75 PARK TERRACE EAST
MANHATTAN · Inwood · BIN 1065006
💬 Discuss this project
1939Year Built
9Stories
D4Building Class
R7AZoning
87,400 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Elevator cooperative · Owner of record: PARK TERR ASSOC · 25,250 sf lot · 3.46 FAR built · Flood zone X
Locations of Work
ArchitectureEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 13 docs
Bulkhead2p · 1 filing · 10 docs
Floor 83p · 1 filing · 2 docs
Floor 7
Floor 6
Floor 5
Floor 41p · 1 filing · 6 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION1209/07/2026
RELIABLE ENTERPRISES1103/22/2026
PARK TERR ASSOC103/22/2026
D.J.M CONT CO. INC103/22/2026
KREISEL403/22/2026
DOUGLAS ELLIMAN PROPERTY MANAGEMENT103/22/2026
HKS CONSTRUCTION303/21/2026
PARK TERRACE GARDENS2103/21/2026
B H B CONSTRUCTION403/21/2026
INSIGNIA RESIDENTIAL GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FALCON GROUP203/21/2026
XINOS CONSTRUCTION203/21/2026
AGOUTI CONSTRUCTION CONSULTING203/21/2026
HCDARCHITECT203/21/2026
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor603/21/2026
XINOS CONSTRUCTION CORPGeneral Contractor609/07/2026
MOONK ENTERPRISE INCGeneral Contractor403/21/2026
REAL DEPENDABL CONTR CORPGeneral Contractor307/08/2026
SHUIR ELEC'L CONTR'S CORPElectrical203/22/2026
DENNIS HEAVENElectrical203/21/2026
A.GOLDNER INCPlumbing107/08/2026
N.Z. PILGRIM ELECTRIC INCElectrical103/22/2026
TESTA ELECTRIC CO., INCElectrical103/22/2026
VASILIOS MATSIKASElectrical103/21/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
MHR ENTERPRISES CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUEENS ENGINEERING PLLC8898205/01/2026
DEAN MENDEZ ARCHITECT, P.8621103/12/2026
FALCON ENGINEERING CO.LLC5649103/12/2026
NAIZTAT + HAM ARCHITECTS,4048106/09/2023
MERRITT ENGINEERING CONSU460105/24/2021
Building Lifecycle
All (116)Filed (13)Permit Issued (14)Signed Off (5)Facade (FISP) (12)Violation (55)Inspection (3)Special Inspection (14)
07/24/2026
Permit issued — Sidewalk Shed
M01108220-I1-SH
05/01/2026
Filed — Alteration
OUTRIGGERS SYSTEM INSTALLATION FOR FACADE REPAIRS. NO CHANGE OF EGRESS USE OR OCCUPANCY.
M01330246-P1
05/01/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
05/01/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
04/28/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ANDREAS CHRISTOFOROU
04/28/2026
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
04/27/2026
Permit issued — General Construction
M01267611-I1-GC
04/22/2026
Permit issued — Sidewalk Shed
M01108220-I1-SH
03/12/2026
Filed — Alteration
Limited facade repairs at exterior face of masonry walls including brick field replacement, brick corner repairs, bullnose brick replacement, and various flashing repairs at the field wall, penetrations and spandrels. No change to use, egress or occupancy
M01267611-I1
02/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
02/03/2026
Special inspection requirement — Post-installed Anchors
Anthony Volpe
02/03/2026
Special inspection requirement — Masonry
Anthony Volpe
02/03/2026
Special inspection requirement — Final
Anthony Volpe
12/29/2025
Filed — Alteration
OUTRIGGERS SYSTEM INSTALLATION FOR FACADE REPAIRS. NO CHANGE OF EGRESS USE OR OCCUPANCY.
M01330246-I1
12/29/2025
Permit issued — Suspended Scaffold
M01330246-I1-SC
12/02/2025
Permit issued — Sidewalk Shed
M01108220-I1-SH
12/01/2025
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01108220-P3
08/18/2025
Violation issued (HPD, closed)
C
08/18/2025
Violation issued (HPD, closed)
C
08/18/2025
Violation issued (HPD, closed)
B
02/18/2025
Permit issued — General Construction
M00842669-I1-GC
12/05/2024
Signed off — Alteration
Renovation of an existing apartment# D467 on the 4th floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00867206-I1
11/26/2024
Signed off — Alteration
Renovation of an existing apartment# D467 on the 4th floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00867206-S1
09/19/2024
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01108220-P2
09/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2024
Permit issued — Sidewalk Shed
M01108220-I1-SH
09/09/2024
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01108220-I1
07/29/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/17/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00528097-I1
07/17/2024
Signed off — Alteration
M00511519-I1
07/17/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00522651-I1
07/17/2024
Cycle 9 facade report signed — SAFE
04/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/19/2024
Permit issued — General Construction
M00867206-I1-GC
03/15/2024
Permit issued — Plumbing
M00867206-S1-PL
02/21/2024
Cycle 9 facade report submitted
02/06/2024
Cycle 9 facade inspection completed
06/30/2023
Permit issued — General Construction
M00867206-I1-GC
06/15/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING DUPLEX RESIDENTIAL APARTMENT ON 8TH FLOORS. ARCHITECTURAL WORK FOR FLOORING & CABINET IN KITCHEN AND UNDER STAIR AREA. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00842669-I1
06/09/2023
Filed — Alteration
Renovation of an existing apartment# D467 on the 4th floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00867206-I1
06/09/2023
Filed — Alteration
Renovation of an existing apartment# D467 on the 4th floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00867206-S1
03/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/05/2022
Permit issued — General Construction
M00511519-I1-GC
06/09/2021
Permit issued — General Construction
M00511519-I1-GC
05/28/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00528097-I1
05/28/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00522651-P1
05/28/2021
Permit issued — Supported Scaffold
M00528097-I1-SF
05/25/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00522651-I1
05/25/2021
Permit issued — Sidewalk Shed
M00522651-I1-SH
05/24/2021
Filed — Alteration
M00511519-I1
04/27/2021
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
04/27/2021
Special inspection requirement — Fenestration air leakage
Christopher Krepcio
04/27/2021
Special inspection requirement — Final
Christopher Krepcio
04/27/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Krepcio
04/27/2021
Special inspection requirement — Masonry
Christopher Krepcio
07/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2019
Cycle 8 facade report signed — SWARMP
02/20/2019
Cycle 8 facade report submitted
02/15/2019
Cycle 8 facade inspection completed
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP07/24/2026
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP04/27/2026
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP04/22/2026
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP12/29/2025
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP12/02/2025
DOB NOWGeneral ConstructionPermit IssuedMHR ENTERPRISES CORP02/18/2025
DOB NOWSidewalk ShedPermit IssuedXINOS CONSTRUCTION CORP09/10/2024
DOB NOWGeneral ConstructionSigned-offMOONK ENTERPRISE INC03/19/2024
DOB NOWPlumbingSigned-offA.GOLDNER INC03/15/2024
DOB NOWGeneral ConstructionSigned-offMOONK ENTERPRISE INC06/30/2023
DOB NOWGeneral ConstructionSigned-offREAL DEPENDABL CONTR CORP08/05/2022
DOB NOWGeneral ConstructionSigned-offREAL DEPENDABL CONTR CORP06/09/2021
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC05/28/2021
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC05/25/2021
BISEQISSUEDHKS CONSTRUCTION CORP08/30/2018
BISOTISSUEDREAL DEPENDABL CONTR CORP08/08/2018
BISOTISSUEDREAL DEPENDABL CONTR CORP06/08/2017
BISEQISSUEDHKS CONSTRUCTION CORP03/31/2017
BISOTISSUEDREAL DEPENDABL CONTR CORP03/28/2017
BISOTISSUEDCMP CONTRACTING INC11/05/2014
BISOTISSUEDREAL DEPENDABL CONTR CORP07/11/2012
BISEQISSUEDB H & B CONSTRUCTION INC06/15/2012
BISEQISSUEDB H & B CONSTRUCTION INC06/05/2012
BISOTISSUEDL & Z RESTORATION CORP08/26/2010
BISOTISSUEDBAY RESTORATION CORP08/31/2009
BISEQISSUEDBAY RESTORATION CORP08/07/2009
BISOTISSUEDRENOVATION BY MY HOME INC02/04/2008
BISPLISSUEDLRP CORP03/11/2004
BISOTISSUEDANTONINE RENVO CONSTR. CORP02/10/2004
BISPLISSUEDENOBRAC PLUMBING, INC01/29/2003
BISEQISSUEDSPRING SCAFF.11/08/2001
BISOTISSUEDANTOINE RENOVATION_ & CONSTR11/01/1999
BISOTISSUEDDJM CONTRACTING CORP09/08/1998
BISEQISSUEDT.B.R.,INC.07/23/1998
BISOTISSUEDDJM CONTRACTING CORP06/14/1996
12 projects · most recent 12/13/2024
General Wiring
FiledStatusContractorScope
12/13/2024CompleteSHUIR ELEC'L CONTR'S CORPGeneral Wiring
12/03/2024CompleteSUNBIRD ELECTRICAL CONTR—
10/22/2024CompleteN.Z. PILGRIM ELECTRIC INCGeneral Wiring
09/16/2024Permit IssuedTOWER ELECTRIC INC.—
01/10/2024CompleteSHUIR ELEC'L CONTR'S CORPGeneral Wiring
11/08/2022CompleteSHUIR ELEC'L CONTR'S CORPGeneral Wiring
03/17/2022Permit IssuedTESTA ELECTRIC CO., INCGeneral Wiring
01/25/2022Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
08/17/2021Permit IssuedV. VASS ELECTRIC CORPGeneral Wiring
06/10/2021CompleteRICHARD NEU—
01/14/2020CompleteK & G ELECTRIC CO., INC.General Wiring
06/18/2018Permit IssuedSTAR ELEC'L CONTRACTORS C—
1 project · most recent 12/01/2025
Sidewalk Shed
FiledStatusContractorScope
12/01/2025Permit IssuedXINOS CONSTRUCTION CORPSidewalk Shed
1 project · most recent 05/01/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/01/2026Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
05/01/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
05/01/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
04/28/2026Alternative Materials - OTCR Buildings Bulletin NumberANDREAS CHRISTOFOROUspecial
04/28/2026Post-installed AnchorsANDREAS CHRISTOFOROUspecial
02/03/2026Tenant Protection Plan ComplianceDean Mendezspecial
02/03/2026Post-installed AnchorsAnthony Volpespecial
02/03/2026MasonryAnthony Volpespecial
02/03/2026FinalAnthony Volpeprogress
03/12/2023Fire-Resistant Penetrations and Joints—special
04/27/2021Air barrier - visual inspectionChristopher Krepcioenergy_progress
04/27/2021Fenestration air leakageChristopher Krepcioenergy_progress
04/27/2021FinalChristopher Krepcioprogress
04/27/2021Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
04/27/2021MasonryChristopher Krepciospecial
▾Documents — 209 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026M00511519-I1Request digital key ↗
09/03/2026M00522651-I1Request digital key ↗
09/03/2026M00522651-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits26
▸BISWORK PERMIT APPLICATION13
09/04/2018140623298Open ↗
08/10/2018122915621Open ↗
04/05/2017122915621Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
03/29/2017140623298Open ↗
01/30/2017122915621Open ↗
10/06/2014122129286Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWHPD - Permit Notice1
08/13/2026M00511519-I1Open ↗
▸Seals & Professional Certifications67
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
05/28/2019123779134Open ↗
05/28/2019123779134Open ↗
01/30/2017122915621Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/03/2026M00522651-P1Open ↗
09/03/2026M00522651-I1Open ↗
09/03/2026M00528097-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/28/2026M01267611-I1Open ↗
08/28/2026M01267611-I1Open ↗
08/28/2026M01267611-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
10/06/2014122129286Open ↗
06/08/2012121094092Open ↗
06/07/2012121099809Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
06/08/2012121094092Open ↗
06/07/2012121099809Open ↗
08/13/2010120438856Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026M01267611-I1Open ↗
08/26/2026M00511519-I1Open ↗
08/26/2026M00511519-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/29/2017140623298Open ↗
10/06/2014122129286Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/29/2017140623298Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/29/2017140623298Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/28/2019123779134Open ↗
10/06/2014122129286Open ↗
▸BISSCHEDULE B - PLUMBING1
01/23/2008110074419Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
05/28/2019123779134Open ↗
01/30/2017122915621Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
05/28/2019123779134Open ↗
01/30/2017122915621Open ↗
10/06/2014122129286Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
03/02/2010120280999Open ↗
01/23/2008110074419Open ↗
01/23/2008110074419Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026M01267611-I1Open ↗
08/13/2026M00511519-I1Open ↗
08/13/2026M00867206-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
08/13/2010120438856Open ↗
06/11/2009120072795Open ↗
12/02/2008110402653Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
05/28/2019123779134Open ↗
05/28/2019123779134Open ↗
03/24/2017122915621Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
03/25/2013121065998Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/17/2023122915621Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/08/2012121065998Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/17/2023122915621Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/17/2023122915621Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/17/2023122915621Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00511519-I1Open ↗
▸Inspections & Test Reports3
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/17/2023122915621Open ↗
▸BISMASONRY1
05/17/2023122915621Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/29/2017140623298Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
11/14/2018110402653Open ↗
05/01/2013121094092Open ↗
05/01/2013121099809Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
06/08/2012121094092Open ↗
06/07/2012121099809Open ↗
05/08/2012121065998Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/01/2011120280999Open ↗
03/26/2010120072795Open ↗
12/01/2009110074419Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL1
05/17/2023122915621Open ↗
▸BISSHED LETTER1
09/04/2018140623298Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
05/28/2019123779134Open ↗
05/28/2019123779134Open ↗
01/30/2017122915621Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET10
05/28/2019123779134Open ↗
01/30/2017122915621Open ↗
10/06/2014122129286Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION4
07/19/2017122915621Open ↗
07/19/2017122915621Open ↗
07/19/2017122915621Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
03/29/2017140623298Open ↗
▸BISBOROUGH INTAKE FORM1
11/14/2018110402653Open ↗
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/20/2026M01330246-P1Open ↗
08/13/2026M01330246-I1Open ↗
▸DOB NOWCalculations2
08/20/2026M01330246-P1Open ↗
08/13/2026M01330246-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/09/2009110074419Open ↗