Floor 34Under Construction32p · 7 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing HVAC System: Install new ductwork. Connect to existing toilet exhaust ductwork and installation of a new toilet exhaust fan inline with existing ductwork on the 4th & 34th Floors as per plans (Morgan Stanley ADA Restroom.)
On file for this project
12 documents
Install new plumbing fixtures: (1) FD, (1) WC, (1) lavatory and (1) Janitor Sink on the 4th Floor and (1) FD, (1) WC, (1) lavatory on the 34th Floor and associated CW/sanitary piping on both as per plans (Morgan Stanley - ADA/ Gender Neutral Restroom.)
On file for this project
7 documents
Modifications to the existing Sprinkler System: Relocate (1) head and install (1) new head on the 4th Floor; Relocate (3) heads and install (1) new on the 34th Floor as per plans (Morgan Stanley - ADA Restroom.) No change to use, egress or occupancy.
On file for this project
8 documents
Latest 3 of 7 filings on this floor.
Floor 3316p · 3 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Remove (1) head, (2) new heads and (13) relocated on 29; Remove (1) head, (2) new and (9) relocated on 31; Remove (4), (3) new and (11) relocated on 32; Rem(4) head , (2) new and (8) relocated on 33; Rem (1), (5) new and (9) relocated on 34 as per plans.
On file for this project
8 documents · 1 drawing sheet
Removal of one (1) Drinking Fountain and associated piping on 29, 31-34th Floors each; Install one (1) new drinking fountain and associated piping each on floors 29, 31-34 as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC System: Installation of new AC Unit and associated ductwork and piping on the 29, 31-34th Floors as per plans (Morgan Stanley - RISK Floors.) No change to use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Floor 3215p · 2 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Remove (1) head, (2) new heads and (13) relocated on 29; Remove (1) head, (2) new and (9) relocated on 31; Remove (4), (3) new and (11) relocated on 32; Rem(4) head , (2) new and (8) relocated on 33; Rem (1), (5) new and (9) relocated on 34 as per plans.
On file for this project
8 documents · 2 drawing sheets
Modifications to the existing HVAC System: Installation of new AC Unit and associated ductwork and piping on the 29, 31-34th Floors as per plans (Morgan Stanley - RISK Floors.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Floor 3114p · 2 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Remove (1) head, (2) new heads and (13) relocated on 29; Remove (1) head, (2) new and (9) relocated on 31; Remove (4), (3) new and (11) relocated on 32; Rem(4) head , (2) new and (8) relocated on 33; Rem (1), (5) new and (9) relocated on 34 as per plans.
On file for this project
8 documents · 2 drawing sheets
Modifications to the existing HVAC System: Installation of new AC Unit and associated ductwork and piping on the 29, 31-34th Floors as per plans (Morgan Stanley - RISK Floors.) No change to use, egress or occupancy.
On file for this project
13 documents
Floor 303p · 1 filing · 8 docs
Fire Protection
Issued Permit Scope
Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents
Floor 2913p · 2 filings · 20 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Remove (1) head, (2) new heads and (13) relocated on 29; Remove (1) head, (2) new and (9) relocated on 31; Remove (4), (3) new and (11) relocated on 32; Rem(4) head , (2) new and (8) relocated on 33; Rem (1), (5) new and (9) relocated on 34 as per plans.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC System: Installation of new AC Unit and associated ductwork and piping on the 29, 31-34th Floors as per plans (Morgan Stanley - RISK Floors.) No change to use, egress or occupancy.
On file for this project
13 documents
Floor 2813p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Install new plumbing fixtures: (3) sinks, (1) hot water heater, (1) funnel drain and associated CW/sanitary piping on the 28th Floor as per plans (Bath & Body Works.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 28th Floor as per plans (Bath & Body Works) No change to use, egress or occupancy.
On file for this project
5 documents
Modifications to the existing HVAC System: Installation of new AC units and redistribution/install new ductwork and accessories on the 28th Floor as per plans (Bath & Body Works.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 275p · 3 filings · 11 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Sprinklers
General sprinkler changes on the 27th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
5 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 2610p · 8 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Install NEW: (1) sink, (2) drinking fountains, (1) DW, (1) chiller w/ ice, (2) FD, (2) HWHs and associated CW/san piping; REPLACE: (5) WCs, (5) lavs, (2) urinals and associated CW/sanitary piping on the 26th Flr as per plans (Shinhan Bank Renovations.)
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Remove (10) existing sprinkler head and Install (109) new sprinkler heads and associated piping on the 26th Floor as per plans (Shinhan Bank.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 26th Floor as per plans (Shinhan Bank Renovations.) No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 256p · 4 filings · 16 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Remove existing interior stairs, and install structural steel, new metal deck, concrete and infill stairs between the 25-26th Floors (CO)/ 26-27th Floors (Marketing) as per plans (Shinhan Bank - Renovations.) No change to use, egress or occupancy.
On file for this project
3 documents
General sprinkler changes taking place on the 25th and 26th floors as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 24
Floor 23
Floor 22
Floor 21
Floor 2016p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Install new plumbing fixtures: (2) hot water heaters, (2) sinks, (2) drinking fountains, (1) FD and associated Vent, Sanitary Piping and CW/HW drops and leak detectors as per plans. No change to use, egress or occupancy
On file for this project
7 documents · 3 drawing sheets
Modifications to the existing Sprinkler System; Remove (101) existing sprinkler heads and associated piping, Install ninety-nine (99) new sprinkler heads and associated Sprinkler piping as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Minor interior demolition. Installation of new interior partitions, new doors & frames, acoustical ceilings, gypsum board ceilings, wall finishes, floor finishes and window treatments as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
6 documents · 6 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 19Under Construction24p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalOther
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Additions/ Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Interior renovation of existing office, includes new non load bearing partitions, finishes, lighting, electrical
On file for this project
5 documents · 1 drawing sheet
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
On file for this project
7 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 18Under Construction30p · 5 filings · 20 docs
ArchitectureFire AlarmFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Additions/ Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents · 2 drawing sheets
Interior renovation of existing office, includes new non load bearing partitions, finishes, lighting, electrical
On file for this project
5 documents
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
On file for this project
7 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 176p · 4 filings · 18 docs
ArchitectureFire ProtectionGeneralPlumbing
Issued Permit Scope
Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents
Modifications to the Sprinkler System: Relocation of seventeen (17) sprinkler heads and associated piping on the 17th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Installation of new plumbing fixtures: (1) ice maker, (1) water filter, (1) floor drain and associated CW/sanitary piping on the 17th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1611p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Modifications to the existing HVAC System: Removal & cap if duct taps and diffusers; Rebalance VAV, relocate existing diffusers and VAV's on the 16th Floor as per plans (Morgan Stanley - Temp Clinic.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Minor interior demolition; Installation of new interior partitions, doors, flooring and finishes on the 16th Floor as per plans (Morgan Stanley Temp Clinic.) No change to use, egress or occupancy.
On file for this project
6 documents · 4 drawing sheets
Remove (1) existing drinking fountain and associated water/waste/vent piping and Install (1) new drinking fountain and new water/waste/vent piping on the 16th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 1518p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC System: Reconfiguration of HVAC ductwork on the 15th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing Sprinkler System: Relocate (133) existing heads, Remove (7) existing sprinkler heads and install (6) new sprinkler heads and associated piping as per plans (Tenant Work - Morgan Stanley.) No change to use, egress or occupancy
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1415p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Removal of plumbing fixtures on the 9 & 14th Floors; Install (1) new drinking fountain on the 9th Floor and (1) HWH, (1) sink, (1) DF and associated CS/sanitary piping on the 14th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 9th & 14th Floors as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
6 documents · 5 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 13
Floor 126p · 3 filings · 15 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Remove (1) drinking fountain & Install (1) new DF and associated piping on the 11th Floor; Remove (1) DF, Install (1) new DF, (1) sink and (1) hot water heater and associated CW/sanitary piping on the 12th Floor as per plans (Morgan Stanley.)
On file for this project
4 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings flooring and finishes on the 11-12th Floors as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 112p · 2 filings · 8 docs
Mechanical
Remove (1) drinking fountain & Install (1) new DF and associated piping on the 11th Floor; Remove (1) DF, Install (1) new DF, (1) sink and (1) hot water heater and associated CW/sanitary piping on the 12th Floor as per plans (Morgan Stanley.)
On file for this project
4 documents · 1 drawing sheet
Relocate (18) sprinkler heads, install (2) new sprinkler heads and associated piping on the 11th Floor; Relocate (11) heads, Remove (4) heads and install (1) new head and associated sprinkler piping on the 12th Floor as per plans (Morgan Stanley.)
On file for this project
4 documents · 1 drawing sheet
Floor 1039p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents
Remove: (4) FDs, (1) sink and (1) WD; Install NEW: (2) UR, (6) WC's, (6) Lav, (2) HWH, (4) FD's, (1) IM, (1) Chiller, (1) Sink, (1) DF, (1) sanitary system related sump pump & associated CW/sanitary piping on the 10th Floor as per plans (Morgan Stanley.)
On file for this project
6 documents · 2 drawing sheets
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 10th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 911p · 4 filings · 20 docs
ArchitectureDMFire ProtectionPlumbing
Issued Permit Scope
Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents
Removal of plumbing fixtures on the 9 & 14th Floors; Install (1) new drinking fountain on the 9th Floor and (1) HWH, (1) sink, (1) DF and associated CS/sanitary piping on the 14th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 9th & 14th Floors as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 811p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents
Relocate (5) existing sprinkler heads and install (4) new sprinkler heads on the 7th Floor; Relocate (2) head and Install (1) new head and associated sprinkler piping on the 8th Floor per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Installation of (1) Drinking Fountain on the 7th and 8th Floors each and associated CW/sanitary piping as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 710p · 4 filings · 20 docs
ArchitectureDMFire ProtectionPlumbing
Issued Permit Scope
Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents
Relocate (5) existing sprinkler heads and install (4) new sprinkler heads on the 7th Floor; Relocate (2) head and Install (1) new head and associated sprinkler piping on the 8th Floor per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Installation of (1) Drinking Fountain on the 7th and 8th Floors each and associated CW/sanitary piping as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 627p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents
Modifications to the existing sprinkler system: Relocate (4) existing sprinkler heads and install (4) new heads and associated sprinkler piping on the 6th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC System: redistribution of ductwork for new layout on the 6th Floor as per plans (Morgan Stanley.) No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 53p · 1 filing · 8 docs
Fire Protection
Issued Permit Scope
Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents
Floor 4Under Construction26p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the existing HVAC System: Install new ductwork. Connect to existing toilet exhaust ductwork and installation of a new toilet exhaust fan inline with existing ductwork on the 4th & 34th Floors as per plans (Morgan Stanley ADA Restroom.)
On file for this project
12 documents
Install new plumbing fixtures: (1) FD, (1) WC, (1) lavatory and (1) Janitor Sink on the 4th Floor and (1) FD, (1) WC, (1) lavatory on the 34th Floor and associated CW/sanitary piping on both as per plans (Morgan Stanley - ADA/ Gender Neutral Restroom.)
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Relocate (1) head and install (1) new head on the 4th Floor; Relocate (3) heads and install (1) new on the 34th Floor as per plans (Morgan Stanley - ADA Restroom.) No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 36p · 2 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents
Modification to mechanical systems as per plans filed herewith. No change in use, occupancy or egress.
On file for this project
23 documents · 3 drawing sheets
Floor 2
Floor 112p · 2 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
INTERIOR RENOVATION FOR EXISTING STORE AT PARTIAL 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents · 3 drawing sheets
APPLICATION FILED FOR INTERIOR REMOVAL AND NEW FITOUT IN TENANT SPACE, INCLUDING PARTITIONS, CEILING, FINISHES, AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
20 documents · 3 drawing sheets
Cellar13p · 2 filings · 20 docs
ArchitectureCivilDMGeneralMechanicalPlumbingStructural
APPLICATION FILED FOR RELOCATION AND INSTALLATION OF PLUMBING FIXTURES (GAS & DOMESTIC) AND SPRINKLER HEADS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
APPLICATION FILED FOR INTERIOR REMOVAL AND NEW FITOUT IN TENANT SPACE, INCLUDING PARTITIONS, CEILING, FINISHES, AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
20 documents · 11 drawing sheets
Sub-Cellar6p · 3 filings · 20 docs
DMFire ProtectionMechanical
Issued Permit Scope
Sprinklers
Sprinkler changes as per plans filed herewith (additional heads added to provide proper coverage to reach standards set by Local Law 26). No change in use, egress or occupancy.
On file for this project
8 documents
Modification to sprinkler systems as per plans filed herewith. No change in use, occupancy or egress.
On file for this project
3 documents · 2 drawing sheets
Modification to mechanical systems as per plans filed herewith. No change in use, occupancy or egress.
On file for this project
23 documents · 1 drawing sheet