1910Year Built
4Stories
C3Building Class
R6Zoning
3,465 sfGross Floor Area
4Units
12 Active Violations ▸FDNY Report ↗
Four families · Owner of record: White on White NY · 1,333 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing fixture installation18p · 2 filings · 20 docs
BulkheadCellar and third floor gas boiler installation6p · 3 filings · 20 docs
Floor 5Plumbing fixture installation17p · 2 filings · 20 docs
Floor 4Plumbing fixture installation16p · 2 filings · 20 docs
Floor 3Cellar and third floor gas boiler installation20p · 3 filings · 20 docs
Floor 2Plumbing fixture installation15p · 2 filings · 20 docs
Floor 1Plumbing fixture installation22p · 3 filings · 20 docs
CellarCellar and third floor gas boiler installation21p · 3 filings · 20 docs
Site & exteriorInstallation of temporary pipe scaffold25p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
201 Foster Holdings3007/08/2026
6977 South 8th Street1103/21/2026
David Weiss503/21/2026
Smart Consulting NY404/09/2026
YML Realty303/21/2026
69 South 8th203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Levin Engineering1003/21/2026
XYZ Code Consulting103/21/2026
Sierra Safety203/21/2026
Mister Expediter403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & J IndustrialFire Protection407/08/2026
Creative Plumbing inPlumbing307/08/2026
New American ConstructionScaffold207/08/2026
Reliable EnterprisesScaffold207/08/2026
Alef ConstructionScaffold104/09/2026
Plumbing P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM Engineering Services8449702/12/2025
IP Concrete Testing and I6252109/19/2024
Building Lifecycle
All (151)Filed (14)Permit Issued (13)Signed Off (6)Violation (55)Inspection (9)Objection (24)Special Inspection (30)
08/26/2026
Violation issued (ECB, open)
Construction
08/25/2026
Violation issued (ECB, open)
Construction
08/25/2026
Violation issued (ECB, open)
Construction
08/21/2026
Violation issued (ECB, open)
Construction
08/21/2026
Violation issued (ECB, open)
Construction
08/21/2026
Violation issued (ECB, open)
Unknown
08/21/2026
Violation issued (ECB, open)
Construction
08/21/2026
Violation issued (ECB, open)
Construction
08/21/2026
Violation issued (ECB, open)
Construction
08/19/2026
Violation issued (ECB, open)
Construction
08/12/2026
Violation issued (ECB, open)
Construction
05/11/2026
Violation issued (HPD, open)
A
06/04/2025
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #321011418. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00660165-I1
04/24/2025
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM IN CONJUNCTION WITH NEW BUILIDING APPLICATION # 321011418. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00798042-I1
04/23/2025
Signed off — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR BOILER WORK TYPE, PROPOSED GAS BOILER EQUIPMENT INSIDE THEPROPOSED BOILER ROOMS ON CELLAR AND ROOF.
B01145036-I1
02/24/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
02/20/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
02/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
02/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
02/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
02/14/2025
Special inspection requirement — Heating Systems
MOHAMED MAHMOUD
02/12/2025
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR BOILER WORK TYPE, PROPOSED GAS BOILER EQUIPMENT INSIDE THEPROPOSED BOILER ROOMS ON CELLAR AND ROOF.
B01145036-P2
02/12/2025
Special inspection requirement — Heating Systems
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
02/10/2025
Objection raised — Scope
02/10/2025
Objection resolved — Addressed
02/04/2025
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR BOILER WORK TYPE, PROPOSED GAS BOILER EQUIPMENT INSIDE THEPROPOSED BOILER ROOMS ON CELLAR AND ROOF.
B01145036-P1
01/27/2025
Permit issued — Boiler Equipment
B01145036-I1-BE
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
12/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
12/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
12/20/2024
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
12/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
12/20/2024
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
12/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
12/11/2024
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #321011418. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00660165-P3
12/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
12/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
12/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
12/10/2024
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
11/20/2024
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR BOILER WORK TYPE, PROPOSED GAS BOILER EQUIPMENT INSIDE THEPROPOSED BOILER ROOMS ON CELLAR AND ROOF.
B01145036-I1
11/18/2024
Permit issued — Plumbing
B00660165-I1-PL
11/05/2024
Objection resolved — Resolved
11/05/2024
Objection resolved — Resolved
11/05/2024
Objection resolved — Resolved
11/05/2024
Objection resolved — Resolved
11/05/2024
Objection resolved — Resolved
10/29/2024
Objection raised — Other
10/29/2024
Objection raised — Scope
10/29/2024
Objection raised — Energy
10/29/2024
Objection raised — Admin
10/29/2024
Objection raised — Scope
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offPlumbing P & H01/27/2025
DOB NOWPlumbingSigned-offAB Plumbing11/18/2024
DOB NOWStandpipeSigned-offS & J Industrial09/30/2024
DOB NOWSprinklersSigned-offS & J Industrial09/30/2024
DOB NOWSupported ScaffoldSigned-offReliable Enterprises12/04/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises10/27/2023
DOB NOWPlumbingSigned-offAB Plumbing10/16/2023
DOB NOWSupported ScaffoldSigned-offAlef Construction06/23/2023
DOB NOWSidewalk ShedSigned-offNew American Construction03/01/2023
DOB NOWStandpipeSigned-offS & J Industrial01/12/2023
DOB NOWSprinklersSigned-offS & J Industrial01/10/2023
DOB NOWPlumbingSigned-offAB Plumbing01/10/2023
DOB NOWSidewalk ShedSigned-offNew American Construction02/28/2022
BIS—ISSUEDAlef Construction08/09/2024
BISEQISSUEDAlef Construction01/21/2024
BIS—ISSUEDAlef Construction08/17/2023
BIS—ISSUEDAlef Construction06/19/2023
BISEQISSUEDAlef Construction12/21/2022
BIS—ISSUEDAlef Construction07/19/2022
BISEQISSUEDAlef Construction12/14/2021
BIS—ISSUEDAlef Construction10/06/2021
BISOTISSUEDAlef Construction02/17/2021
BISEQISSUEDAlef Construction12/10/2020
BIS—ISSUEDAlef Construction11/23/2020
BIS—ISSUEDAlef Construction10/08/2020
BISEQISSUEDAlef Construction12/12/2019
BIS—ISSUEDRichmond Construction12/04/2018
BISEQISSUEDAlef Construction09/12/2018
BIS—ISSUEDRichmond Construction09/12/2018
BIS—ISSUEDAlef Construction11/16/2017
BIS—ISSUEDAlef Construction03/20/2017
BISEQISSUEDAlef Construction03/17/2017
BIS—ISSUEDY&S Framer's06/15/2015
BISEQISSUEDY&S Framer's06/15/2015
4 projects · most recent 03/12/2025
General Wiring
FiledStatusContractorScope
03/12/2025CompleteLens Electric10 meters, 10 new_meters
03/12/2025CompleteLens ElectricGeneral Wiring
03/23/2023CompletePower Direct Electric—
02/25/2022CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/24/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
02/20/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/15/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/08/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/25/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/12/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/22/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
02/14/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
02/14/2025HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
02/14/2025HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
02/14/2025HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
02/14/2025Heating SystemsMOHAMED MAHMOUDspecial
02/12/2025Heating SystemsMOHAMED MAHMOUDspecial
02/12/2025HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
02/12/2025HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
02/12/2025HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
02/12/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/20/2024HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
12/20/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/20/2024HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
12/20/2024HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
12/20/2024Maintenance informationMOHAMED MAHMOUDenergy_progress
12/20/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/20/2024HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
12/20/2024HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
12/20/2024Maintenance informationMOHAMED MAHMOUDenergy_progress
12/20/2024HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
12/10/2024HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
12/10/2024HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
12/10/2024HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
12/10/2024Maintenance informationMOHAMED MAHMOUDenergy_progress
12/10/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
Latest 25 of 35.
▾Documents — 350 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/31/2026B00655519-I1Request digital key ↗
08/31/2026B00686387-P1Request digital key ↗
08/31/2026B00686387-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits63
▸BISPLAN / WORK APPROVAL APPLICATION41
11/07/2025321011418Open ↗
09/22/2025321011418Open ↗
09/16/2025321011418Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION19
08/12/2024321011418Open ↗
07/17/2024321011418Open ↗
07/12/2024321011418Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
11/03/2025321011418Open ↗
05/09/2023322160095Open ↗
▸BISZONING DIAGRAM2
02/24/2022321011418Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/31/2026B00686387-I1Open ↗
08/31/2026B00686387-P1Open ↗
08/28/2026B00660165-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/27/2026B00660165-P2Open ↗
09/27/2026B00660165-P2Open ↗
09/27/2026B00660165-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
04/29/2022321011418Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/27/2026B00660165-P2Open ↗
09/23/2026B01145036-I1Open ↗
09/01/2026B01145036-P2Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment12
▸BISSTANDPIPE SYSTEMS2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER SYSTEMS2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISHEATING SYSTEMS2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST6
11/17/2025321011418Open ↗
11/17/2025321011418Open ↗
10/16/2025321011418Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE SIGNOFF2
05/01/2025321130236Open ↗
05/01/2025321011418Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸Energy Compliance44
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
07/03/2025321011418Open ↗
07/03/2025321011418Open ↗
07/03/2025321011418Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
04/29/2022321011418Open ↗
Showing 1 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BIS* HVAC INSULATION AND SEALING2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISFENESTRATION AREAS2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISAIR SEALING AND INSULATION - TESTING2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISEXTERIOR LIGHTING POWER2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISFENESTRATION AIR LEAKAGE2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISLIGHTING IN DWELLING UNITS2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISINTERIOR LIGHTING POWER2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISLIGHTING CONTROLS2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/28/2026B00660165-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/28/2026B00660165-I1Open ↗
▸Inspections & Test Reports39
▸BISTECHNICAL REPORT: RESPONSIBILITY12
07/03/2025321011418Open ↗
07/03/2025321011418Open ↗
07/03/2025321011418Open ↗
Showing 3 of 12 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING3
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
06/04/2025321011418Open ↗
05/15/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/04/2025321011418Open ↗
Showing 1 of 2 on file for this type
▸BIS* EXIT SIGNS2
06/17/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
06/04/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISMASONRY2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
10/16/2025321011418Open ↗
Showing 1 of 2 on file for this type
▸BISMECHANICAL SYSTEMS2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
06/10/2025321011418Open ↗
05/15/2025321011418Open ↗
▸Approvals, Objections & Sign-offs24
▸BISSCHEDULE A - OCCUPANCY / USE13
11/07/2025321011418Open ↗
09/16/2025321011418Open ↗
09/08/2025321011418Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/23/2024321011418Open ↗
05/15/2023322160095Open ↗
05/09/2023322160095Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
08/06/2022321011418Open ↗
08/06/2022321011418Open ↗
Showing 2 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership13
▸BISPROJECT-SPECIFIC GL INSURANCE6
08/12/2024321011418Open ↗
08/06/2022321011418Open ↗
Showing 2 of 6 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
08/12/2024321011418Open ↗
Showing 1 of 5 on file for this type
▸BISCOST AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms31
▸BISADDITIONAL INFORMATION24
09/29/2025321011418Open ↗
09/29/2025321011418Open ↗
05/27/2025321011418Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING COVER SHEET7
05/05/2023322160095Open ↗
Showing 1 of 7 on file for this type
▸Other Documents16
▸BISUNDERPINNING (2014)3
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISPLOT DIAGRAM3
11/06/2025321011418Open ↗
10/03/2025321011418Open ↗
Showing 2 of 3 on file for this type
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISVESTIBULES2
06/04/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISMAINTENANCE INFORMATION2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗
▸BISPERMANENT CERTIFICATE2
06/06/2025321011418Open ↗
05/15/2025321011418Open ↗