← Back
BuildNYC
Primarily 2 family with 1 store or office
7505 3RD AVENUE
BROOKLYN · Bay Ridge · BIN 3148712
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6BZoning
4,100 sfGross Floor Area
3Units
2 Active Violations 3 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: Sunflower 219 · 2,000 sf lot · 2.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGeneral construction, mechanical, and structural work, 2nd, 10p · 1 filing · 12 docs
Floor 3New sprinkler system installation23p · 3 filings · 20 docs
Floor 2New sprinkler system installation16p · 3 filings · 20 docs
Floor 1New sprinkler system installation8p · 2 filings · 16 docs
CellarNew sprinkler system installation4p · 1 filing · 4 docs
Site & exteriorNew sprinkler system installation3p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Serve-U-Cleaners503/21/2026
Sunflower 219103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/22/2021$1.9M—— → —$451/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M Just Architecture310/26/2022
RLM Engineering210/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Just Architecture503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Deco HomeGeneral Contractor303/21/2026
Big Apple PlumbingPlumbing307/08/2026
Big Apple PlumbingFire Protection307/08/2026
Illuminations Unlmtd ElectricElectrical103/22/2026
Jurgen H. Wriedt ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hansen Engineering8174510/26/2022
Building Lifecycle
All (110)Filed (5)Permit Issued (7)Violation (9)Inspection (7)Objection (52)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/06/2023
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2023
Permit issued — Plumbing
B00686950-I1-EW-SP
07/14/2023
Permit issued — Sprinklers
B00686950-I1-EW-SP
07/14/2023
Permit issued — Plumbing
B00650195-I1-PL
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/23/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ryan Hansen
11/23/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Ryan Hansen
11/23/2022
Special inspection requirement — Fenestration air leakage
Ryan Hansen
11/23/2022
Special inspection requirement — Maintenance information
Ryan Hansen
11/23/2022
Special inspection requirement — Interior lighting power
Ryan Hansen
11/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
11/23/2022
Special inspection requirement — Permanent certificate
Ryan Hansen
11/23/2022
Special inspection requirement — Fenestration areas
Ryan Hansen
11/23/2022
Special inspection requirement — Insulation placement and R values
Ryan Hansen
11/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
11/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
11/23/2022
Special inspection requirement — Metering
Ryan Hansen
11/23/2022
Special inspection requirement — Air barrier - visual inspection
Ryan Hansen
11/23/2022
Special inspection requirement — Final
Ryan Hansen
11/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
11/23/2022
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
11/23/2022
Special inspection requirement — Structural Steel - Welding
Ryan Hansen
11/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
11/23/2022
Special inspection requirement — Structural Steel - Details
Ryan Hansen
11/23/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Ryan Hansen
11/23/2022
Special inspection requirement — Mechanical Systems
Ryan Hansen
11/18/2022
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
11/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
11/15/2022
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
11/15/2022
Special inspection requirement — Maintenance information
Ryan Hansen
11/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
11/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
11/10/2022
Objection raised — Other
11/10/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
11/01/2022
Objection raised — Other
11/01/2022
Objection raised — Other
10/26/2022
Filed — Alteration
General Construction Mechanical and structural work at 2nd,3rd floors and roof indicated on drawings filed herewith. No change in use Egress or Occupancy under this application
B00650167-P1
10/25/2022
Filed — Alteration
Plumbing work at 2nd & 3rd floors indicated on drawings filed herewith. No change in use egress or Occupancy under this application
B00650195-P1
10/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2022
Special inspection requirement — Permanent certificate
Ryan Hansen
10/25/2022
Special inspection requirement — Maintenance information
Ryan Hansen
10/25/2022
Special inspection requirement — Metering
Ryan Hansen
10/25/2022
Special inspection requirement — Air barrier - visual inspection
Ryan Hansen
08/03/2022
Permit issued — General Construction
B00650167-I1-GC
05/23/2022
Permit issued — Plumbing
B00650195-I1-PL
05/13/2022
Permit issued — Sprinklers
B00686950-I1-PL
05/13/2022
Permit issued — Plumbing
B00686950-I1-EW-SP
03/17/2022
Objection resolved — Addressed
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedBig Apple Plumbing07/15/2023
DOB NOWSprinklersPermit IssuedBig Apple Plumbing07/14/2023
DOB NOWPlumbingPermit IssuedBig Apple Plumbing07/14/2023
DOB NOWGeneral ConstructionPermit IssuedDeco Home08/03/2022
DOB NOWPlumbingPermit IssuedBig Apple Plumbing05/23/2022
DOB NOWPlumbingPermit IssuedBig Apple Plumbing05/13/2022
DOB NOWSprinklersPermit IssuedBig Apple Plumbing05/13/2022
BISBLISSUEDFulton Plumbing & Heating02/01/2007
BISBLISSUEDFulton Plumbing & Heating04/18/2005
BISOTISSUEDMetroplitan Loundry Machinery01/13/1999
BISMHISSUEDMetroplitan Loundry Machinery01/12/1999
1 project · most recent 10/26/2022
Air Conditioning Systems Heating Systems Others
FiledStatusContractorScopeMake / Model / Capacity
10/26/2022Permit IssuedDeco HomeAir Conditioning Systems, Heating Systems, Others
Cooling
Cooper & Hunter CH-24MSPHCT 24,000 BTU · Condensing Unit ×5
CH-24MSPHCT-230VI 24,000 BTU · Condensing Unit ×5
Heating
Cooper & Hunter CH-24MSPHCT-230VI 24,000 BTU · Condensing Unit ×5
1 project · most recent 03/10/2022
FiledStatusContractorScope
03/10/2022Permit IssuedBig Apple Plumbing—
2 projects · most recent 10/25/2022
Water/Sanitary Gas
FiledStatusContractorScope
10/25/2022Permit IssuedBig Apple PlumbingGas, Water/Sanitary
03/10/2022Permit IssuedBig Apple PlumbingWater/Sanitary
1 project · most recent 04/14/2022
FiledStatusContractorScope
04/14/2022Permit IssuedIlluminations Unlmtd Electric4 meters, 4 new_meters
1 project · most recent 10/26/2022
Steel Wood
FiledStatusContractorScope
10/26/2022Permit IssuedDeco HomeSteel, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
07/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
10/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
11/23/2022Structural Stability – Alterations of existing buildingsRyan Hansenspecial
11/23/2022Fenestration and door U-factor and product ratingsRyan Hansenenergy_progress
11/23/2022Fenestration air leakageRyan Hansenenergy_progress
11/23/2022Maintenance informationRyan Hansenenergy_progress
11/23/2022Interior lighting powerRyan Hansenenergy_progress
11/23/2022HVAC-R and service water heating system controlsRyan Hansenenergy_progress
11/23/2022Permanent certificateRyan Hansenenergy_progress
11/23/2022Fenestration areasRyan Hansenenergy_progress
11/23/2022Insulation placement and R valuesRyan Hansenenergy_progress
11/23/2022HVAC-R and service water heating equipmentRyan Hansenenergy_progress
11/23/2022HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
11/23/2022MeteringRyan Hansenenergy_progress
11/23/2022Air barrier - visual inspectionRyan Hansenenergy_progress
11/23/2022FinalRyan Hansenprogress
11/23/2022Fire-Resistance Rated ConstructionRyan Hansenprogress
11/23/2022Energy Code Compliance InspectionsRyan Hansenprogress
11/23/2022Structural Steel - WeldingRyan Hansenspecial
11/23/2022Fire-Resistant Penetrations and JointsRyan Hansenspecial
11/23/2022Structural Steel - DetailsRyan Hansenspecial
11/23/2022Structural Steel - High Strength BoltingRyan Hansenspecial
11/23/2022Mechanical SystemsRyan Hansenspecial
11/15/2022Fire-Resistant Penetrations and JointsRyan Hansenspecial
11/15/2022Energy Code Compliance InspectionsRyan Hansenprogress
11/15/2022Maintenance informationRyan Hansenenergy_progress
11/15/2022HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
Latest 25 of 54.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/15/2026B00650167-P1Request digital key ↗
08/15/2026B00686950-I1Request digital key ↗
08/14/2026B00650167-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature8
09/22/2026B00650167-P1Open ↗
09/22/2026B00650167-P1Open ↗
08/23/2026B00650167-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026B00686950-I1Open ↗
08/28/2026B00650167-I1Open ↗
08/28/2026B00650167-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/22/2026B00650167-P1Open ↗
08/26/2026B00686950-I1Open ↗
08/23/2026B00650167-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/15/2026B00650167-P1Open ↗
08/15/2026B00686950-I1Open ↗
08/14/2026B00650167-I1Open ↗
Showing 3 of 5 on file for this type