← Back
Elevator apt, miscellaneous
744 ROCKAWAY AVENUE
BROOKLYN · BIN 3390451
💬 Discuss this project
2005Year Built
5Stories
D9Building Class
R6Zoning
36,135 sfGross Floor Area
61Units
LL97 CoveredRent Stabilized29 Open Violations 28 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, miscellaneous · Owner of record: HIRE-DONA ROSITA II HOU DEV FUND · 12,450 sf lot · 2.9 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof4p · 2 filings · 20 docs
Cellar4p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COMUNILIFE4108/29/2026
HIRE-DONA ROSITA II HOU DEV FUND603/22/2026
STUART ISER, INC103/22/2026
METRO CONTRACTING NY303/21/2026
HIRE-DONA ROSITA II HDFC803/21/2026
HIRE-DONA ROSITA 11 HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC208/20/2026
CITYSCAPE ENGINEERING208/05/2026
PURPOSE BY DESIGN ARCHITECTS PLLC103/24/2026
BENDIX ENGINEERING, P.C.1010/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITION NYC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NAT'L MECH. SVCS PLBG LLCPlumbing807/08/2026
STUART ISER, INCFire Protection503/21/2026
THE METRO GROUP, INCGeneral Contractor303/21/2026
ROBERT COVELLOElectrical103/21/2026
SANKAR SHILElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BENDIX ENGINEERING, P.C.4293810/28/2021
Building Lifecycle
All (7)Permit Issued (7)
11/01/2021
Permit issued — Boiler Equipment
B00402912-S1-BE
06/29/2021
Permit issued — Boiler Equipment
B00402912-I1-BE
06/21/2021
Permit issued — Plumbing
B00402849-I1-PL
02/05/2021
Permit issued — Boiler Equipment
B00402912-I1-BE
02/02/2021
Permit issued — Mechanical Systems
B00403670-I1-MS
01/28/2021
Permit issued — Plumbing
B64704409-I1-PL
01/28/2021
Permit issued — Plumbing
B00402849-I1-PL
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC11/01/2021
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC06/29/2021
DOB NOWPlumbingSigned-offNAT'L MECH. SVCS PLBG LLC06/21/2021
DOB NOWBoiler EquipmentSigned-offNAT'L MECH. SVCS PLBG LLC02/05/2021
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC02/02/2021
DOB NOWPlumbingPermit IssuedNAT'L MECH. SVCS PLBG LLC01/28/2021
DOB NOWPlumbingSigned-offNAT'L MECH. SVCS PLBG LLC01/28/2021
BISEQISSUEDMETRO CONTRACTING NY, INC.10/14/2016
BISOTISSUEDTWO BROTHERS CONSTRUCTION01/03/2011
BISEQISSUEDROCK SCAFFOLDING CORP12/20/2010
BISFPISSUEDFIRE COMMAND CO, INC.10/10/2007
BISSPISSUEDRO-SAL PLBG HTG INC07/26/2006
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/20/2006
BISEQISSUEDGALAXY GEN CONTRACTING03/22/2006
BIS—ISSUEDGALAXY GEN CONTRACTING03/22/2006
BISEQISSUEDGALAXY GEN CONTRACTING01/06/2006
BISEQISSUEDMANSONARY SVCS INC11/04/2005
BISSDISSUEDRO-SAL PLBG HTG INC07/06/2005
BISEQISSUEDMANSONARY SVCS INC06/21/2005
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.06/15/2005
BISEQISSUEDGALAXY GEN CONTRACTING04/13/2005
BIS—ISSUEDGALAXY GEN CONTRACTING04/13/2005
BISEQISSUEDROCKLEDGE SCAFFOLD CORP04/11/2005
1 project · most recent 08/20/2026
FiledStatusContractorScope
08/20/2026——12 heads
1 project · most recent 06/24/2021
Gas Water/Sanitary
FiledStatusContractorScope
06/24/2021Signed-offNAT'L MECH. SVCS PLBG LLCGas, Water/Sanitary
1 project · most recent 01/29/2021
Boiler Controls
FiledStatusContractorScope
01/29/2021CompleteRESPONSE ELECTRIC INC.Boiler Controls
1 project · most recent 08/20/2026
Steel
FiledStatusContractorScope
08/20/2026——Steel
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/04/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
08/07/2026Tenant Protection Plan Compliance—special
08/07/2026Sprinkler Systems—special
08/07/2026Post-installed Anchors—special
07/01/2026Post-installed Anchors—special
07/01/2026Preliminary—progress
07/01/2026Tenant Protection Plan Compliance—special
07/01/2026Helical Piles Foundation (BB # 2014-020)—special
07/01/2026Concrete - Cast-In-Place—special
07/01/2026Subgrade Inspections—special
07/01/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/01/2026Subsurface Investigations (Borings/Test Pits)—special
07/01/2026Structural Stability – Alterations of existing buildings—special
06/30/2026Final—progress
06/30/2026Footing and Foundation—progress
03/24/2026HVAC-R and service water piping design and insulation—energy_progress
03/24/2026Duct leakage testing, insulation and design—energy_progress
03/24/2026HVAC-R and service water heating equipment—energy_progress
03/24/2026Shutoff dampers—energy_progress
03/24/2026Maintenance information—energy_progress
03/24/2026HVAC-R and service water heating system controls—energy_progress
03/24/2026Tenant Protection Plan Compliance—special
03/24/2026Heating Systems—special
03/24/2026Exhaust and Vent Systems in Plenums and Ducts—special
03/24/2026Chimneys and vents—special
03/24/2026Fire-Resistant Penetrations and Joints—special
Latest 25 of 66.
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch6
09/02/2026B00402912-P7Request digital key ↗
09/02/2026B00402912-S1Request digital key ↗
08/17/2026B01331591-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/02/2026B00402912-P6Request digital key ↗
09/02/2026B00402912-I1Request digital key ↗
09/02/2026B00402912-P5Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00403670-I1Request digital key ↗
08/15/2026B00403670-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00402849-I1Request digital key ↗
08/15/2026B00402849-P1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION7
10/12/2016340431170Open ↗
12/21/2010320252908Open ↗
12/01/2010320244696Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
10/12/2016340431170Open ↗
01/04/2011320244696Open ↗
12/23/2010320252908Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications48
▸DOB NOWProgress Inspector Seal & Signature18
09/02/2026B00403670-I1Open ↗
09/02/2026B00403670-I1Open ↗
09/02/2026B00403670-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/22/2026B01331591-S5Open ↗
08/17/2026B01331591-I1Open ↗
08/17/2026B01331591-S1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
12/21/2010320252908Open ↗
12/01/2010320244696Open ↗
10/22/2008310213587Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00403670-I1Open ↗
09/01/2026B00402849-P1Open ↗
08/24/2026B00403670-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
10/17/2007310038232Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/12/2016340431170Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/21/2010320252908Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/12/2016340431170Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/21/2010320252908Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/12/2016340431170Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
10/02/2007310023774Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan8
08/13/2026B00402912-P5Open ↗
08/13/2026B00402849-P1Open ↗
08/13/2026B00402912-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
10/12/2016340431170Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
12/21/2010320252908Open ↗
12/01/2010320244696Open ↗
10/22/2008310213587Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/02/2007310023774Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00402912-S1Open ↗
08/13/2026B00402849-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00402912-I1Open ↗
08/13/2026B00402912-S1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/12/2016340431170Open ↗
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/22/2026B01331591-S5Open ↗
08/17/2026B01331591-S3Open ↗
08/17/2026B01331591-S1Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
12/21/2010320252908Open ↗
12/01/2010320244696Open ↗
10/17/2008310213587Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
12/01/2010320244696Open ↗
10/22/2008310213587Open ↗
10/10/2007310023774Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
12/21/2010320252908Open ↗
12/01/2010320244696Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/12/2016340431170Open ↗