← Back
BuildNYC
Office, 20+ stories, with or without commercial
75 ROCKEFELLER PLAZA
MANHATTAN · BIN 1034512
💬 Discuss this project
1947Year Built
33Stories
O4Building Class
C5-2.5Zoning
582,428 sfGross Floor Area
8Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 75 Plaza · 37,557 sf lot · 15.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsRxr Realty2 filings
Roof75 Rockefeller Plaza1p · 1 filing · 13 docs
BulkheadRxr Realty1p · 1 filing · 8 docs
Floor 33Rxr Realty1 filing · 7 docs
Floor 32
Floor 31
Floor 30RXR5p · 4 filings · 20 docs
Floor 29Rxr Sl Owner LLC3p · 4 filings · 20 docs
Floor 28Rxr Sl Owner LLC5p · 4 filings · 20 docs
Floor 27Pallas3p · 4 filings · 20 docs
Floor 26RXR - 75 Rock Pre-Builds F24-267p · 4 filings · 20 docs
Floor 25Jack D's SteakhouseUnder Construction7p · 5 filings · 20 docs
Floor 24Jack D's Steakhouse, SK SquareUnder Construction9p · 10 filings · 20 docs
Floor 23Rand Merchant, K&LGroup5p · 4 filings · 17 docs
Floor 22K&LGroup4p · 3 filings · 12 docs
Floor 21K&LGroup4p · 3 filings · 12 docs
Floor 20
Floor 19Basepoint6p · 3 filings · 18 docs
Floor 18Quinbrook, SKsquare AmericasUnder Construction6p · 8 filings · 20 docs
Floor 17Legion Investment Group, K&LGroup2p · 3 filings · 19 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11Rxr Sl Owner LLCUnder Construction2p · 6 filings · 12 docs
Floor 10Jack D's Steakhouse, GuidehouseUnder Construction16p · 6 filings · 20 docs
Floor 9Guidehouse16p · 8 filings · 20 docs
Floor 8Rxr Sl Owner LLCUnder Construction3p · 9 filings · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Jack D's SteakhouseUnder Construction1 filing · 20 docs
Floor 2Jack D's SteakhouseUnder Construction2p · 1 filing · 20 docs
Floor 1Jack D's Steakhouse, NielsenUnder Construction13p · 3 filings · 20 docs
MezzanineJack D's SteakhouseUnder Construction15p · 2 filings · 20 docs
CellarJack D's SteakhouseUnder Construction4p · 1 filing · 20 docs
Sub-CellarJack D's Steakhouse, NielsenUnder Construction2p · 5 filings · 20 docs
Site & exterior75 Rockefeller Plaza4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Time Warner27703/21/2026
RXR SL Owner27510/13/2026
RXR Realty16307/08/2026
Rock 75-Plaza4703/21/2026
Time Warner Inc Agent for Owner2003/21/2026
Time Warner Real Estate1503/21/2026
RXR Construction & Development1003/21/2026
Legion Investment Group403/22/2026
30 W 52 Rest LLC Dba Bombay PL403/21/2026
Rockefeller Properties303/21/2026
75 Plaza103/22/2026
Convene103/21/2026
Anthos103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen7903/21/2026
Milrose Consultants803/21/2026
Rigging Consultants403/21/2026
Domani Consulting203/21/2026
William Vitacco Associates203/21/2026
A1 Expediting Service203/21/2026
D R Brown203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RXR Construction ServiceGeneral Contractor5008/26/2026
Maccarone PlumbingFire Protection807/08/2026
Savcon ConstructionGeneral Contractor807/08/2026
DKT ContractorsGeneral Contractor607/08/2026
Jam ElectricalElectrical603/21/2026
Vanguard Construction andGeneral Contractor508/16/2026
Lawrence J. LevineFire Protection403/21/2026
Safway AtlanticScaffold407/08/2026
Pem ElectricalElectrical403/21/2026
Maccarone PlumbingPlumbing307/08/2026
MJH Energy ConsultingFire Protection307/08/2026
CM and Associates ConstructionGeneral Contractor303/21/2026
Par Plumbing CoPlumbing307/08/2026
Pace PlumbingPlumbing307/08/2026
BNF ContractorsGeneral Contractor307/08/2026
JT Magen & CompanyGeneral Contractor204/09/2026
Par Fire ProtectionFire Protection207/08/2026
Rael Automatic Sprinkler CoFire Protection207/08/2026
4 Star ContractingGeneral Contractor204/09/2026
Clune Construction CoGeneral Contractor207/08/2026
Manengeering BureauFire Protection207/08/2026
Andamio ScaffoldingScaffold207/08/2026
Aggressive Fire ProtectionFire Protection207/08/2026
Allran Electric of NYElectrical203/21/2026
P.E. StoneElectrical203/22/2026
Sirina Fire ProtectionFire Protection107/08/2026
Par Plumbing Co., Inc.oFire Protection103/21/2026
Balaton ConsultingSign hanger107/08/2026
Archer Consultants GroupFire Protection110/09/2026
Bypass MechanicalPlumbing107/08/2026
Just Plumbing IndustriesPlumbing107/08/2026
Pace PlumbingFire Protection107/08/2026
Plumbing WorksFire Protection107/08/2026
Life Spot ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Consulting and Testing SE61525008/25/2026
Milrose Consultants2003603/31/2026
Codegreen5101403/26/2026
Skyline Engineering267202/13/2025
PCS Engineering3745201/02/2025
Joseph Martines PE1428301/18/2023
Building Lifecycle
All (300)Filed (73)Permit Issued (80)Signed Off (47)Facade (FISP) (6)Violation (9)Inspection (39)Objection (16)Special Inspection (30)
10/08/2026
Permit issued — Sprinklers
M01404626-I1-EW-SP
09/24/2026
Filed — Alteration CO
General construction on floors SC1, Cel, 01, MZ1 as per plans filed herewith. no changes in use, egress or occupancy.
M01247347-P3
08/25/2026
Filed — Alteration
Plumbing modifications on 8th floor as per plans filed herewith. No changes in use, egress or occupancy.
M01438100-I1
08/25/2026
Permit issued — Mechanical Systems
M01404607-I1-MS
08/25/2026
Permit issued — General Construction
M01404599-I1-GC
08/18/2026
Filed — Alteration CO
General construction on floors SC1, Cel, 01, MZ1 as per plans filed herewith. no changes in use, egress or occupancy.
M01247347-P2
08/14/2026
Permit issued — Structural
M01247347-S2-ST
08/12/2026
Filed — Alteration
Sprinkler modifications on 8th floor as per plans filed herewith. No changes in use, egress or occupancy.
M01404626-I1
08/12/2026
Filed — Alteration
General construction on the 8th floor as per plans filed herewith. No changes in use, egress or occupancy.
M01404599-I1
08/11/2026
Filed — Alteration
Mechanical modifications on 8th floor as per plans filed herewith. No changes in use, egress or occupancy.
M01404607-I1
08/04/2026
Signed off — Alteration
M01157219-I1
07/29/2026
Special inspection requirement — Sprayed fire-resistant materials
DANIEL CREIGHTON
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL CREIGHTON
07/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/21/2026
Special inspection requirement — Sprinkler Systems
DANIEL CREIGHTON
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL CREIGHTON
05/20/2026
Filed — Alteration
M01157219-P1
05/19/2026
Special inspection requirement — Final
DANIEL CREIGHTON
05/19/2026
Special inspection requirement — Final
DANIEL CREIGHTON
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL CREIGHTON
05/19/2026
Special inspection requirement — Mechanical Systems
DANIEL CREIGHTON
05/18/2026
Permit issued — General Construction
M01247347-I1-GC
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2026
Permit issued — Sprinklers
M01370019-I1-EW-SP
04/07/2026
Permit issued — Plumbing
M01370009-I1-PL
04/02/2026
Permit issued — Mechanical Systems
M01369969-I1-MS
04/02/2026
Permit issued — General Construction
M01369957-I1-GC
04/01/2026
Permit issued — General Construction
M01341483-I1-GC
04/01/2026
Permit issued — Mechanical Systems
M01341485-I1-MS
04/01/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
04/01/2026
Special inspection requirement — Final
Christopher Drutjons
04/01/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
03/31/2026
Filed — Alteration CO
General construction on floors SC1, Cel, 01, MZ1 as per plans filed herewith. no changes in use, egress or occupancy.
M01247347-P1
03/26/2026
Signed off — Alteration
general construction on floors 9-10 as per plans filed herewith. no changes in use, egress or occupancy.
M01157207-I1
03/26/2026
Signed off — Alteration
mechanical modifications on floors 9-10 as per plans filed herewith. no changes in use, egress or occupancy.
M01157209-I1
03/26/2026
Filed — Alteration
plumbing modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
M01370009-I1
03/26/2026
Filed — Alteration
sprinkler modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
M01370019-I1
03/26/2026
Filed — Alteration
general construction on the 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
M01369957-I1
03/26/2026
Filed — Alteration
mechanical modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
M01369969-I1
03/26/2026
Signed off — Alteration
plumbing modifications on floors 9-10 as per plans filed herewith. no changes in use, egress or occupancy.
M01157213-I1
03/23/2026
Special inspection requirement — Final
Christopher Drutjons
03/23/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
03/23/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Special inspection requirement — Post-installed Anchors
HATIM ELSAID
03/10/2026
Permit issued — General Construction
M01247347-S1-GC
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
03/10/2026
Special inspection requirement — Final
HATIM ELSAID
03/10/2026
Special inspection requirement — Final
HATIM ELSAID
03/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
HATIM ELSAID
03/10/2026
Special inspection requirement — Sprinkler Systems
HATIM ELSAID
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedArcher Consultants Group10/08/2026
DOB NOWMechanical SystemsPermit IssuedRXR Construction Service08/25/2026
DOB NOWGeneral ConstructionPermit IssuedRXR Construction Service08/25/2026
DOB NOWStructuralPermit IssuedVanguard Construction and08/14/2026
DOB NOWGeneral ConstructionPermit IssuedVanguard Construction and05/18/2026
DOB NOWSprinklersPermit IssuedAggressive Fire Protection04/09/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co04/07/2026
DOB NOWMechanical SystemsPermit IssuedJT Magen & Company04/02/2026
DOB NOWGeneral ConstructionPermit IssuedJT Magen & Company04/02/2026
DOB NOWGeneral ConstructionPermit IssuedRXR Construction Service04/01/2026
DOB NOWMechanical SystemsPermit IssuedRXR Construction Service04/01/2026
DOB NOWGeneral ConstructionPermit IssuedVanguard Construction and03/10/2026
DOB NOWSprinklersPermit IssuedBluewater P&H03/09/2026
DOB NOWPlumbingPermit IssuedBypass Mechanical03/09/2026
DOB NOWMechanical SystemsPermit IssuedVanguard Construction and03/09/2026
DOB NOWStructuralPermit IssuedVanguard Construction and03/09/2026
DOB NOWSprinklersPermit IssuedMJH Energy Consulting03/03/2026
DOB NOWMechanical SystemsPermit IssuedRXR Construction Service01/30/2026
DOB NOWGeneral ConstructionPermit IssuedRXR Construction Service01/30/2026
DOB NOWGeneral ConstructionSigned-offDKT Contractors10/03/2025
DOB NOWStructuralSigned-off4 Star Contracting09/22/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding08/01/2025
DOB NOWSprinklersSigned-offLawrence J. Levine06/10/2025
DOB NOWSprinklersSigned-offLawrence J. Levine05/16/2025
DOB NOWGeneral ConstructionSigned-offRXR Construction Service04/16/2025
DOB NOWMechanical SystemsSigned-offRXR Construction Service04/15/2025
DOB NOWPlumbingSigned-offPar Plumbing Co04/01/2025
DOB NOWSprinklersPermit IssuedMJH Energy Consulting03/05/2025
DOB NOWGeneral ConstructionSigned-offRXR Construction Service02/28/2025
DOB NOWMechanical SystemsSigned-offRXR Construction Service02/28/2025
DOB NOWSprinklersSigned-offAggressive Fire Protection02/27/2025
DOB NOWSprinklersSigned-offMaccarone Plumbing02/21/2025
DOB NOWPlumbingSigned-offPar Plumbing Co02/21/2025
DOB NOWMechanical SystemsSigned-offClune Construction Co01/28/2025
DOB NOWGeneral ConstructionSigned-offClune Construction Co01/27/2025
DOB NOWSprinklersSigned-offMaccarone Plumbing01/22/2025
DOB NOWGeneral ConstructionSigned-offRXR Construction Service01/06/2025
DOB NOWMechanical SystemsSigned-offRXR Construction Service01/06/2025
DOB NOWStructuralSigned-offRXR Construction Service01/06/2025
DOB NOWStructuralSigned-offRXR Construction Service11/25/2024
+ 60 more permits on file
1 project · most recent 09/24/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/24/2026Permit IssuedVanguard Construction andHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Water Furnace V5AH072BD3AN4DERBADN212SSS 2,000 CFM · Wshp ×10
V5AB012BD3AN4DERBADN212SSS 400 CFM · Wshp ×4
V5AH018BD3AN4DERBADN212SSS 600 CFM · Wshp ×2
V5AH024BD3AN4DERBADN212SSS 800 CFM · Wshp ×2
V5AH048BD3AN4DERBADN212SSS 1,530 CFM · Wshp ×2
5 projects · most recent 09/24/2026
Sprinkler System
FiledStatusContractorScope
09/24/2026Permit IssuedBluewater P&HSprinkler System
08/12/2026Permit IssuedArcher Consultants Group—
03/26/2026Permit IssuedAggressive Fire Protection106 heads
11/19/2024Permit IssuedMJH Energy Consulting12 heads
04/23/2022Signed-offMaccarone Plumbing216 heads
6 projects · most recent 09/24/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/24/2026Permit IssuedPlumbing WorksGas, Water/Sanitary
08/25/2026——Water/Sanitary
08/12/2026———
03/26/2026Permit IssuedPar Plumbing CoWater/Sanitary
03/26/2026———
05/02/2022Permit IssuedMaccarone PlumbingWater/Sanitary
25 projects · most recent 09/11/2026
General Wiring Lighting
FiledStatusContractorScope
09/11/2026Permit IssuedFred Geller Electrical—
04/22/2026CompleteRigid ElectricGeneral Wiring
03/26/2026Permit IssuedRobert B SamuelsGeneral Wiring
03/21/2026Permit IssuedLife Spot ElectricGeneral Wiring
02/13/2026CompleteP.E. StoneGeneral Wiring
11/04/2025CompleteAtlas-Acon Electric ServiceGeneral Wiring
02/25/2025CompleteP.E. StoneGeneral Wiring
02/21/2025CompleteRaiden ElectricGeneral Wiring
08/21/2024CompleteBorowide Elect'l Contractors—
03/19/2024Permit IssuedOmd Electrical1 meters, 1 new_meters
01/30/2024CompleteP.E. StoneGeneral Wiring
09/25/2023CompleteP.E. StoneGeneral Wiring
09/05/2023CompleteFred Geller ElectricalGeneral Wiring
08/24/2023CompleteP.E. StoneGeneral Wiring
02/01/2023Permit IssuedFred Geller ElectricalGeneral Wiring
2 projects · most recent 09/24/2026
Concrete Steel
FiledStatusContractorScope
09/24/2026Permit IssuedVanguard Construction andSteel, Concrete
08/19/2019Permit IssuedRXR Construction & DevelopmentConcrete
1 project · most recent 01/02/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
01/02/2025Permit Issued4 Star ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 39
DateTypeResultReport
07/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/19/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 39.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/29/2026Sprayed fire-resistant materialsDANIEL CREIGHTONspecial
07/29/2026Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
05/21/2026Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
05/21/2026Sprinkler SystemsDANIEL CREIGHTONspecial
05/19/2026Mechanical SystemsDANIEL CREIGHTONspecial
05/19/2026FinalDANIEL CREIGHTONprogress
05/19/2026Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
05/19/2026FinalDANIEL CREIGHTONprogress
04/01/2026Post-installed AnchorsChristopher Drutjonsspecial
04/01/2026FinalChristopher Drutjonsprogress
04/01/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
04/01/2026Mechanical SystemsChristopher Drutjonsspecial
03/23/2026Mechanical SystemsChristopher Drutjonsspecial
03/23/2026Post-installed AnchorsChristopher Drutjonsspecial
03/23/2026FinalChristopher Drutjonsprogress
03/23/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
03/13/2026Post-installed AnchorsHATIM ELSAIDspecial
03/10/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
03/10/2026Sprinkler SystemsHATIM ELSAIDspecial
03/10/2026Mechanical SystemsHATIM ELSAIDspecial
03/10/2026FinalHATIM ELSAIDprogress
03/10/2026FinalHATIM ELSAIDprogress
03/10/2026Fire-Resistance Rated ConstructionHATIM ELSAIDprogress
03/10/2026Post-installed AnchorsHATIM ELSAIDspecial
02/17/2026Post-installed AnchorsChristopher Drutjonsspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Jack D's SteakhouseRestaurant / Food ServiceSub-cellar, Cellar, Floors 1–3, 10, 24, 25, Mezzanine
Project M01247483 No Work · Approved · 03/04/2026
Project M01247347 Alteration CO · Permit Entire · 01/22/2026
QuinbrookOfficeFloor 18
Project M01341483 Alteration · Permit Entire · 01/13/2026
Project M01341485 Alteration · Permit Entire · 01/13/2026
Project M01341486 Alteration · Permit Entire · 01/12/2026
BasepointOfficeFloor 19
Project M01192726 Alteration · LOC Issued · 03/28/2025
Project M01192737 Alteration · LOC Issued · 03/28/2025
Project M01192743 Alteration · LOC Issued · 03/28/2025
PallasOfficeFloor 27
Project M01160188 Alteration · LOC Issued · 02/26/2025
Project M01160191 Alteration · LOC Issued · 02/26/2025
Project M01160194 Alteration · LOC Issued · 02/26/2025
Project M01160195 Alteration · LOC Issued · 02/26/2025
GuidehouseOfficeFloors 9, 10
Project M01157207 Alteration · LOC Issued · 01/24/2025
Project M01157209 Alteration · LOC Issued · 01/24/2025
Project M01157213 Alteration · LOC Issued · 01/24/2025
Project M01157219 Alteration · LOC Issued · 01/24/2025
Legion Investment GroupOfficeFloor 17
Project M00985833 Alteration · LOC Issued · 01/30/2024
RXROfficeFloor 30
Project M00906100 Alteration · LOC Issued · 08/15/2023
NielsenOfficeSub-cellar
Project M00763705 Alteration · LOC Issued · 01/18/2023
Project M00762752 Alteration · LOC Issued · 01/17/2023
Project M00763683 Alteration · LOC Issued · 01/17/2023
Project M00763699 Alteration · LOC Issued · 01/17/2023
SKsquare AmericasOfficeFloor 18
Project M00769132 Alteration · LOC Issued · 08/09/2022
SK SquareOfficeFloor 24
Project M00726691 Alteration · LOC Issued · 05/06/2022
Project M00726699 Alteration · LOC Issued · 05/06/2022
Project M00726725 Alteration · LOC Issued · 05/06/2022
Project M00720088 Alteration · LOC Issued · 05/05/2022
Rand MerchantOfficeFloor 23
Project M00675754 Alteration · Permit Entire · 03/09/2022
K&LGroupOfficeFloors 17, 21–23
Project M00388389 Alteration · LOC Issued · 09/17/2020
Project M00388396 Alteration · LOC Issued · 09/17/2020
Project M00388400 Alteration · LOC Issued · 09/17/2020
Project M00389361 Alteration · LOC Issued · 09/14/2020
Project M00389369 Alteration · LOC Issued · 09/14/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,728 on file (BIS + DOB NOW)
▸Plans & Drawings100
▸DOB NOWPlans/Sketch85
09/06/2026M00001942-I1Request digital key ↗
09/03/2026M00634723-I1Request digital key ↗
09/03/2026M00634723-P1Request digital key ↗
Showing 3 of 85 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00188848-I1Request digital key ↗
09/05/2026M00322460-I1Request digital key ↗
09/04/2026M00389361-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00322509-I1Request digital key ↗
09/04/2026M00389369-I1Request digital key ↗
09/04/2026M00388400-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00191881-I1Request digital key ↗
09/04/2026M00388396-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/05/2026M00249030-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00376543-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00192849-I1Request digital key ↗
▸Applications & Permits518
▸BISPLAN / WORK APPROVAL APPLICATION265
06/10/2025122162328Open ↗
06/10/2025140956491Open ↗
06/10/2025140949455Open ↗
Showing 3 of 265 on file for this type
▸BISWORK PERMIT APPLICATION163
11/24/2020140960725Open ↗
11/23/2020140950898Open ↗
11/02/2020123909477Open ↗
Showing 3 of 163 on file for this type
▸DOB NOWLPC Approval/Permit70
10/05/2026M01247347-P3Open ↗
09/10/2026M01438100-P1Open ↗
09/04/2026M00388396-I1Open ↗
Showing 3 of 70 on file for this type
▸BISPLACE OF ASSEMBLY11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWState DEC Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT3
06/06/2024121185270Open ↗
06/06/2024123684085Open ↗
06/06/2024123388235Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications697
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION297
11/02/2020123909477Open ↗
11/02/2020123909477Open ↗
04/17/2020122889981Open ↗
Showing 3 of 297 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature101
10/05/2026M01247347-P3Open ↗
09/10/2026M01438100-P1Open ↗
09/06/2026M00001942-I1Open ↗
Showing 3 of 101 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature89
10/07/2026M00322509-I1Open ↗
10/03/2026M00811047-P1Open ↗
10/03/2026M00811047-P1Open ↗
Showing 3 of 89 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT69
11/11/2020140950898Open ↗
10/19/2020140960725Open ↗
09/25/2020140956491Open ↗
Showing 3 of 69 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST67
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 67 on file for this type
▸DOB NOWProgress Inspector Seal & Signature47
10/03/2026M00810668-I1Open ↗
10/03/2026M00389361-I1Open ↗
09/30/2026M01192737-I1Open ↗
Showing 3 of 47 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
11/11/2020140950898Open ↗
10/19/2020140960725Open ↗
09/25/2020140956491Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
11/11/2020140950898Open ↗
10/19/2020140960725Open ↗
09/25/2020140956491Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment170
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE60
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 60 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA32
09/11/2020123498633Open ↗
06/26/2020123155156Open ↗
Showing 2 of 32 on file for this type
▸BISEQUIPMENT USE PERMITS30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSTREET TREE SIGNOFF2
06/06/2024123684085Open ↗
06/06/2024121185270Open ↗
▸DOB NOWStreet Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos178
▸DOB NOWDEP ACP-5: Asbestos Assessment Report91
10/05/2026M01247347-P3Open ↗
09/10/2026M01438100-P1Open ↗
09/05/2026M00191881-I1Open ↗
Showing 3 of 91 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)57
11/11/2020140950898Open ↗
10/19/2020140960725Open ↗
10/16/2020123909477Open ↗
Showing 3 of 57 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance56
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS31
04/17/2020122889981Open ↗
04/06/2020122889963Open ↗
Showing 2 of 31 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISNYCECC EXEMPTION4
11/11/2020140950898Open ↗
10/19/2020140960725Open ↗
09/25/2020140956491Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports42
▸BISTECHNICAL REPORT: RESPONSIBILITY21
04/25/2024123841245Open ↗
05/10/2021140950898Open ↗
05/10/2021140950898Open ↗
Showing 3 of 21 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
04/25/2024122889963Open ↗
04/25/2024122889963Open ↗
04/25/2024140949455Open ↗
Showing 3 of 4 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs307
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST145
07/24/2025122162328Open ↗
07/24/2025140956491Open ↗
07/24/2025123841245Open ↗
Showing 3 of 145 on file for this type
▸BISLANDMARKS APPROVAL62
11/11/2020140950898Open ↗
10/19/2020140960725Open ↗
09/25/2020140956491Open ↗
Showing 3 of 62 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION33
06/10/2025140956491Open ↗
04/12/2024121185270Open ↗
02/26/2024122909460Open ↗
Showing 3 of 33 on file for this type
▸BISADMINISTRATIVE OBJECTIONS27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
01/25/2024122909460Open ↗
02/01/2023123684085Open ↗
03/15/2022121185270Open ↗
Showing 3 of 13 on file for this type
▸BISLANDMARKS SIGNOFF12
07/24/2025123841245Open ↗
06/14/2024123388235Open ↗
06/14/2024123684085Open ↗
Showing 3 of 12 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION9
02/03/2021140950898Open ↗
02/03/2021140950898Open ↗
Showing 2 of 9 on file for this type
▸BISFINAL3
04/25/2024140949455Open ↗
04/25/2024123841245Open ↗
02/25/2021140960725Open ↗
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership212
▸BISCOST AFFIDAVIT200
03/26/2021123909477Open ↗
03/26/2021123909477Open ↗
11/11/2020140950898Open ↗
Showing 3 of 200 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW310
05/21/2024123498633Open ↗
05/21/2024123391711Open ↗
05/21/2024123391702Open ↗
Showing 3 of 10 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms330
▸BISBOROUGH INTAKE FORM126
05/13/2020122889963Open ↗
05/11/2020123909477Open ↗
05/06/2020122162328Open ↗
Showing 3 of 126 on file for this type
▸BISEFILING COVER SHEET117
05/11/2020123909477Open ↗
Showing 1 of 117 on file for this type
▸BISADDITIONAL INFORMATION78
02/21/2025122909460Open ↗
03/09/2023123684085Open ↗
03/01/2021140960725Open ↗
Showing 3 of 78 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
11/11/2020140950898Open ↗
10/19/2020140960725Open ↗
09/25/2020140956491Open ↗
Showing 3 of 9 on file for this type
▸Other Documents76
▸DOB NOWProof of Historic Building50
09/03/2026M00634548-I1Open ↗
09/03/2026M00634502-I1Open ↗
08/31/2026M00811028-I1Open ↗
Showing 3 of 50 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION19
11/02/2020123909477Open ↗
04/06/2020122889963Open ↗
Showing 2 of 19 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProperty Ownership Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type