| Owner | Filings | Most Recent |
|---|---|---|
| RXR REALTY | 157 | 07/08/2026 |
| LEGION INVESTMENT GROUP | 4 | 03/22/2026 |
| 75 PLAZA | 1 | 03/22/2026 |
| ENGLEWOOD CONSTRUCTION | 3 | 03/22/2026 |
| RXR CONSTRUCTION DEVELOPMENT | 16 | 03/22/2026 |
| 75 PLAZA MARLENE KATZ | 4 | 03/22/2026 |
| CITY 75 | 1 | 03/22/2026 |
| 30 W 52 REST LLC D B A BOMBAY PL | 4 | 03/21/2026 |
| RXR | 5 | 03/21/2026 |
| TIME WARNER REAL ESTATE | 14 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| B2R CONSULTING ENGINEERS, PLLC | 15 | 08/25/2026 |
| ANZ CONSULTING ENGINEERING, PLLC | 5 | 08/18/2026 |
| NELSON ARCHITECTURE &INTERIORS, INC | 5 | 08/12/2026 |
| COSENTINI ASSOCIATES | 6 | 05/20/2026 |
| STANTEC CONSULTING | 3 | 03/26/2026 |
| STANTEC | 1 | 03/26/2026 |
| WID CHAPMAN ARCHITECTS | 3 | 03/04/2026 |
| ALNOUR CONSULTING | 1 | 02/20/2026 |
| HED ARCHITECTURE PLLC | 2 | 10/01/2025 |
| H.OH ARCHITECTURE P.C. | 1 | 09/12/2025 |
| THORNTON TOMASETTI | 2 | 02/13/2025 |
| PCS ENGINEERING | 2 | 01/02/2025 |
| RODNEY D. GIBBLE CONSULTING ENGINEE | 1 | 11/19/2024 |
| MSM ENGINEERING SERVICES, PLLC | 2 | 11/12/2024 |
| GGA STUDIOS, DPC | 2 | 02/08/2024 |
| VOCON | 4 | 08/15/2023 |
| MG ENGINEERING D.P.C. | 33 | 08/04/2023 |
| PRAXES PLLC | 4 | 06/15/2023 |
| ROBERT DERECTOR ASSOCIATES | 3 | 01/18/2023 |
| INTERIOR ARCHITECTS | 1 | 01/17/2023 |
| GENSLER | 3 | 05/02/2022 |
| SAFWAY ATLANTIC LLC | 1 | 07/29/2020 |
| A/R ENVIRONETICS ARCHITECTS PC | 1 | 10/22/2019 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 08/19/2019 |
| MURDOCH ENGINEERING | 1 | 11/15/2017 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 79 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 8 | 03/21/2026 |
| RIGGING CONSULTANTS | 4 | 03/21/2026 |
| DOMANI CONSULTING | 2 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 2 | 03/21/2026 |
| D R BROWN | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RXR CONSTRUCTION SERV LLC | General Contractor | 50 | 08/26/2026 |
| MACCARONE PLUMBING INC | Fire Protection | 8 | 07/08/2026 |
| SAVCON CONSTRUCTION LLC | General Contractor | 8 | 07/08/2026 |
| DKT CONTRACTORS LLC | General Contractor | 6 | 07/08/2026 |
| VANGUARD CONSTRUCTION AND | General Contractor | 5 | 08/16/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 4 | 07/08/2026 |
| LAWRENCE J. LEVINE | Fire Protection | 4 | 03/21/2026 |
| DOUGHERTY, EDWARD | Electrical | 4 | 03/21/2026 |
| KEMRAJ, DEVANAND | Electrical | 4 | 03/21/2026 |
| MJH ENERGY CONSULTING INC | Fire Protection | 3 | 07/08/2026 |
| BNF CONTRACTORS INC | General Contractor | 3 | 07/08/2026 |
| LUCIANO, ANTHONY | Electrical | 3 | 03/21/2026 |
| CM AND ASSOCIATES CONST | General Contractor | 3 | 03/21/2026 |
| MACCARONE PLUMBING INC | Plumbing | 3 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 3 | 07/08/2026 |
| PACE PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| ANTHONY LUCIANO | Electrical | 3 | 03/21/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 2 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 2 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 2 | 04/09/2026 |
| MANENGEERING BUREAU INC | Fire Protection | 2 | 07/08/2026 |
| P.E. STONE INC | Electrical | 2 | 03/22/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 2 | 07/08/2026 |
| ELTON ZYKA | Electrical | 2 | 03/21/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CONSULTING AND TESTING SE | 6152 | 50 | 08/25/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 6 | 03/31/2026 |
| CODEGREEN | 510 | 14 | 03/26/2026 |
| SKYLINE ENGINEERING, PLLC | 267 | 2 | 02/13/2025 |
| PCS ENGINEERING | 3745 | 2 | 01/02/2025 |
| JOSEPH MARTINES PE, PLLC | 1428 | 3 | 01/18/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 08/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR CONSTRUCTION SERV LLC | 08/25/2026 |
| DOB NOW | Structural | Permit Issued | VANGUARD CONSTRUCTION AND | 08/14/2026 |
| DOB NOW | General Construction | Permit Issued | VANGUARD CONSTRUCTION AND | 05/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 04/09/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 04/07/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 04/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 04/02/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 04/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR CONSTRUCTION SERV LLC | 04/01/2026 |
| DOB NOW | General Construction | Permit Issued | VANGUARD CONSTRUCTION AND | 03/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | BLUEWATER P&H, INC | 03/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | VANGUARD CONSTRUCTION AND | 03/09/2026 |
| DOB NOW | Structural | Permit Issued | VANGUARD CONSTRUCTION AND | 03/09/2026 |
| DOB NOW | Plumbing | Permit Issued | BYPASS MECHANICAL CORP | 03/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | MJH ENERGY CONSULTING INC | 03/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RXR CONSTRUCTION SERV LLC | 01/30/2026 |
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 01/30/2026 |
| DOB NOW | General Construction | Signed-off | DKT CONTRACTORS LLC | 10/03/2025 |
| DOB NOW | Structural | Signed-off | 4 STAR CONTRACTING INC | 09/22/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 08/01/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 06/10/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 05/16/2025 |
| DOB NOW | General Construction | Signed-off | RXR CONSTRUCTION SERV LLC | 04/16/2025 |
| DOB NOW | Mechanical Systems | Signed-off | RXR CONSTRUCTION SERV LLC | 04/15/2025 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 04/01/2025 |
| DOB NOW | Sprinklers | Permit Issued | MJH ENERGY CONSULTING INC | 03/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | RXR CONSTRUCTION SERV LLC | 02/28/2025 |
| DOB NOW | General Construction | Signed-off | RXR CONSTRUCTION SERV LLC | 02/28/2025 |
| DOB NOW | Sprinklers | Signed-off | AGGRESSIVE FIRE PROT LLC | 02/27/2025 |
| DOB NOW | Sprinklers | Signed-off | MACCARONE PLUMBING INC | 02/21/2025 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 02/21/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CLUNE CONSTRUCTION CO LP | 01/28/2025 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 01/27/2025 |
| DOB NOW | Sprinklers | Signed-off | MACCARONE PLUMBING INC | 01/22/2025 |
| DOB NOW | Structural | Signed-off | RXR CONSTRUCTION SERV LLC | 01/06/2025 |
| DOB NOW | General Construction | Signed-off | RXR CONSTRUCTION SERV LLC | 01/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | RXR CONSTRUCTION SERV LLC | 01/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | RXR CONSTRUCTION SERV LLC | 11/25/2024 |
| DOB NOW | Structural | Signed-off | RXR CONSTRUCTION SERV LLC | 11/25/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/18/2026 | Permit Issued | VANGUARD CONSTRUCTION AND | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Water Furnace V5AH072BD3AN4DERBADN212SSS 2,000 CFM · Wshp ×10 V5AB012BD3AN4DERBADN212SSS 400 CFM · Wshp ×4 V5AH018BD3AN4DERBADN212SSS 600 CFM · Wshp ×2 V5AH024BD3AN4DERBADN212SSS 800 CFM · Wshp ×2 V5AH048BD3AN4DERBADN212SSS 1,530 CFM · Wshp ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | Permit Issued | BLUEWATER P&H, INC | Sprinkler System |
| 08/12/2026 | — | — | — |
| 03/26/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | 106 heads |
| 11/19/2024 | Permit Issued | MJH ENERGY CONSULTING INC | 12 heads |
| 04/23/2022 | Signed-off | MACCARONE PLUMBING INC | 216 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | — | — | Water/Sanitary |
| 08/18/2026 | Permit Issued | PLUMBING WORKS CORP | Gas, Water/Sanitary |
| 08/12/2026 | — | — | — |
| 03/26/2026 | — | — | — |
| 03/26/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 05/02/2022 | Permit Issued | MACCARONE PLUMBING INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/11/2026 | Permit Issued | FRED GELLER ELEC'L INC. | — |
| 04/22/2026 | Complete | RIGID ELECTRIC, INC. | General Wiring |
| 03/26/2026 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 03/21/2026 | Permit Issued | LIFE SPOT ELECTRIC CORP | General Wiring |
| 02/13/2026 | Permit Issued | P.E. STONE INC | General Wiring |
| 11/04/2025 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 02/25/2025 | Complete | P.E. STONE INC | General Wiring |
| 02/21/2025 | Complete | RAIDEN ELECTRIC LLC | General Wiring |
| 08/21/2024 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 03/19/2024 | Permit Issued | OMD ELECTRICAL CORP | 1 meters, 1 new_meters |
| 01/30/2024 | Complete | P.E. STONE INC | General Wiring |
| 09/25/2023 | Complete | P.E. STONE INC | General Wiring |
| 09/05/2023 | Complete | FRED GELLER ELEC'L INC. | General Wiring |
| 08/24/2023 | Complete | P.E. STONE INC | General Wiring |
| 02/01/2023 | Permit Issued | FRED GELLER ELEC'L INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | Permit Issued | VANGUARD CONSTRUCTION AND | Steel, Concrete |
| 08/19/2019 | Permit Issued | RXR CONSTRUCTION & DEVELO | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/02/2025 | Permit Issued | 4 STAR CONTRACTING INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/23/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/19/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/23/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/02/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/21/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/15/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/10/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/22/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/10/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/09/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/07/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/01/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/16/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/10/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/18/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/27/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/21/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/24/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/01/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/19/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/12/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/29/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 07/29/2026 | Sprayed fire-resistant materials | DANIEL CREIGHTON | special |
| 05/21/2026 | Sprinkler Systems | DANIEL CREIGHTON | special |
| 05/21/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 05/19/2026 | Final | DANIEL CREIGHTON | progress |
| 05/19/2026 | Mechanical Systems | DANIEL CREIGHTON | special |
| 05/19/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 05/19/2026 | Final | DANIEL CREIGHTON | progress |
| 04/01/2026 | Mechanical Systems | Christopher Drutjons | special |
| 04/01/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 04/01/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 04/01/2026 | Final | Christopher Drutjons | progress |
| 03/23/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 03/23/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 03/23/2026 | Mechanical Systems | Christopher Drutjons | special |
| 03/23/2026 | Final | Christopher Drutjons | progress |
| 03/13/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 03/10/2026 | Fire-Resistance Rated Construction | HATIM ELSAID | progress |
| 03/10/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 03/10/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 03/10/2026 | Final | HATIM ELSAID | progress |
| 03/10/2026 | Final | HATIM ELSAID | progress |
| 03/10/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 03/10/2026 | Mechanical Systems | HATIM ELSAID | special |
| 02/17/2026 | Post-installed Anchors | Christopher Drutjons | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Jack D's Steakhouse | Restaurant / Food Service | Ground, Mezzanine | Project M01247483 |
| Quinbrook | Office | Floor 18 | Project M01341483 Project M01341485 Project M01341486 |
| Basepoint | Office | Floor 19 | Project M01192726 |
| Guidehouse | Office | Floors 9, 10 | Project M01157207 Project M01157209 Project M01157213 Project M01157219 |
| RXR | Office | Floor 30 | Project M00906100 |
| SKsquare Americas | Office | Floor 18 | Project M00769132 |
| SK Square | Office | Floor 24 | Project M00726691 |
| Rand Merchant | Office | Floor 23 | Project M00675754 |