| Owner | Filings | Most Recent |
|---|---|---|
| HEIGHTS 75 OWNER'S CORP | 247 | 03/22/2026 |
| 75 Livingston Street | 10 | 09/13/2026 |
| TUDOR REALTY SERVICES | 9 | 03/21/2026 |
| FirstService Residential | 7 | 07/08/2026 |
| CANIDO BASONAS CONSTRUCTION | 6 | 03/21/2026 |
| FIRST SERVICE RESIDENTIAL | 5 | 07/08/2026 |
| C O THURCON PROPERTIES | 5 | 03/21/2026 |
| HEIGHTS 750 OWNERS | 2 | 03/21/2026 |
| HEIGHTS OWNERS | 2 | 03/21/2026 |
| THURCON PROPERTIES | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| THE ROCK BROOK CONSULTING GROUP, PA | 3 | 06/09/2026 |
| BO LEE ARCHITECT PC | 2 | 06/09/2026 |
| CHRISTOPHER TEETER | 2 | 05/21/2026 |
| LEON SKVIRSKY PE | 7 | 01/20/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 12/16/2025 |
| FL&M ENGINEERING DESIGN &INSPECTION | 2 | 10/21/2025 |
| ANTHONY J. VARANO, PE | 1 | 09/09/2025 |
| LONGO ARCHITECTS & ASSOCIATES, LLC | 1 | 09/05/2025 |
| HOWARD L ZIMMERMAN ARCH & ENG DPC | 5 | 06/05/2025 |
| GRADE ARCHITECTURE + INTERIOR DESIG | 2 | 05/08/2025 |
| BITOPI CONSULTANTS LLC | 1 | 04/23/2025 |
| EPONYMOUS ARCHITECTURE | 2 | 04/09/2025 |
| CES ENGINEERING LLC | 1 | 04/01/2025 |
| WJY ELECTRIC INC. | 2 | 02/11/2025 |
| ALLRED & MARTINSON ARCHITECTS PLLC | 2 | 12/23/2024 |
| ASHRAF CORP | 3 | 12/22/2024 |
| ARC CONSULTING ENGINEERS | 3 | 11/12/2024 |
| JACK GREEN ASSOCIATES | 2 | 07/01/2024 |
| FABIAN BEDOLLA ARCHITECT | 3 | 05/22/2024 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 3 | 02/13/2024 |
| DEVOTE ARCH & DESIGN STUDIO, PLLC | 1 | 01/25/2024 |
| NONE | 2 | 04/14/2023 |
| TSF ENGINEERING, PC | 2 | 02/10/2023 |
| BMG DESIGN BUILD LLC | 1 | 01/04/2023 |
| FRONT STUDIO LLC | 2 | 12/10/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 4 | 03/21/2026 |
| P WOLFE CONSULTANTS | 4 | 03/21/2026 |
| HLZAE | 3 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 6 | 03/21/2026 |
| Rigid Structural Design, LLC | 2 | 03/21/2026 |
| CORNERSTONE CONSULTING | 1 | 03/21/2026 |
| BOHLER ENGINEERING | 4 | 03/21/2026 |
| JRK CREATIVE | 10 | 03/21/2026 |
| LOUIS STRIAR | 8 | 03/21/2026 |
| MA DESIGNS NYC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| INTERSYSTEM INSTALLATION | General Contractor | 8 | 07/08/2026 |
| CANIDO BASONAS CONST SVC | General Contractor | 8 | 07/08/2026 |
| PM MECHANICAL GROUP CORP | General Contractor | 6 | 07/08/2026 |
| VERICON CONSTRUCTION CO | General Contractor | 6 | 04/09/2026 |
| CANIDO BASONAS CONSTRUCTI | General Contractor | 5 | 07/08/2026 |
| CAPITOL DESIGN MAINT IN | Scaffold | 4 | 07/08/2026 |
| KENKO INTERIORS INC | General Contractor | 4 | 03/21/2026 |
| WILMAN CUSTOM DESIGN.LLC | General Contractor | 4 | 03/21/2026 |
| MY TRADE CABINET CO INC | General Contractor | 3 | 03/21/2026 |
| PROCORE MECHANICAL CORP | Plumbing | 3 | 07/08/2026 |
| INVENTIVE CONTRACTING INC | General Contractor | 3 | 03/21/2026 |
| ARCO GROUP USA INC | General Contractor | 3 | 03/21/2026 |
| GOING SIGN SVCNG | Scaffold | 2 | 07/08/2026 |
| ALL STANDARD CONSTRUCTION | General Contractor | 2 | 04/09/2026 |
| PALCO MECHANICAL LLC | General Contractor | 2 | 07/08/2026 |
| ZAIM CONTRACTOR CORP | General Contractor | 2 | 03/21/2026 |
| R.J.C. MECHANICAL CORP | Plumbing | 2 | 07/08/2026 |
| TRI CITY MECHANICAL GROUP CORP | Plumbing | 2 | 07/08/2026 |
| ABDELRAZEK MOHAMED | General Contractor | 1 | 03/21/2026 |
| ALLIANCE ELEVATOR COMPANY | Electrical | 1 | 03/22/2026 |
| 2M MECHANICAL | General Contractor | 1 | 03/21/2026 |
| URBAN CONSTR & DESIGN LLC | General Contractor | 1 | 07/08/2026 |
| 212 RENOVATIONS GROUP LLC | General Contractor | 1 | 06/27/2026 |
| 123 MANAGEMENT INC | General Contractor | 1 | 07/08/2026 |
| WAWEL PLBG AND HTG CORP | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| WELLDONE INSPECTION INC. | 8628 | 2 | 06/09/2026 |
| SAG ENGINEERING & CONSULT | 608 | 4 | 06/09/2026 |
| HOWARD L ZIMMERMAN ARCHIT | 1712 | 5 | 06/05/2025 |
| BITOPI CONSULTANTS LLC | 7036 | 1 | 04/23/2025 |
| NEW AGE ENGINEERING PLLC | 7746 | 1 | 04/09/2025 |
| SD TESTING & INSPECTION S | 7010 | 2 | 02/11/2025 |
| AMALGAM DESIGN | 6478 | 2 | 12/23/2024 |
| JAY KAVI CORPORATION | 8500 | 1 | 12/22/2024 |
| ARC CONSULTING ENGINEERS, | 4083 | 3 | 11/12/2024 |
| PROJECT TACTICAL SOLUTION | 5859 | 1 | 02/26/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Signed-off | JOHN FITZGERALD PLBG &HTG | 05/22/2026 |
| DOB NOW | Plumbing | Permit Issued | RRP PLUMBING CORP | 01/29/2026 |
| DOB NOW | Sign | Signed-off | CAPITOL DESIGN & MAINT IN | 01/27/2026 |
| DOB NOW | Sign | Signed-off | CAPITOL DESIGN & MAINT IN | 01/27/2026 |
| DOB NOW | Sign | Signed-off | CAPITOL DESIGN & MAINT IN | 01/27/2026 |
| DOB NOW | Sign | Signed-off | CAPITOL DESIGN & MAINT IN | 01/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | VERICON CONSTRUCTION CO | 01/06/2026 |
| DOB NOW | Structural | Permit Issued | VERICON CONSTRUCTION CO | 01/06/2026 |
| DOB NOW | General Construction | Signed-off | VERICON CONSTRUCTION CO | 01/05/2026 |
| DOB NOW | Plumbing | Permit Issued | CATMAN PLUMBING INC | 10/30/2025 |
| DOB NOW | General Construction | Signed-off | VERICON CONSTRUCTION CO | 10/28/2025 |
| DOB NOW | General Construction | Permit Issued | ALL STANDARD CONSTRUCTION | 10/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | ALL STANDARD CONSTRUCTION | 10/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | VERICON CONSTRUCTION CO | 10/23/2025 |
| DOB NOW | Structural | Signed-off | VERICON CONSTRUCTION CO | 10/01/2025 |
| DOB NOW | Plumbing | Signed-off | AARON PLBG AND MECH SYST | 09/25/2025 |
| DOB NOW | Construction Fence | Signed-off | MC SUPERSTRUCTURE INC | 08/27/2025 |
| DOB NOW | Plumbing | Permit Issued | WAWEL PLBG AND HTG CORP | 08/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PALCO MECHANICAL LLC | 07/31/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | STRUCTUAL PRESV SYSTEM | 07/02/2025 |
| DOB NOW | General Construction | Signed-off | 212 RENOVATIONS GROUP LLC | 05/28/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | STRUCTUAL PRESV SYSTEM | 05/27/2025 |
| DOB NOW | General Construction | Signed-off | INVENTIVE CONTRACTING INC | 05/21/2025 |
| DOB NOW | Plumbing | Signed-off | SUPERIOR PLUMBING & HEATI | 05/21/2025 |
| DOB NOW | Plumbing | Signed-off | FLAVIO MECHANICAL CORP | 04/07/2025 |
| DOB NOW | General Construction | Permit Issued | URBAN CONSTR & DESIGN LLC | 01/08/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PALCO MECHANICAL LLC | 12/12/2024 |
| DOB NOW | General Construction | Signed-off | PM MECHANICAL GROUP CORP | 10/01/2024 |
| DOB NOW | General Construction | Signed-off | PM MECHANICAL GROUP CORP | 06/26/2024 |
| DOB NOW | Mechanical Systems | Signed-off | WILMAN CUSTOM DESIGN.LLC | 06/14/2024 |
| DOB NOW | Supported Scaffold | Permit Issued | CANIDO BASONAS CONST SVC | 05/22/2024 |
| DOB NOW | General Construction | Signed-off | WILMAN CUSTOM DESIGN.LLC | 04/29/2024 |
| DOB NOW | General Construction | Permit Issued | SUFFOLK CONSTRUCT CO. INC | 04/11/2024 |
| DOB NOW | Plumbing | Signed-off | SYSTEMS 2000 PLBG SVCS LL | 12/05/2023 |
| DOB NOW | General Construction | Signed-off | CANIDO BASONAS CONST SVC | 11/30/2023 |
| DOB NOW | Supported Scaffold | Permit Issued | CANIDO BASONAS CONSTRUCTI | 10/26/2023 |
| DOB NOW | Plumbing | Signed-off | FLAVIO MECHANICAL CORP | 09/27/2023 |
| DOB NOW | General Construction | Signed-off | PM MECHANICAL GROUP CORP | 09/27/2023 |
| DOB NOW | Mechanical Systems | Signed-off | PM MECHANICAL GROUP CORP | 09/27/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | INTERSYSTEMS INSTAL S&S | 09/25/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/09/2026 | — | — | Others | Other N/A NA 1 BTU · Ductwork ×1 |
| 06/09/2026 | Permit Issued | VERICON CONSTRUCTION CO | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Heating Enviro-Tec Enviro-Tec SDR-EH 3 kW · Vav Box ×2 Marley Marley QFF 2 kW · Electric Heater ×2 |
| 02/10/2023 | — | — | Ventilation Systems | Ventilation Greenheck CSP-XXX-VG 225 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/09/2026 | — | — | Gas, Water/Sanitary |
| 06/09/2026 | Signed-off | AARON PLBG AND MECH SYST | Water/Sanitary |
| 05/21/2026 | — | — | Gas, Water/Sanitary |
| 05/08/2025 | Permit Issued | WAWEL PLBG AND HTG CORP | Gas, Water/Sanitary |
| 04/23/2025 | Signed-off | JOHN FITZGERALD PLBG &HTG | Water/Sanitary |
| 04/09/2025 | Signed-off | SUPERIOR PLUMBING & HEATI | Gas, Water/Sanitary |
| 12/23/2024 | Permit Issued | RRP PLUMBING CORP | Water/Sanitary |
| 07/01/2024 | Signed-off | SYSTEMS 2000 PLBG SVCS LL | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/20/2026 | Permit Issued | SRM ELECTRICAL SVC INC | General Wiring, Lighting |
| 01/07/2026 | Permit Issued | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 10/08/2025 | Permit Issued | ALLIANCE ELEVATOR COMPANY | — |
| 10/02/2025 | Permit Issued | SRM ELECTRICAL SVC INC | — |
| 08/08/2025 | Permit Issued | KJK ELECTRIC INC | General Wiring |
| 07/28/2025 | Complete | LAURA ELEC'L LIGHTING & | — |
| 06/03/2025 | Complete | ATMOS ELECTRIC SVCE CORP | General Wiring |
| 03/19/2025 | Complete | THE METRO GROUP ELECTRIC | General Wiring |
| 01/17/2025 | Permit Issued | SOLEIRE ELECL SOLTNS CORP | General Wiring |
| 06/11/2024 | Complete | FALCO ELEC'L SERVICES INC | General Wiring |
| 10/25/2023 | Permit Issued | LIMITLESS ELECT RESOURCES | General Wiring |
| 07/15/2022 | Complete | AE ELECTRIC INC | General Wiring |
| 03/15/2022 | Complete | BASS ELECTRICAL CORP. | General Wiring |
| 03/07/2022 | Complete | CREGGAN ELECTRIAL CORP | General Wiring |
| 12/18/2020 | Complete | MLS ELECTRIC LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/09/2026 | Permit Issued | VERICON CONSTRUCTION CO | Steel |
| 12/16/2025 | — | — | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/14/2023 | Permit Issued | CANIDO BASONAS CONST SVC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/09/2026 | Permit Issued | VERICON CONSTRUCTION CO | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/22/2025 | Signed-off | STRUCTUAL PRESV SYSTEM | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/28/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 06/22/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/16/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/04/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/16/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/20/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/10/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/07/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/23/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 09/19/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/12/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/02/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/31/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 07/22/2024 | Certified Storm Drainage-ST-Piping-Water Test | Certified | View ↗ |
| 07/18/2024 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 04/24/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 02/16/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/10/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/10/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/09/2023 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 06/24/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/25/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/02/2026 | Mechanical Systems | Chester Kowalski | special |
| 07/02/2026 | Final | Chester Kowalski | progress |
| 07/02/2026 | Duct leakage testing, insulation and design | Chester Kowalski | energy_progress |
| 07/02/2026 | HVAC-R and service water heating equipment | Chester Kowalski | energy_progress |
| 07/02/2026 | HVAC-R and service water heating system controls | Chester Kowalski | energy_progress |
| 07/02/2026 | HVAC-R and service water piping design and insulation | Chester Kowalski | energy_progress |
| 07/02/2026 | Fire-Resistant Penetrations and Joints | Chester Kowalski | special |
| 05/22/2026 | Duct leakage testing, insulation and design | Chester Kowalski | energy_progress |
| 05/22/2026 | Fire-Resistant Penetrations and Joints | Chester Kowalski | special |
| 05/22/2026 | Mechanical Systems | Chester Kowalski | special |
| 05/22/2026 | Final | Chester Kowalski | progress |
| 05/22/2026 | HVAC-R and service water piping design and insulation | Chester Kowalski | energy_progress |
| 05/22/2026 | HVAC-R and service water heating system controls | Chester Kowalski | energy_progress |
| 05/22/2026 | HVAC-R and service water heating equipment | Chester Kowalski | energy_progress |
| 02/24/2026 | Fire-Resistant Penetrations and Joints | QIUFAN JIANG | special |
| 02/24/2026 | Energy Code Compliance Inspections | BO LEE | progress |
| 02/24/2026 | HVAC-R and service water piping design and insulation | BO LEE | energy_progress |
| 01/20/2026 | Final | LEON SKVIRSKY | progress |
| 01/20/2026 | Final | LEON SKVIRSKY | progress |
| 01/20/2026 | Final | LEON SKVIRSKY | progress |
| 01/14/2026 | Lighting in dwelling units | — | energy_progress |
| 01/14/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 01/14/2026 | Lighting controls | — | energy_progress |
| 01/14/2026 | Interior lighting power | — | energy_progress |
| 01/14/2026 | Final | — | progress |