← Back
BuildNYC
Two stories - detached, small or mid-size
75 REAR GREENLEAF AVENUE
STATEN ISLAND · Port Richmond · BIN 5156237
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R3AZoning
1,300 sfGross Floor Area
1Units
0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
Structural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 13 docs
Floor 11 filing · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Design Build SI210/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Build SI403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZNJ ConstructionGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lawrence Mandarino Architects724310/17/2023
Building Lifecycle
All (12)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (7)
01/26/2024
Signed off — Alteration
PLANS AND DOCUMENTS FILED HEREWITH TO OBTAIN PERMIT TO RESOLVE DOB VIOLATION, RESTORE GARAGE ROOF TO PRIOR LEGAL CONDITION, INSTALL NEW BLOCK WALL AND GARAGE DOOR AS SHOWN IN PLANS.
S00933218-I1
10/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Lawrence Mandarino
10/18/2023
Special inspection requirement — Masonry
Lawrence Mandarino
10/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Lawrence Mandarino
10/18/2023
Special inspection requirement — Structural Wood Frame
Lawrence Mandarino
10/18/2023
Special inspection requirement — Final
Lawrence Mandarino
10/18/2023
Special inspection requirement — Electric vehicle service equipment requirements
Lawrence Mandarino
10/18/2023
Special inspection requirement — Interior lighting power
Lawrence Mandarino
10/17/2023
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH TO OBTAIN PERMIT TO RESOLVE DOB VIOLATION, RESTORE GARAGE ROOF TO PRIOR LEGAL CONDITION, INSTALL NEW BLOCK WALL AND GARAGE DOOR AS SHOWN IN PLANS.
S00933218-P1
10/11/2023
Permit issued — Structural
S00933218-I1-GC-CX
09/18/2023
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH TO OBTAIN PERMIT TO RESOLVE DOB VIOLATION, RESTORE GARAGE ROOF TO PRIOR LEGAL CONDITION, INSTALL NEW BLOCK WALL AND GARAGE DOOR AS SHOWN IN PLANS.
S00933218-I1
08/16/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offZNJ Construction10/11/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/18/2023Structural Stability – Alterations of existing buildingsLawrence Mandarinospecial
10/18/2023MasonryLawrence Mandarinospecial
10/18/2023Energy Code Compliance InspectionsLawrence Mandarinoprogress
10/18/2023Structural Wood FrameLawrence Mandarinoprogress
10/18/2023FinalLawrence Mandarinoprogress
10/18/2023Electric vehicle service equipment requirementsLawrence Mandarinoenergy_progress
10/18/2023Interior lighting powerLawrence Mandarinoenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026S00933218-I1Request digital key ↗
08/22/2026S00933218-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026S00933218-I1Open ↗
08/22/2026S00933218-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S00933218-I1Open ↗
09/01/2026S00933218-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S00933218-I1Open ↗
09/01/2026S00933218-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026S00933218-I1Open ↗
08/22/2026S00933218-P1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00933218-I1Open ↗
08/13/2026S00933218-P1Open ↗