| Owner | Filings | Most Recent |
|---|---|---|
| BAY RIDGE PREPARATORY SCHOOL | 55 | 09/26/2026 |
| CELTIC SERVICES NYC INC | 5 | 03/22/2026 |
| CRISTINA MICHAELS CONSTRUCTION MANA | 3 | 03/22/2026 |
| BELFORD LONG ISLAND, LLC | 1 | 03/22/2026 |
| METRIC CONSULTING INSPECT | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| PACIFICO ENGINEERING PC | 1 | 08/21/2026 |
| OSPINO ENGINEERING PLLC | 1 | 01/12/2026 |
| LEONARD J. STRANDBERG & ASSOCAITES | 1 | 10/28/2025 |
| BENDIX ENGINEERING, P.C. | 7 | 09/24/2025 |
| ASHRAF CORP | 1 | 06/21/2025 |
| GEI CONSULTANTS, INC. | 3 | 06/18/2025 |
| CHANDLER PIERCE ARCHITECT | 6 | 12/13/2024 |
| EDWARD I MILLS & ASSOCIATES ARCHITE | 2 | 07/15/2024 |
| STUDIO HUJI | 1 | 05/09/2023 |
| AGE ENGINEERING, LLC | 1 | 06/23/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| Belfor Property Restoration | 1 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 38 | 03/21/2026 |
| ARCHI PRO GROUP | 1 | 03/21/2026 |
| KD DESIGNS | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| BELFOR LONG ISLAND LLC | General Contractor | 39 | 08/12/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 7 | 09/26/2026 |
| CELTIC SERVICES NYC INC | General Contractor | 3 | 03/21/2026 |
| CRISTINA MICHAELS CONST* | General Contractor | 3 | 03/21/2026 |
| J. CAIAZZO PLBG & HTG COR | Plumbing | 2 | 07/08/2026 |
| A & F FIRE PROTECTION CO | Fire Protection | 2 | 07/08/2026 |
| J. CAIAZZO PLBG & HTG CORP | Fire Protection | 2 | 07/08/2026 |
| ROOPCHAND SINGH | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| PACIFICO ENGINEERING PC | 3157 | 1 | 08/21/2026 |
| BENDIX ENGINEERING, P.C. | 4293 | 7 | 09/24/2025 |
| METRIC CONSULTING AND INS | 1803 | 5 | 06/18/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 09/25/2026 |
| DOB NOW | Support of Excavation | Permit Issued | BELFOR LONG ISLAND LLC | 08/11/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 07/01/2026 |
| DOB NOW | General Construction | Permit Issued | BELFOR LONG ISLAND LLC | 07/01/2026 |
| DOB NOW | General Construction | Permit Issued | BELFOR LONG ISLAND LLC | 07/01/2026 |
| DOB NOW | Standpipe | Permit Issued | A & F FIRE PROTECTION CO | 06/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | A & F FIRE PROTECTION CO | 06/17/2026 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 06/15/2026 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 04/01/2026 |
| DOB NOW | Plumbing | Permit Issued | J. CAIAZZO PLBG & HTG COR | 03/16/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | CRISTINA MICHAELS CONST* | 01/12/2026 |
| DOB NOW | Foundation | Permit Issued | BELFOR LONG ISLAND LLC | 10/28/2025 |
| DOB NOW | Foundation | Permit Issued | BELFOR LONG ISLAND LLC | 10/14/2025 |
| DOB NOW | General Construction | Permit Issued | BELFOR LONG ISLAND LLC | 10/07/2025 |
| DOB NOW | Support of Excavation | Permit Issued | BELFOR LONG ISLAND LLC | 08/08/2025 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 06/24/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 06/24/2025 |
| DOB NOW | General Construction | Permit Issued | BELFOR LONG ISLAND LLC | 07/18/2024 |
| DOB NOW | Construction Fence | Signed-off | BELFOR LONG ISLAND LLC | 07/02/2024 |
| DOB NOW | Structural | Signed-off | BELFOR LONG ISLAND LLC | 07/02/2024 |
| DOB NOW | Mechanical Systems | Signed-off | BELFOR LONG ISLAND LLC | 07/02/2024 |
| DOB NOW | Construction Fence | Signed-off | BELFOR LONG ISLAND LLC | 07/01/2024 |
| DOB NOW | General Construction | Signed-off | BELFOR LONG ISLAND LLC | 07/01/2024 |
| DOB NOW | Plumbing | Signed-off | ANTHONY CAIAZZO | 05/21/2024 |
| DOB NOW | Construction Fence | Signed-off | BELFOR LONG ISLAND LLC | 04/15/2024 |
| DOB NOW | General Construction | Signed-off | BELFOR LONG ISLAND LLC | 03/15/2024 |
| DOB NOW | Mechanical Systems | Signed-off | BELFOR LONG ISLAND LLC | 03/15/2024 |
| DOB NOW | Structural | Signed-off | BELFOR LONG ISLAND LLC | 03/15/2024 |
| DOB NOW | Plumbing | Signed-off | ANTHONY CAIAZZO | 05/11/2023 |
| DOB NOW | Sprinklers | Signed-off | J. CAIAZZO PLBG & HTG COR | 05/11/2023 |
| DOB NOW | Construction Fence | Signed-off | BELFOR LONG ISLAND LLC | 05/10/2023 |
| DOB NOW | Mechanical Systems | Signed-off | BELFOR LONG ISLAND LLC | 04/12/2023 |
| DOB NOW | General Construction | Signed-off | BELFOR LONG ISLAND LLC | 04/12/2023 |
| DOB NOW | Structural | Signed-off | BELFOR LONG ISLAND LLC | 04/12/2023 |
| DOB NOW | General Construction | Signed-off | CELTIC SERVICES NYC INC | 06/27/2022 |
| BIS | FP | ISSUED | MASTER FIRE SYSTEMS, INC | 03/03/2009 |
| BIS | SP | ISSUED | UNITED FIRE PROTECTION INC. | 09/07/2000 |
| BIS | MH | ISSUED | BARNEY SKANSKA CONST CO | 04/07/1999 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/12/2026 | Permit Issued | CRISTINA MICHAELS CONST* | Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PURY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×8 PURY-EP120TNU-A 135,000 BTU · Vrf Outdoor ×4 PURY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×4 MUZ-FS06NA-U1 8,700 BTU · Condensing Unit ×2 Rupp Air RARTU4-E.602-22-22T-ERV 4,870 CFM · Doas ×4 Ventilation Greenheck NA 9,720 CFM · Erv ×4 Ducts & Piping N/A NA 60,000 CFM · Ahu ×2 |
| 10/28/2025 | Permit Issued | BELFOR LONG ISLAND LLC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MXZ-SM36NAM2-U1 41,000 BTU · Condensing Unit ×1 MXZ-SM60NAM2-U1 66,000 BTU · Condensing Unit ×1 PURY-EP144TNU-A1 160,000 BTU · Vrf Outdoor ×1 Ventilation Greenheck SP-B80 50 CFM · Exhaust Fan ×5 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/12/2026 | Signed-off | J. CAIAZZO PLBG & HTG COR | Sprinkler System |
| 10/28/2025 | Permit Issued | A & F FIRE PROTECTION CO | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/12/2026 | Signed-off | J. CAIAZZO PLBG & HTG COR | Gas, Storm, Water/Sanitary |
| 10/28/2025 | Permit Issued | J. CAIAZZO PLBG & HTG COR | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | SCIENTIFIC ELEC. CO. INC | General Wiring |
| 08/11/2026 | Permit Issued | SCIENTIFIC ELEC. CO. INC | General Wiring |
| 12/18/2025 | Permit Issued | POWER CONNECT ELECTRIC CO | General Wiring |
| 09/25/2025 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| 01/04/2025 | Permit Issued | WILLDAN ELECTRICAL OF NY | General Wiring |
| 10/25/2023 | Complete | NYCOM ELECTRICAL CORP | — |
| 07/31/2023 | Permit Issued | SCIENTIFIC ELEC. CO. INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/12/2026 | Permit Issued | CRISTINA MICHAELS CONST* | Steel, Concrete, Masonry |
| 10/28/2025 | Permit Issued | BELFOR LONG ISLAND LLC | 2 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/12/2026 | Permit Issued | CRISTINA MICHAELS CONST* | Fence, Scaffold |
| 06/21/2025 | Permit Issued | ARSENAL SCAFFOLD INC | Fence, Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/27/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 06/26/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/12/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/16/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/07/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/02/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/26/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/26/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/23/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 03/09/2026 | Certified StandPipe - SD - Fire StandPipe - SD - Roughing | Certified | View ↗ |
| 02/19/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/18/2025 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 08/14/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 08/09/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/07/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/02/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/21/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/21/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/03/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 11/03/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/29/2023 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 09/29/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/04/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/17/2026 | Air barrier - visual inspection | Ralph Pacifico | energy_progress |
| 08/17/2026 | Fire-Resistant Penetrations and Joints | Ralph Pacifico | special |
| 08/17/2026 | Structural Stability – Alterations of existing buildings | Ralph Pacifico | special |
| 08/17/2026 | Energy Code Compliance Inspections | Ralph Pacifico | progress |
| 08/17/2026 | Final | Ralph Pacifico | progress |
| 09/23/2025 | Standpipe Systems | Matthew Bendix | special |
| 09/23/2025 | Fire-Resistant Penetrations and Joints | Matthew Bendix | special |
| 09/23/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 09/23/2025 | Sprinkler Systems | Matthew Bendix | special |
| 09/22/2025 | Duct leakage testing, insulation and design | Matthew Bendix | energy_progress |
| 09/22/2025 | HVAC-R and service water heating system controls | Matthew Bendix | energy_progress |
| 09/22/2025 | Energy Code Compliance Inspections | Matthew Bendix | progress |
| 09/22/2025 | HVAC-R and service water piping design and insulation | Matthew Bendix | energy_progress |
| 09/22/2025 | HVAC-R and service water heating equipment | Matthew Bendix | energy_progress |
| 09/22/2025 | Maintenance information | Matthew Bendix | energy_progress |
| 09/22/2025 | Shutoff dampers | Matthew Bendix | energy_progress |
| 09/18/2025 | Final | Matthew Bendix | progress |
| 09/18/2025 | Mechanical Systems | Matthew Bendix | special |
| 07/31/2025 | Structural Stability – Alterations of existing buildings | SAMI HAJJAR P.E | special |
| 07/31/2025 | Preliminary | SAMI HAJJAR P.E | progress |
| 07/31/2025 | Masonry | SAMI HAJJAR P.E | special |
| 07/31/2025 | Subsurface Conditions – Fill Placement & In-Place Density | SAMI HAJJAR P.E | special |
| 07/31/2025 | Subgrade Inspections | SAMI HAJJAR P.E | special |
| 06/17/2025 | Structural Steel - Welding | SAMI HAJJAR P.E | special |
| 06/17/2025 | Structural Steel - High Strength Bolting | SAMI HAJJAR P.E | special |