← Back
Factory, industrial, miscellaneous
75 ONDERDONK AVENUE
QUEENS · BIN 4454479
💬 Discuss this project
1950Year Built
2Stories
F9Building Class
M3-1Zoning
42,592 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Factory, industrial, miscellaneous · Owner of record: 75 ONDERDONK AVE LLC · 63,554 sf lot · 0.67 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionGeneral
Roof2p · 1 filing · 8 docs
Floor 21p · 1 filing · 20 docs
Floor 121p · 3 filings · 20 docs
Mezzanine16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
75 ONDERDONK AVE6707/08/2026
JASON RICHARD REALTY1003/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2025$28.0M—75 ONDERDONK AVE LLC → ONDERDONK HL REALTY LLC$657/sf building
07/19/2021$24.5M—— → —$575/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP TOSCANO ARCHITECTS1407/08/2026
STEEL CORE ENGINEERING PLLC711/17/2025
SYNERGIC DESIGN ARCHITECTS103/27/2024
CX CONSULTING CORP212/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA2103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.S.Y. GROUP INCGeneral Contractor1607/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
VILLAGE P & H NY INCFire Protection107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.67811607/08/2026
D&E BUILD EVERGREEN I9342211/17/2025
SYNERGIC DESIGN LLC8561103/27/2024
Building Lifecycle
All (138)Filed (23)Permit Issued (11)Signed Off (7)Violation (23)Inspection (12)Objection (32)Special Inspection (30)
08/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
08/14/2026
Special inspection requirement — Fenestration air leakage
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/14/2026
Special inspection requirement — Masonry
CHRISTIAN LOZADA
08/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/08/2026
Filed — Alteration CO
Application filed to convert factory and accessory office use to warehouse and accessory offices. Work to include new 10'-0" wide loading berth opening. Subsequent applications filed for SP, PL, MS, GC, CC and EQ.
Q08010960-P5
06/30/2026
Special inspection requirement — Masonry
CHRISTIAN LOZADA
06/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
06/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
06/30/2026
Special inspection requirement — Fenestration air leakage
05/05/2026
Inspection — Under Review CND-Occupancy Inspection
Under Review
View inspection ↗
04/13/2026
Filed — Alteration CO
Application filed to convert factory and accessory office use to warehouse and accessory offices. Work to include new 10'-0" wide loading berth opening. Subsequent applications filed for SP, PL, MS, GC, CC and EQ.
Q08010960-P4
04/08/2026
Special inspection requirement — Fenestration air leakage
04/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/23/2026
Special inspection requirement — Masonry
CHRISTIAN LOZADA
03/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
01/20/2026
Signed off — Alteration
New VRF HVAC system for proposed showroom and office. No chenge in use, occupncy or egress
Q00778076-S6
12/16/2025
Special inspection requirement — Mechanical Systems
Danny Chen
12/16/2025
Special inspection requirement — Shutoff dampers
Danny Chen
12/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Danny Chen
12/16/2025
Special inspection requirement — Duct leakage testing, insulation and design
Danny Chen
12/16/2025
Special inspection requirement — Maintenance information
Danny Chen
12/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Danny Chen
12/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Danny Chen
12/16/2025
Special inspection requirement — Final
PETER CHO
12/16/2025
Special inspection requirement — Heating Systems
Danny Chen
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Danny Chen
12/07/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
11/29/2025
Objection raised — Fire_Protection
11/29/2025
Objection raised — Zoning
11/17/2025
Filed — Alteration
New VRF HVAC system for proposed showroom and office. No chenge in use, occupncy or egress
Q00778076-A1
10/30/2025
Permit issued — Mechanical Systems
Q00778076-S6-MS
10/17/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/16/2025
Filed — Alteration CO
Application filed to convert factory and accessory office use to warehouse and accessory offices. Work to include new 10'-0" wide loading berth opening. Subsequent applications filed for SP, PL, MS, GC, CC and EQ.
Q08010960-P3
10/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
10/15/2025
Special inspection requirement — Masonry
CHRISTIAN LOZADA
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/21/2025
Objection resolved — Addressed
04/17/2025
Objection raised — Scope
04/15/2025
Filed — Alteration CO
Application filed to convert factory and accessory office use to warehouse and accessory offices. Work to include new 10'-0" wide loading berth opening. Subsequent applications filed for SP, PL, MS, GC, CC and EQ.
Q08010960-P2
03/21/2025
Signed off — Alteration
New VRF HVAC system for proposed showroom and office. No chenge in use, occupncy or egress
Q00778076-S7
07/18/2024
Permit issued — Solar
Q00990324-I1-SL
07/03/2024
Signed off — Alteration
New VRF HVAC system for proposed showroom and office. No chenge in use, occupncy or egress
Q00778076-S5
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/01/2024
Special inspection requirement — Masonry
CHRISTIAN LOZADA
06/20/2024
Signed off — Alteration
New VRF HVAC system for proposed showroom and office. No chenge in use, occupncy or egress
Q00778076-S1
06/20/2024
Signed off — Alteration
New VRF HVAC system for proposed showroom and office. No chenge in use, occupncy or egress
Q00778076-I1
06/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2024
Signed off — Alteration
New VRF HVAC system for proposed showroom and office. No chenge in use, occupncy or egress
Q00778076-S2
06/10/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/21/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/17/2024
Violation issued (FDNY_ORDER, closed)
03/27/2024
Filed — Alteration
Installation of 558.475 kw solar energy system on roof. No change of occupancy, use or egress.
Q00990324-I1
01/16/2024
Objection resolved — Addressed
01/16/2024
Objection resolved — Addressed
01/16/2024
Objection resolved — Addressed
01/11/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offM.S.Y. GROUP INC10/30/2025
DOB NOWSolarPermit IssuedACCORD POWER INC07/18/2024
DOB NOWGeneral ConstructionPermit IssuedM.S.Y. GROUP INC12/20/2023
DOB NOWMechanical SystemsSigned-offM.S.Y. GROUP INC10/31/2023
DOB NOWGeneral ConstructionSigned-offM.S.Y. GROUP INC10/24/2023
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC10/24/2022
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC10/21/2022
DOB NOWStructuralSigned-offM.S.Y. GROUP INC10/13/2022
DOB NOWConstruction FenceSigned-offM.S.Y. GROUP INC10/13/2022
DOB NOWCurb CutSigned-offM.S.Y. GROUP INC10/04/2022
DOB NOWGeneral ConstructionSigned-offM.S.Y. GROUP INC08/17/2022
BISOTISSUEDPHILIP TOSCANO03/19/2020
BISSPISSUEDPLUMBING NYC, INC03/05/2019
BISSPISSUEDPLUMBING NYC, INC02/27/2018
BISOTISSUEDNATIONAL COMPRESSOR EXCHANGE INC12/18/2002
BISPLISSUEDCN PLUMBING INC12/17/2002
BISOTISSUEDCN PLUMBING INC12/17/2002
6 projects · most recent 11/09/2025
Lighting HVAC Wiring General Wiring
FiledStatusContractorScope
11/09/2025CompleteTECHNICAL ELECTRIC CORPLighting
11/09/2025CompleteTECHNICAL ELECTRIC CORPHVAC Wiring
10/21/2025CancelledTECHNICAL ELECTRIC CORPLighting
10/21/2025CancelledTECHNICAL ELECTRIC CORPHVAC Wiring
07/17/2024Permit IssuedPOWER SURGE ELECTRIC, INC—
05/09/2023CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 03/27/2024
FiledStatusContractorScope
03/27/2024Permit IssuedACCORD POWER INC1,255 panels, 558.47 kw, 56,971.58 roof_area_sqft
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
05/05/2026Under Review CND-Occupancy InspectionUnder ReviewView ↗
10/17/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/10/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/21/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/11/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/11/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/03/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/17/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
08/14/2026Fenestration and door U-factor and product ratings—energy_progress
08/14/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/14/2026MasonryCHRISTIAN LOZADAspecial
08/14/2026Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
08/14/2026Fenestration air leakage—energy_progress
06/30/2026Fenestration and door U-factor and product ratings—energy_progress
06/30/2026Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
06/30/2026MasonryCHRISTIAN LOZADAspecial
06/30/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/30/2026Fenestration air leakage—energy_progress
04/08/2026Fenestration and door U-factor and product ratings—energy_progress
04/08/2026Fenestration air leakage—energy_progress
03/23/2026Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
03/23/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/23/2026MasonryCHRISTIAN LOZADAspecial
12/16/2025Fire-Resistant Penetrations and JointsDanny Chenspecial
12/16/2025Mechanical SystemsDanny Chenspecial
12/16/2025Heating SystemsDanny Chenspecial
12/16/2025FinalPETER CHOprogress
12/16/2025HVAC-R and service water heating equipmentDanny Chenenergy_progress
12/16/2025Maintenance informationDanny Chenenergy_progress
12/16/2025Duct leakage testing, insulation and designDanny Chenenergy_progress
12/16/2025HVAC-R and service water heating system controlsDanny Chenenergy_progress
12/16/2025HVAC-R and service water piping design and insulationDanny Chenenergy_progress
12/16/2025Shutoff dampersDanny Chenenergy_progress
Latest 25 of 92.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/25/2026Q00795498-I1Request digital key ↗
08/25/2026Q00778076-S5Request digital key ↗
08/25/2026Q00778076-P7Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
03/23/2020421209187Open ↗
02/28/2018421209187Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/14/2017421209187Open ↗
▸Seals & Professional Certifications57
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/25/2026Q00778076-A1Open ↗
08/25/2026Q00778076-P8Open ↗
08/25/2026Q00778076-P7Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/19/2026Q00778076-I1Open ↗
09/03/2026Q00778076-P8Open ↗
09/01/2026Q00778076-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/19/2026Q00778076-I1Open ↗
09/03/2026Q00778076-P8Open ↗
09/01/2026Q00778076-P2Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/14/2020421209187Open ↗
02/08/2018421209187Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/14/2017421209187Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist6
08/17/2026Q08010960-P5Open ↗
08/13/2026Q08010960-P3Open ↗
08/13/2026Q08010960-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08010960-I1Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
08/25/2026Q00778076-P7Open ↗
08/25/2026Q00778076-P5Open ↗
08/25/2026Q00778076-P3Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/09/2017421209187Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/14/2017421209187Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/14/2017421209187Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/14/2017421209187Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification6
08/17/2026Q08010960-P4Open ↗
08/17/2026Q08010960-P3Open ↗
08/17/2026Q08010960-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00778076-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08010960-I1Open ↗