← Back
BuildNYC
Over six families without stores
750 KELLY STREET
BRONX · BIN 2005564
💬 Discuss this project
1899Year Built
2Stories
C1Building Class
R7-1Zoning
3,520 sfGross Floor Area
9Units
Rent Stabilized40 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 750 Kelly Holdings · 2,500 sf lot · 1.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed ROVE5p · 1 filing · 20 docs
Floor 2Proposed ROVE13p · 1 filing · 20 docs
Floor 1Proposed ROVE13p · 1 filing · 20 docs
CellarProposed ROVE13p · 1 filing · 20 docs
BasementProposed ROVE13p · 1 filing · 20 docs
Site & exteriorProposed ROVE5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bagad Realty2207/08/2026
750 Kelly Holdings103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2023$675K—MNYS 763 PROSPECT LLC → 750 KELLY HOLDINGS LLC$192/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adb Associates605/22/2024
Vasilios Artemiou PE205/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mabe GroupGeneral Contractor107/08/2026
Mabe Groupspecialty_contractor107/08/2026
Bruche Mechanical NYFire Protection107/08/2026
Plumbing P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616805/22/2024
Building Lifecycle
08/10/2026
§ 27-2033 ADM code provide ready access to buildings heating system door locked at boiler room
HPD violation · open
08/10/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIAL OUTLET WEST WALLS IN THE KITCHENETTE LOCATED AT APT 1C, 1st STORY, 1st…
HPD violation · open
08/10/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD violation · closed
08/10/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE OUTLET AT NORTH WALL (NO POWER) IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st…
HPD violation · open
08/10/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st…
HPD violation · open
135 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offBruche Mechanical NY02/27/2024
DOB NOWPlumbingSigned-offPlumbing P & H01/18/2024
DOB NOWGeneral ConstructionPermit IssuedAB Builders NY01/08/2024
DOB NOWMechanical SystemsSigned-offAB Builders NY01/02/2024
1 project · most recent 05/22/2024
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
05/22/2024Permit IssuedMabe GroupAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 05/22/2024
Sprinkler System
FiledStatusContractorScope
05/22/2024Signed-offPlumbing P & HSprinkler System
1 project · most recent 05/22/2024
Water/Sanitary
FiledStatusContractorScope
05/22/2024Signed-offBruche Mechanical NYWater/Sanitary
2 projects · most recent 07/23/2024
General Wiring
FiledStatusContractorScope
07/23/2024CompleteS&R ElectricalGeneral Wiring
02/01/2024CompleteS&R Electrical—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/31/2024Pass-Final PL - UndergroundPassView ↗
05/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/12/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
05/29/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/29/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/29/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/29/2024Maintenance informationFAHAD FATEHenergy_progress
05/29/2024Permanent certificateFAHAD FATEHenergy_progress
05/29/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/29/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
05/21/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/21/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/21/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
05/21/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/21/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/21/2024Maintenance informationFAHAD FATEHenergy_progress
05/21/2024Permanent certificateFAHAD FATEHenergy_progress
05/06/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
05/06/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/06/2024Permanent certificateFAHAD FATEHenergy_progress
05/06/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/06/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/06/2024Maintenance informationFAHAD FATEHenergy_progress
05/06/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/06/2024Post-installed AnchorsFAHAD FATEHspecial
05/06/2024Sprinkler SystemsFAHAD FATEHspecial
05/06/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/17/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
Latest 25 of 46.
48 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account