← Back
Elevator apt, semi-fireproof with stores
The Hartby
75 LEWIS AVENUE · BIN 3379533
💬 Discuss this project
2021Year Built
8Stories
D7Building Class
R6BZoning
175,042 sfGross Floor Area
206Units
LL97 CoveredRent Stabilized15 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: ROMAN CATHOLIC CHURCH · 40,050 sf lot · 4.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof2p · 2 filings · 6 docs
Floor 71p · 1 filing · 20 docs
Floor 62p · 2 filings · 20 docs
Floor 5
Floor 4
Floor 31p · 1 filing · 3 docs
Floor 23p · 3 filings · 20 docs
Floor 12p · 2 filings · 7 docs
Cellar1p · 1 filing · 20 docs
Basement1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK LADDER & SCAFFOLD707/08/2026
PRC MANAGEMENT6007/08/2026
UPTOWN CONSTRUCTION GROUP1307/08/2026
PLATINUM SERVICES NY3307/08/2026
75 LEWIS AVENUE4504/09/2026
ROMAN CATHOLIC CHURCH303/22/2026
A A D CONSTRUCTION2503/22/2026
STATE CONTRACTING CORP NY703/22/2026
STATE CONSTRACTING CORP N103/22/2026
LAD CONSTRUCTION CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BETRO DESIGN GROUP403/21/2026
PLATINUM SERVICES NY2003/21/2026
OUTSOURCE CONSULTANTS, INC.3203/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor2207/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor1607/08/2026
AURA PLUMBING INCPlumbing1407/08/2026
STATE CONTRACTING CORP NYGeneral Contractor707/08/2026
UPTOWN CONSTRUCTION GROUPGeneral Contractor407/08/2026
NEW YORK LADDER & SCAFFOLDGeneral Contractor307/08/2026
AURA PLUMBINGGeneral Contractor203/22/2026
PANDELI GJINIElectrical103/21/2026
KJK ELECTRIC INC 003451General Contractor103/22/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.2541508/21/2025
EP INSPECTIONS AND COMMIS7079107/30/2025
M. HAMDI GUNAL, PE, P.C.3000111/10/2021
Building Lifecycle
All (209)Filed (33)Permit Issued (45)Signed Off (14)Violation (60)Inspection (12)Objection (12)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
09/05/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
C
08/18/2026
Violation issued (HPD, open)
C
06/16/2026
Signed off — Alteration
B00267393-I1
05/15/2026
Signed off — Alteration
PROPOSED INSTALLATION OF A PERGOLA STRUCTURE, FENCING, PAVERS OVER EXISTING ROOF, AND OUTDOOR BARBEQUE IN CONJUNCTION WITH ACCESSORY ROOFTOP AMENITY SPACE AT THE 7TH FLOOR AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01257710-I1
04/30/2026
Violation issued (HPD, closed)
C
04/10/2026
Signed off — Alteration
Installation of new auto-operated driveway gate and fence facing Hart street as per plans filed. No change in use, egress or occupancy.
B01217276-I1
04/01/2026
Signed off — Alteration
Tenant Protection Plan filed in conjunction with Alt1# 321595190.
B01082990-I1
03/25/2026
Permit issued — General Construction
B01082990-I1-GC
03/17/2026
Signed off — Alteration
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002.
B01085884-I1
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, open)
C
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
B
03/06/2026
Permit issued — General Construction
B01217276-I1-GC
02/20/2026
Violation issued (HPD, closed)
B
02/20/2026
Violation issued (HPD, closed)
C
02/20/2026
Violation issued (HPD, closed)
B
01/31/2026
Violation issued (HPD, open)
C
01/31/2026
Violation issued (HPD, open)
B
01/31/2026
Violation issued (HPD, open)
C
01/31/2026
Violation issued (HPD, open)
B
01/22/2026
Violation issued (HPD, open)
C
01/22/2026
Violation issued (HPD, closed)
A
01/08/2026
Violation issued (HPD, open)
B
01/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
MAURICIO ANDRADE
01/05/2026
Special inspection requirement — Final
MAURICIO ANDRADE
12/24/2025
Filed — Alteration
Installation of new auto-operated driveway gate and fence facing Hart street as per plans filed. No change in use, egress or occupancy.
B01217276-P1
12/02/2025
Special inspection requirement — Shutoff dampers
MAURICIO ANDRADE
12/02/2025
Special inspection requirement — HVAC and service water heating system controls
MAURICIO ANDRADE
12/02/2025
Special inspection requirement — HVAC and service water heating equipment
MAURICIO ANDRADE
12/02/2025
Special inspection requirement — Final
MAURICIO ANDRADE
12/02/2025
Special inspection requirement — HVAC insulation and sealing
MAURICIO ANDRADE
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
12/02/2025
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
12/02/2025
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
12/02/2025
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
11/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/24/2025
Special inspection requirement — Final
11/05/2025
Permit issued — General Construction
B01257710-I1-GC
09/03/2025
Signed off — Alteration
B00259046-I1
09/02/2025
Signed off — Alteration
HEREWITH FILING COMBINED SPRINKLER & STANDPIPE SYSTEM IN CONJUNCTION WITH ALT-1 FILING (#321595190).
B00259032-I1
08/26/2025
Signed off — Alteration
HEREWITH FILING CURB CUT IN CONJUNCTION WITH BUILDER'S PAVEMENT PLAN APPLICATION 340702635.
B00420022-I1
08/22/2025
Objection resolved — Addressed
08/21/2025
Filed — Alteration
B00267393-P2
08/18/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/12/2025
Objection raised — Scope
08/12/2025
Objection raised — Cost
08/12/2025
Objection resolved — Addressed
07/30/2025
Filed — Alteration
PROPOSED INSTALLATION OF A PERGOLA STRUCTURE, FENCING, PAVERS OVER EXISTING ROOF, AND OUTDOOR BARBEQUE IN CONJUNCTION WITH ACCESSORY ROOFTOP AMENITY SPACE AT THE 7TH FLOOR AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01257710-I1
07/23/2025
Signed off — Alteration
B00265413-I1
07/23/2025
Special inspection requirement — Final
MAURICIO ANDRADE
07/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
07/23/2025
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
07/23/2025
Special inspection requirement — HVAC and service water heating system controls
MAURICIO ANDRADE
07/23/2025
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
Latest 60 of 209 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP03/25/2026
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP03/06/2026
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP11/05/2025
DOB NOWStandpipeSigned-offAURA PLUMBING INC03/13/2025
DOB NOWCurb CutSigned-offA.A.D. CONSTRUCTION CORP09/24/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. CONSTRUCTION CORP09/18/2024
DOB NOWConstruction FenceSigned-offA.A.D. CONSTRUCTION CORP08/06/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/03/2024
DOB NOWPlumbingSigned-offAURA PLUMBING INC05/28/2024
DOB NOWStandpipeSigned-offAURA PLUMBING INC04/12/2024
DOB NOWStandpipeSigned-offAURA PLUMBING INC04/12/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC04/02/2024
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP03/01/2024
DOB NOWConstruction FenceSigned-offA.A.D. CONSTRUCTION CORP08/04/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC06/14/2023
DOB NOWSprinklersSigned-offAURA PLUMBING INC05/12/2023
DOB NOWSprinklersSigned-offAURA PLUMBING INC05/12/2023
DOB NOWPlumbingSigned-offAURA PLUMBING INC05/02/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC04/05/2023
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP02/28/2023
DOB NOWConstruction FenceSigned-offA.A.D. CONSTRUCTION CORP08/12/2022
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP07/18/2022
DOB NOWSprinklersSigned-offAURA PLUMBING INC05/11/2022
DOB NOWStandpipeSigned-offAURA PLUMBING INC05/11/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/08/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/07/2022
DOB NOWPlumbingSigned-offAURA PLUMBING INC04/02/2022
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP11/16/2021
DOB NOWConstruction FenceSigned-offA.A.D. CONSTRUCTION CORP08/11/2021
DOB NOWStructuralSigned-offA.A.D. CONSTRUCTION CORP08/09/2021
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP07/20/2021
DOB NOWSprinklersSigned-offAURA PLUMBING INC05/27/2021
DOB NOWStandpipeSigned-offAURA PLUMBING INC05/26/2021
DOB NOWPlumbingSigned-offAURA PLUMBING INC05/26/2021
DOB NOWPlumbingSigned-offAURA PLUMBING INC05/12/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/13/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC04/13/2021
DOB NOWConstruction FenceSigned-offA.A.D. CONSTRUCTION CORP03/29/2021
DOB NOWSupported ScaffoldSigned-offSTATE CONTRACTING CORP NY12/21/2020
DOB NOWSupported ScaffoldSigned-offSTATE CONTRACTING CORP NY11/02/2020
+ 30 more permits on file
5 projects · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
09/29/2025CompleteTECHNO-VOLT ELEC, INC—
06/27/2025CompleteKJK ELECTRIC INC—
07/19/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
02/21/2020CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/18/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/16/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/16/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/21/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
10/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/03/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/09/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/09/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/27/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
01/05/2026Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
01/05/2026FinalMAURICIO ANDRADEprogress
12/02/2025Shutoff dampersMAURICIO ANDRADEenergy_progress
12/02/2025HVAC and service water heating system controls MAURICIO ANDRADEenergy_progress
12/02/2025HVAC and service water heating equipment MAURICIO ANDRADEenergy_progress
12/02/2025FinalMAURICIO ANDRADEprogress
12/02/2025HVAC insulation and sealing MAURICIO ANDRADEenergy_progress
12/02/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
12/02/2025Maintenance informationMAURICIO ANDRADEenergy_progress
12/02/2025Mechanical SystemsMAURICIO ANDRADEspecial
12/02/2025Heating SystemsMAURICIO ANDRADEspecial
11/27/2025Tenant Protection Plan Compliance—special
11/24/2025Final—progress
07/23/2025FinalMAURICIO ANDRADEprogress
07/23/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
07/23/2025Heating SystemsMAURICIO ANDRADEspecial
07/23/2025HVAC and service water heating system controls MAURICIO ANDRADEenergy_progress
07/23/2025Maintenance informationMAURICIO ANDRADEenergy_progress
07/23/2025Shutoff dampersMAURICIO ANDRADEenergy_progress
07/23/2025HVAC and service water heating equipment MAURICIO ANDRADEenergy_progress
07/23/2025HVAC insulation and sealing MAURICIO ANDRADEenergy_progress
07/23/2025Mechanical SystemsMAURICIO ANDRADEspecial
07/17/2025FinalMOLLY GLENNprogress
07/17/2025Energy Code Compliance InspectionsMOLLY GLENNprogress
07/17/2025Lighting controlsMOLLY GLENNenergy_progress
Latest 25 of 58.
▾Documents — 397 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch17
08/31/2026B00501363-P3Request digital key ↗
08/31/2026B00501363-P1Request digital key ↗
08/31/2026B00501363-P2Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/01/2026B00265413-P6Request digital key ↗
09/01/2026B00265413-P7Request digital key ↗
09/01/2026B00265413-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/24/2026B00259032-I1Request digital key ↗
08/24/2026B00259032-P2Request digital key ↗
08/15/2026B00259032-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/24/2026B00259032-P1Request digital key ↗
08/24/2026B00259032-I1Request digital key ↗
08/24/2026B00259032-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00267393-I1Request digital key ↗
08/15/2026B00267393-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026B00420022-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00259046-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00407191-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00318660-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/01/2026B00254205-I1Request digital key ↗
▸Applications & Permits66
▸BISPLAN / WORK APPROVAL APPLICATION51
12/22/2025300534795Open ↗
08/07/2025340702635Open ↗
07/30/2025321112327Open ↗
Showing 3 of 51 on file for this type
▸BISWORK PERMIT APPLICATION12
07/08/2025340917538Open ↗
05/07/2022321595190Open ↗
05/13/2021321595190Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
08/26/2025340702635Open ↗
Showing 1 of 2 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
12/21/2020340775281Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
03/04/2025321595190Open ↗
12/04/2020321595190Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications80
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/02/2026B00407191-I1Open ↗
09/02/2026B00420022-I1Open ↗
08/31/2026B00501363-P1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/18/2026B00259032-P1Open ↗
09/12/2026B00259032-I1Open ↗
09/12/2026B00259032-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B01257710-I1Open ↗
08/31/2026B01257710-I1Open ↗
08/25/2026B01082990-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
05/04/2021321595190Open ↗
05/04/2021321595190Open ↗
05/04/2021321595190Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/14/2025340917538Open ↗
12/18/2020340775281Open ↗
12/11/2020340794689Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/18/2020340775281Open ↗
12/11/2020340794689Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/18/2020340775281Open ↗
12/11/2020340794689Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
05/14/2025340917538Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment1
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/09/2025321595190Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
08/27/2021321595190Open ↗
Showing 1 of 2 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
10/15/2020340702635Open ↗
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026B00254205-I1Open ↗
08/13/2026B00267393-I1Open ↗
08/13/2026B00265413-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
08/27/2021321595190Open ↗
05/04/2021321595190Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/18/2020340775281Open ↗
▸BISASBESTOS ABATEMENT COMPLIANCE1
05/22/2025340917538Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/31/2026B00615197-I1Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
05/14/2025340917538Open ↗
07/08/2021321595190Open ↗
07/08/2021321595190Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/04/2021321595190Open ↗
05/04/2021321595190Open ↗
Showing 2 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
03/04/2026340917538Open ↗
01/09/2025321595190Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
05/14/2025340917538Open ↗
12/18/2020340775281Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
04/01/2021322005245Open ↗
04/01/2021340775281Open ↗
▸BISFENESTRATION AIR LEAKAGE2
07/08/2025340917538Open ↗
01/09/2025321595190Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00267393-I1Open ↗
09/02/2026B00267393-I1Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/09/2025321595190Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/09/2025321595190Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/24/2026340917538Open ↗
▸BISLIGHTING CONTROLS1
01/09/2025321595190Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/09/2025321595190Open ↗
▸BISELECTRIC MOTORS1
01/09/2025321595190Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/02/2026B00267393-I1Open ↗
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: RESPONSIBILITY19
07/08/2025340917538Open ↗
05/14/2025340917538Open ↗
08/30/2021321595190Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
03/19/2025321595190Open ↗
03/19/2025321595190Open ↗
08/30/2021321595190Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
03/25/2025321595190Open ↗
08/30/2021321595190Open ↗
05/04/2021321595190Open ↗
▸DOB NOWHydrant Flow Test Letter3
08/24/2026B00259032-P1Open ↗
08/24/2026B00259032-I1Open ↗
08/24/2026B00259032-P2Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
02/24/2026340917538Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/24/2026340917538Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
10/20/2023321595190Open ↗
▸Approvals, Objections & Sign-offs31
▸BISSCHEDULE A - OCCUPANCY / USE17
05/19/2025321595190Open ↗
05/02/2025321595190Open ↗
04/14/2025321595190Open ↗
Showing 3 of 17 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
04/01/2021340794689Open ↗
04/01/2021322005245Open ↗
04/01/2021340775281Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/14/2021340702635Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL1
02/24/2026340917538Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/02/2026B00407191-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT8
04/01/2021322005245Open ↗
04/01/2021340775281Open ↗
12/18/2020340775281Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
05/04/2021321595190Open ↗
12/21/2020340775281Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms38
▸BISADDITIONAL INFORMATION20
12/22/2025300534795Open ↗
08/26/2025340702635Open ↗
06/30/2025321595190Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET14
10/08/2020321595190Open ↗
Showing 1 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
05/14/2025340917538Open ↗
12/18/2020340775281Open ↗
12/11/2020340794689Open ↗
Showing 3 of 4 on file for this type
▸Other Documents26
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION13
12/22/2025300534795Open ↗
08/27/2021321595190Open ↗
08/27/2021321595190Open ↗
Showing 3 of 13 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
12/18/2020340702635Open ↗
12/18/2020340702635Open ↗
10/15/2020340702635Open ↗
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWHydraulic Calculations3
08/13/2026B00259032-P2Open ↗
08/13/2026B00259032-P1Open ↗
08/13/2026B00259032-I1Open ↗
▸BISMAINTENANCE INFORMATION1
01/09/2025321595190Open ↗
▸BISBPP-DEP: INSTALL/RELOCATE FIRE HYDRANT1
10/15/2020340702635Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/18/2020340775281Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/09/2025321595190Open ↗