPLISSUEDABSOLUTE PLBG & HTG CORP04/30/2019
BISOTISSUEDHITE CONSTRUCTION INC04/23/2019
BISMHISSUEDHITE CONSTRUCTION INC04/23/2019
BISOTISSUEDSTANDARD WATERPROOFING C03/19/2019
BISEQISSUEDCOLGATE ENTERPRISE CORP12/17/2018
BISPLISSUEDBROOK PLUMBING & HTG CORP12/17/2018
BISMHISSUEDLEMPIRA INTERIORS NY LLC12/13/2018
BISOTISSUEDLEMPIRA INTERIORS NY LLC12/13/2018
+ 25 more permits on file
2 projects · most recent 05/25/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/25/2026Permit IssuedF.M.A.CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Task TYC021CAV 25,400 BTU · Condensing Unit ×1
TYC021TWC-30K 29,900 BTU · Condensing Unit ×1
Ventilation
Fantech DEDPV-705 80 CFM · Exhaust Fan ×1
Greenheck SP-850 50 BTU · Exhaust Fan ×1
07/11/2025Signed-offKLDNY INCAir Conditioning Systems, Ventilation Systems
Cooling
Friedrich WCT16B30A 15,400 BTU · Ptac ×2
WCT10A10A 10,000 BTU · Ptac ×1
WCTO8A10A 8,000 BTU · Ptac ×1
Ventilation
Greenheck SP-A70 50 CFM · Exhaust Fan ×1
2 projects · most recent 05/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/25/2026Permit IssuedAUTHENTIC PLBG CORPGas, Water/Sanitary
07/11/2025Signed-offDYNAMIC BLUE WATER MECHGas, Water/Sanitary
9 projects · most recent 09/02/2026
General Wiring
FiledStatusContractorScope
09/02/2026Permit IssuedVILLAGE ELECTL CONTRS INC1 meters, 1 new_meters
07/20/2026Permit IssuedVILLAGE ELECTL CONTRS INCGeneral Wiring
03/11/2026Permit IssuedPK ELECTRIC INCGeneral Wiring
09/03/2025CompleteTOP NOTCH ELECTRIC INCGeneral Wiring
04/10/2023CompleteULTIMATE ELECTL CONTG INC1 meters, 1 new_meters
04/07/2023CompleteULTIMATE ELECTL CONTG INCGeneral Wiring
01/14/2021CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
01/02/2020CompleteTWINTECH ELECTRIC INCGeneral Wiring
07/31/2019Permit IssuedPK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/21/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/06/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/12/2026FinalLeonid Bukhgalterprogress
08/12/2026Energy Code Compliance InspectionsLeonid Bukhgalterprogress
08/12/2026Fire-Resistant Penetrations and JointsLeonid Bukhgalterspecial
08/12/2026Lighting in dwelling unitsLeonid Bukhgalterenergy_progress
05/13/2026Fire-Resistant Penetrations and JointsRichard Moschellaspecial
05/13/2026Energy Code Compliance InspectionsRichard Moschellaprogress
05/13/2026Lighting in dwelling unitsRichard Moschellaenergy_progress
05/13/2026Lighting controlsRichard Moschellaenergy_progress
05/13/2026Interior lighting powerRichard Moschellaenergy_progress
05/13/2026Energy Code Compliance InspectionsTom Szekelyprogress
05/12/2026HVAC-R and service water piping design and insulationTom Szekelyenergy_progress
05/12/2026HVAC-R and service water heating system controlsTom Szekelyenergy_progress
05/12/2026Ventilation and air distribution systemTom Szekelyenergy_progress
05/12/2026HVAC-R and service water heating equipmentTom Szekelyenergy_progress
04/21/2026FinalRichard Moschellaprogress
04/21/2026FinalTom Szekelyprogress
04/21/2026Mechanical SystemsTom Szekelyspecial
11/26/2025Energy Code Compliance InspectionsLeonid Bukhgalterprogress
11/26/2025Fire-Resistant Penetrations and JointsLeonid Bukhgalterspecial
11/26/2025FinalLeonid Bukhgalterprogress
11/26/2025Lighting in dwelling unitsLeonid Bukhgalterenergy_progress
07/10/2025Post-installed AnchorsMOLLY GLENNspecial
07/10/2025Exhaust and Vent Systems in Plenums and DuctsMOLLY GLENNspecial
07/10/2025Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
08/14/2024Post-installed AnchorsMOLLY GLENNspecial
Latest 25 of 49.
▾Documents — 799 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch13
09/03/2026M00543482-P3Request digital key ↗
09/03/2026M00543482-P1Request digital key ↗
09/03/2026M00543482-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00244594-I1Request digital key ↗
09/04/2026M00244594-P5Request digital key ↗
09/04/2026M00244594-P6Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00244594-S1Request digital key ↗
▸Applications & Permits184
▸BISWORK PERMIT APPLICATION89
01/14/2022100899306Open ↗
11/30/2021140593702Open ↗
12/03/2020140593702Open ↗
Showing 3 of 89 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION79
05/26/2022100899306Open ↗
05/24/2022100899306Open ↗
05/20/2022100899306Open ↗
Showing 3 of 79 on file for this type
▸DOB NOWLPC Approval/Permit16
09/04/2026M00244594-I1Open ↗
09/04/2026M00244594-S1Open ↗
09/04/2026M00244594-P5Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications158
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION83
02/14/2020122874194Open ↗
02/06/2020123407143Open ↗
02/06/2020123407143Open ↗
Showing 3 of 83 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/23/2026M01325180-P1Open ↗
09/23/2026M01325180-P1Open ↗
09/23/2026M01325180-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/10/2026M01325180-P1Open ↗
09/04/2026M00244594-I1Open ↗
09/04/2026M00244594-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M01325180-P1Open ↗
08/31/2026M01390391-I1Open ↗
08/27/2026M00244594-P5Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/25/2019123845107Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/25/2019123845107Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment79
▸BISSCHEDULE B - PLUMBING27
05/26/2022100899306Open ↗
05/24/2022100899306Open ↗
05/20/2022100899306Open ↗
Showing 3 of 27 on file for this type
▸BISSELF-CERT PLUMBING NOTICE21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
02/14/2020123407143Open ↗
01/21/2020123407143Open ↗
01/06/2020123805203Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS8
06/09/2022100899306Open ↗
06/09/2022100899306Open ↗
06/01/2022100899306Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
06/09/2022100899306Open ↗
06/01/2022100899306Open ↗
04/20/2021123407143Open ↗
Showing 3 of 5 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes10
11/25/2019123845107Open ↗
05/16/2019123805203Open ↗
Showing 2 of 10 on file for this type
▸DOB NOWTenant Protection Plan4
09/04/2026M00244594-S1Open ↗
09/04/2026M00244594-I1Open ↗
09/04/2026M00244594-P5Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos45
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
12/04/2019123845107Open ↗
05/16/2019123805203Open ↗
12/19/2018123407143Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/04/2026M00244594-P6Open ↗
09/04/2026M00244594-I1Open ↗
09/04/2026M00244594-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/03/2026M00543482-I1Open ↗
08/13/2026M00906538-I1Open ↗
08/13/2026M00543481-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance52
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS32
11/25/2019123845107Open ↗
07/18/2019123805203Open ↗
07/01/2019123805203Open ↗
Showing 3 of 32 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
08/24/2022122874194Open ↗
08/13/2021123805203Open ↗
02/19/2021123845107Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/24/2022122874194Open ↗
08/13/2021123805203Open ↗
02/19/2021123845107Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
12/19/2018123407143Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00543481-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY14
08/24/2022122874194Open ↗
08/24/2022122874194Open ↗
08/24/2022122874194Open ↗
Showing 3 of 14 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
06/07/2022100899306Open ↗
06/07/2022100899306Open ↗
▸Approvals, Objections & Sign-offs73
▸BISLANDMARKS APPROVAL23
02/14/2020122874194Open ↗
11/26/2019123845107Open ↗
07/10/2019123805203Open ↗
Showing 3 of 23 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
01/18/2023140593702Open ↗
08/25/2022122874194Open ↗
06/08/2022100899306Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
11/30/2021140593702Open ↗
11/25/2020140593702Open ↗
07/23/2019123805203Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS SIGNOFF3
01/18/2023140593702Open ↗
08/25/2022122874194Open ↗
08/13/2021123805203Open ↗
▸BISSHED LETTER2
12/03/2020140593702Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
01/18/2023140593702Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership64
▸BISCOST AFFIDAVIT61
08/24/2022122874194Open ↗
06/01/2022100899306Open ↗
04/25/2022122874194Open ↗
Showing 3 of 61 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
07/23/2019123805203Open ↗
Showing 1 of 3 on file for this type
▸Filing & Intake Forms84
▸BISADDITIONAL INFORMATION36
08/17/2022122874194Open ↗
05/13/2022100899306Open ↗
04/06/2022140593702Open ↗
Showing 3 of 36 on file for this type
▸BISEFILING COVER SHEET29
11/25/2019123845107Open ↗
06/19/2019123805203Open ↗
05/16/2019123805203Open ↗
Showing 3 of 29 on file for this type
▸BISBOROUGH INTAKE FORM18
11/30/2021140593702Open ↗
12/03/2020140593702Open ↗
11/25/2020140593702Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/23/2019123805203Open ↗
Showing 1 of 3 on file for this type
▸BISUnknown3
02/14/2020122874194Open ↗
02/14/2020122874194Open ↗
02/14/2020122874194Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
06/01/2022100899306Open ↗
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
08/25/2022122874194Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00906538-I1Open ↗