← Back
Office only, 7-19 stories
Health Building
75 CENTRE STREET · BIN 1001831
💬 Discuss this project
1934Year Built
10Stories
O3Building Class
C6-4Zoning
353,000 sfGross Floor Area
10Units
LL97 Covered26 Open Violations 19 unresolved · 7 paperwork only ▸FISP: SAFEFDNY Report ↗
Office only, 7-19 stories · 41,040 sf lot · 8.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalFire Protection
Roof10p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DCAS5107/08/2026
J N CONSTRUCTION GROUP803/22/2026
DCAS 8 856203/22/2026
D N CONST CONSULTNG303/22/2026
DCAS 8561003/22/2026
CITYWIDE ADMIN SERVICES403/22/2026
DEPARTMENT OF HEALTH203/22/2026
DEPT OF CITY WIDE ADMI856503/22/2026
DEPT CITY WIDE ADINIST856203/22/2026
DEPT OF CIDE WIDE ADMI856103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOEL PHAGOO P.E. PLLC501/13/2023
SUPERSTRUCTURES ENG. + ARCH.210/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
SUPERSTRUCTURES ENG + ARCH203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & N CONSTRUCTION GROUPGeneral Contractor2207/08/2026
FUKSBRUMER, ISRAELElectrical603/21/2026
FREDERICK LEEElectrical203/21/2026
GJOKO PETROVSKIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOEL PHAGOO ,PE, PLLC2416211/22/2022
SUPERSTRUCTURES ENGINEERI374110/17/2022
Building Lifecycle
All (104)Filed (8)Permit Issued (11)Signed Off (6)Facade (FISP) (15)Violation (60)Special Inspection (4)
01/29/2026
Violation issued (FDNY_ORDER, closed)
11/12/2025
Violation issued (FDNY_NOV, closed)
07/28/2025
Cycle 9 facade report signed — SAFE
07/18/2025
Violation issued (FDNY_ORDER, closed)
07/18/2025
Violation issued (FDNY_ORDER, closed)
07/10/2025
Signed off — Alteration
M00788664-I1
07/09/2025
Violation issued (ECB, open)
Unknown
07/07/2025
Signed off — Alteration
Roof repairs as per the plans filed including: Replacement of roofing membrane, retrofit roof drains and roof perimeter flashing at stone wall, HVAC unit, dunnage, pitch pocket & masonry parapet. Stone pinning. Joint sealant replacement.
M00710891-I1
07/01/2025
Cycle 9 facade report submitted
06/24/2025
Cycle 9 facade inspection completed
06/02/2025
Violation issued (ECB, open)
Construction
05/07/2025
Violation issued (ECB, closed)
Construction
03/18/2025
Violation issued (FDNY_NOV, closed)
11/05/2024
Signed off — Alteration
SUSPENDED SCAFFOLD OUTRIGGER AND MATERIAL HOIST SYSTEM AT 125 WORTH STREET, MANHATTAN.
M01012572-I1
09/18/2024
Signed off — Alteration
M08043717-I1
05/23/2024
Violation issued (ECB, open)
Unknown
05/08/2024
Permit issued — General Construction
M00788664-I1-GC
05/08/2024
Violation issued (ECB, closed)
Unknown
05/08/2024
Violation issued (ECB, closed)
Construction
05/08/2024
Violation issued (ECB, closed)
Construction
05/08/2024
Violation issued (ECB, closed)
Construction
05/07/2024
Violation issued (ECB, closed)
Construction
03/13/2024
Permit issued — Suspended Scaffold
M01012572-I1-SC
02/29/2024
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER AND MATERIAL HOIST SYSTEM AT 125 WORTH STREET, MANHATTAN.
M01012572-I1
01/30/2024
Violation issued (FDNY_NOV, closed)
01/16/2024
Violation issued (ECB, open)
Local Law
12/19/2023
Violation issued (FDNY_NOV, closed)
12/12/2023
Signed off — Alteration
M00711995-I1
12/12/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00711983-I1
12/12/2023
Permit issued — Sidewalk Shed
M08040598-I1-SH
12/12/2023
Permit issued — General Construction
M00710891-I1-GC
12/12/2023
Permit issued — Supported Scaffold
M08043717-I1-SF
10/18/2023
Violation issued (FDNY_ORDER, closed)
10/18/2023
Violation issued (FDNY_ORDER, closed)
03/08/2023
Violation issued (FDNY_NOV, closed)
03/06/2023
Permit issued — General Construction
M00788664-I1-GC
03/06/2023
Violation issued (ECB, closed)
Construction
01/13/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08040598-P1
11/23/2022
Permit issued — Supported Scaffold
M08043717-I1-SF
11/22/2022
Filed — Alteration
M08043717-I1
11/22/2022
Permit issued — Sidewalk Shed
M08040598-I1-SH
11/21/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08040598-I1
11/21/2022
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
10/17/2022
Filed — Alteration
M00788664-I1
09/01/2022
Violation issued (FDNY_ORDER, closed)
09/01/2022
Violation issued (FDNY_ORDER, closed)
09/01/2022
Violation issued (FDNY_ORDER, closed)
07/22/2022
Cycle 9 facade report submitted
07/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/19/2022
Cycle 9 facade report signed — UNSAFE
06/24/2022
Cycle 9 facade inspection completed
05/20/2022
Permit issued — General Construction
M00710891-I1-GC
05/03/2022
Filed — Alteration
Roof repairs as per the plans filed including: Replacement of roofing membrane, retrofit roof drains and roof perimeter flashing at stone wall, HVAC unit, dunnage, pitch pocket & masonry parapet. Stone pinning. Joint sealant replacement.
M00710891-I1
04/08/2022
Permit issued — Protection and Mechanical Methods
M00711995-I1-PM
04/07/2022
Filed — Alteration
M00711995-I1
04/07/2022
Permit issued — Supported Scaffold
M00711983-I1-SF
04/05/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00711983-I1
04/04/2022
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
04/01/2022
Violation issued (FDNY_NOV, closed)
04/01/2022
Special inspection requirement — Final
Paul Millman
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP05/08/2024
DOB NOWSuspended ScaffoldSigned-offD&N CONST & CONSULTNG INC03/13/2024
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP12/12/2023
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP12/12/2023
DOB NOWSupported ScaffoldSigned-offJ & N CONSTRUCTION GROUP12/12/2023
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP03/06/2023
DOB NOWSupported ScaffoldSigned-offJ & N CONSTRUCTION GROUP11/23/2022
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP11/22/2022
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP05/20/2022
DOB NOWProtection and Mechanical MethodsSigned-offJ & N CONSTRUCTION GROUP04/08/2022
DOB NOWSupported ScaffoldSigned-offJ & N CONSTRUCTION GROUP04/07/2022
BISEQISSUEDAAA WINDOWS & DOORS CORP11/04/2022
BISEQISSUEDAAA WINDOWS & DOORS CORP06/15/2020
BISMHISSUEDC. D. E. AIR-CONDITIONING10/12/2018
BISEQISSUEDAAA WINDOWS & DOORS CORP06/27/2018
BISMHISSUEDC. D. E. AIR-CONDITIONING02/14/2018
BISPLISSUEDEASTERN PLBG & MECH CONTR10/16/2017
BISMHISSUEDC. D. E. AIR-CONDITIONING10/16/2017
BISOTISSUEDXBR INC09/22/2017
BISOTISSUEDXBR INC09/22/2017
BISEQISSUEDAAA WINDOWS & DOORS CORP04/21/2017
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/18/2017
BISOTISSUEDXBR INC09/23/2016
BISOTISSUEDXBR INC09/23/2016
BISSPISSUEDSIRINA FIRE PROT CORP09/12/2016
BISPLISSUEDLOUIS L.BUTTERMARK & SONS07/21/2016
BISSPISSUEDCASE PLUMBING LLC04/20/2016
BISMHISSUEDACS SYSTEM ASSOCIATES INC.03/08/2016
BISOTISSUEDXBR INC09/22/2015
BISOTISSUEDXBR INC09/22/2015
BISSPISSUEDSIRINA FIRE PROT CORP07/28/2015
BISPLISSUEDLOUIS L.BUTTERMARK & SONS06/26/2015
BISMHISSUEDACS SYSTEM ASSOCIATES INC.06/26/2015
BISOTISSUEDXBR INC06/23/2015
BISOTISSUEDXBR INC06/23/2015
BISPLISSUEDTHE PLBG & HTG SPECIALIST03/05/2015
BISPLISSUEDPAR PLUMBING CO., INC12/15/2014
BISMHISSUEDPLANET MECHANICAL CORP01/10/2014
BISOTISSUEDCONSTRUCTOMICS LLC10/04/2013
BISOTISSUEDCONSTRUCTOMICS LLC10/04/2013
+ 21 more permits on file
4 projects · most recent 12/14/2023
General Wiring
FiledStatusContractorScope
12/14/2023Permit IssuedROBERT CHIMENTI3 meters, 1 new_meters
11/14/2022Permit IssuedLIT MODE ELECL CONTG INC—
04/08/2022Permit IssuedAMIN ELECTRICAL CORP—
02/19/2021CompleteE-J ELEC. INSTALLATION COGeneral Wiring
1 project · most recent 01/13/2023
Sidewalk Shed
FiledStatusContractorScope
01/13/2023Permit IssuedJ & N CONSTRUCTION GROUPSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/21/2022Post-installed AnchorsJOEL PHAGOOspecial
04/04/2022Post-installed AnchorsJOEL PHAGOOspecial
04/01/2022FinalPaul Millmanprogress
04/01/2022Insulation placement and R valuesPaul Millmanenergy_progress
▾Documents — 297 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/02/2026M00711983-I1Request digital key ↗
09/02/2026M00711995-I1Request digital key ↗
09/02/2026M00710891-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits78
▸BISWORK PERMIT APPLICATION47
11/04/2022140627506Open ↗
06/09/2021140627506Open ↗
06/15/2020140627506Open ↗
Showing 3 of 47 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION30
08/25/2017122156326Open ↗
05/31/2017122156326Open ↗
04/19/2017140627506Open ↗
Showing 3 of 30 on file for this type
▸BISPLACE OF ASSEMBLY1
02/19/2015122271852Open ↗
▸Seals & Professional Certifications51
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
01/17/2019123014656Open ↗
10/17/2017123014656Open ↗
09/26/2017122156326Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026M00711983-I1Open ↗
09/01/2026M08043717-I1Open ↗
09/01/2026M08040598-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026M08043717-I1Open ↗
08/24/2026M00711983-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M00710891-I1Open ↗
09/01/2026M00710891-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/19/2017140627506Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/19/2017140627506Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/19/2017140627506Open ↗
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
08/25/2017122156326Open ↗
05/31/2017122156326Open ↗
02/10/2017123014656Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
05/09/2017122156326Open ↗
05/09/2017122156326Open ↗
05/09/2017122156326Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS5
05/09/2017122156326Open ↗
01/21/2015121375207Open ↗
05/27/2014121375207Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
01/09/2015121375207Open ↗
11/21/2013121150182Open ↗
11/21/2013121375207Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
07/28/2017122903821Open ↗
01/11/2016121375564Open ↗
▸BISSCHEDULE B - PLUMBING1
09/13/2012121375207Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
04/19/2017140627506Open ↗
▸Environmental & Asbestos17
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
07/13/2017123014656Open ↗
07/05/2017123014656Open ↗
05/08/2015122156326Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00710891-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00788664-I1Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
01/17/2019123014656Open ↗
11/03/2017122156326Open ↗
10/17/2017123014656Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections3
01/21/2015121375207Open ↗
01/26/2012120929068Open ↗
01/24/2012120929068Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
01/17/2019123014656Open ↗
09/26/2017122156326Open ↗
01/21/2015121375207Open ↗
▸BISTECHNICAL REPORT: ENERGY2
01/19/2012120867927Open ↗
Showing 1 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/19/2017140627506Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00710891-I1Open ↗
▸Inspections & Test Reports2
▸BISHYDRAULIC FLOW CALCULATIONS1
01/13/2015122156326Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/19/2017140627506Open ↗
▸Approvals, Objections & Sign-offs38
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
01/17/2019123014656Open ↗
11/03/2017122156326Open ↗
09/26/2017122156326Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
09/13/2012121375207Open ↗
09/13/2012121375564Open ↗
08/30/2012121357370Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
09/02/2026M00711983-I1Open ↗
08/13/2026M08043717-I1Open ↗
08/13/2026M08040598-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/27/2018140627506Open ↗
01/13/2015122156326Open ↗
03/16/2012120867927Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER4
11/04/2022140627506Open ↗
06/09/2021140627506Open ↗
06/15/2020140627506Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00788664-I1Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT22
01/17/2019123014656Open ↗
09/26/2017122156326Open ↗
07/28/2017122903821Open ↗
Showing 3 of 22 on file for this type
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET18
02/10/2017123014656Open ↗
12/07/2016122903821Open ↗
10/08/2014122156326Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION6
06/29/2017122156326Open ↗
04/28/2017122156326Open ↗
08/19/2016122156326Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
01/17/2019123014656Open ↗
11/03/2017122156326Open ↗
11/03/2017122156326Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/19/2017140627506Open ↗
01/03/2012120929987Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
02/10/2017123014656Open ↗
12/07/2016122903821Open ↗
02/19/2015122271852Open ↗
Showing 3 of 6 on file for this type
▸BISSafety Monitoring Plan (SMP)1
01/10/2012120867927Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01012572-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01012572-I1Open ↗