← Back
Parsonage, rectory
7509 SHORE ROAD
BROOKLYN · BIN 3328835
💬 Discuss this project
1950Year Built
3Stories
M3Building Class
R4AZoning
48,200 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Parsonage, rectory · Owner of record: BAY RIDGE PREPARATORY SCHOOL · 22,475 sf lot · 2.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscape
Permit Issued — active, not yet Signed-off
RoofUnder Construction110p · 3 filings · 20 docs
Floor 3Under Construction95p · 3 filings · 20 docs
Floor 2Under Construction128p · 2 filings · 20 docs
Floor 1Under Construction87p · 2 filings · 20 docs
CellarUnder Construction134p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BAY RIDGE PREPARATORY SCHOOL5509/26/2026
CELTIC SERVICES NYC INC503/22/2026
CRISTINA MICHAELS CONSTRUCTION MANA303/22/2026
BELFORD LONG ISLAND, LLC103/22/2026
METRIC CONSULTING INSPECT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Belfor Property Restoration103/21/2026
JAM CONSULTANTS, INC.3803/21/2026
ARCHI PRO GROUP103/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BELFOR LONG ISLAND LLCGeneral Contractor3908/12/2026
ARSENAL SCAFFOLD INCGeneral Contractor709/26/2026
CELTIC SERVICES NYC INCGeneral Contractor303/21/2026
CRISTINA MICHAELS CONST*General Contractor303/21/2026
J. CAIAZZO PLBG & HTG CORPlumbing207/08/2026
A & F FIRE PROTECTION COFire Protection207/08/2026
J. CAIAZZO PLBG & HTG CORPFire Protection207/08/2026
ROOPCHAND SINGHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PACIFICO ENGINEERING PC3157108/21/2026
BENDIX ENGINEERING, P.C.4293709/24/2025
METRIC CONSULTING AND INS1803506/18/2025
Building Lifecycle
All (216)Filed (24)Permit Issued (35)Signed Off (5)Violation (19)Inspection (24)Objection (79)Special Inspection (30)
09/25/2026
Permit issued — Sidewalk Shed
B01243984-I1-SH
08/27/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/21/2026
Filed — Alteration
Installation of pv solar system on roof. No change of use, egress, or occupancy.
B01447049-I1
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
08/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
08/17/2026
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
08/17/2026
Special inspection requirement — Final
Ralph Pacifico
08/11/2026
Permit issued — Support of Excavation
B00879256-S3-SE
08/07/2026
Violation issued (ECB, open)
Construction
08/07/2026
Violation issued (ECB, open)
Unknown
07/01/2026
Permit issued — Sidewalk Shed
B01243984-I1-SH
07/01/2026
Permit issued — General Construction
B00879256-I1-GC
07/01/2026
Permit issued — General Construction
B00879256-S4-GC-CX
06/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2026
Permit issued — Standpipe
B00879256-S9-EW-SD
06/17/2026
Permit issued — Sprinklers
B00879256-S9-EW-SP
06/15/2026
Permit issued — Construction Fence
B01243984-I1-FN
05/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2026
Permit issued — Construction Fence
B01243984-I1-SH
03/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/23/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/16/2026
Permit issued — Plumbing
B00879256-S7-PL
03/09/2026
Inspection — Certified StandPipe - SD - Fire StandPipe - SD - Roughing
Certified
View inspection ↗
02/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/21/2026
Objection resolved — Addressed
01/12/2026
Filed — Alteration
STRUCTURAL WORK ASSOCIATED WITH RENOVATION AS PER PLANS FILED HEREWITH.
B08021104-S7
01/12/2026
Permit issued — Supported Scaffold
B08021104-S7-SF
12/22/2025
Violation issued (ECB, closed)
Construction
12/22/2025
Violation issued (ECB, closed)
Construction
12/09/2025
Objection resolved — Addressed
12/08/2025
Objection raised — Energy
12/08/2025
Objection resolved — Addressed
12/01/2025
Objection resolved — Addressed
12/01/2025
Objection resolved — Addressed
12/01/2025
Objection resolved — Addressed
11/12/2025
Objection raised — Scope
11/12/2025
Objection raised — Scope
11/04/2025
Objection resolved — Addressed
10/28/2025
Filed — Alteration CO
Foundation and structural work as shown on drawings filed
B00879256-Z1
10/28/2025
Permit issued — Foundation
B00879256-S4-ST
10/17/2025
Objection resolved — Addressed
10/14/2025
Permit issued — Foundation
B00879256-S4-GC-CX
10/07/2025
Permit issued — General Construction
B00879256-I1-GC
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
Latest 60 of 216 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC09/25/2026
DOB NOWSupport of ExcavationPermit IssuedBELFOR LONG ISLAND LLC08/11/2026
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC07/01/2026
DOB NOWGeneral ConstructionPermit IssuedBELFOR LONG ISLAND LLC07/01/2026
DOB NOWGeneral ConstructionPermit IssuedBELFOR LONG ISLAND LLC07/01/2026
DOB NOWStandpipePermit IssuedA & F FIRE PROTECTION CO06/17/2026
DOB NOWSprinklersPermit IssuedA & F FIRE PROTECTION CO06/17/2026
DOB NOWConstruction FencePermit IssuedARSENAL SCAFFOLD INC06/15/2026
DOB NOWConstruction FencePermit IssuedARSENAL SCAFFOLD INC04/01/2026
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR03/16/2026
DOB NOWSupported ScaffoldPermit IssuedCRISTINA MICHAELS CONST*01/12/2026
DOB NOWFoundationPermit IssuedBELFOR LONG ISLAND LLC10/28/2025
DOB NOWFoundationPermit IssuedBELFOR LONG ISLAND LLC10/14/2025
DOB NOWGeneral ConstructionPermit IssuedBELFOR LONG ISLAND LLC10/07/2025
DOB NOWSupport of ExcavationPermit IssuedBELFOR LONG ISLAND LLC08/08/2025
DOB NOWConstruction FencePermit IssuedARSENAL SCAFFOLD INC06/24/2025
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC06/24/2025
DOB NOWGeneral ConstructionPermit IssuedBELFOR LONG ISLAND LLC07/18/2024
DOB NOWConstruction FenceSigned-offBELFOR LONG ISLAND LLC07/02/2024
DOB NOWStructuralSigned-offBELFOR LONG ISLAND LLC07/02/2024
DOB NOWMechanical SystemsSigned-offBELFOR LONG ISLAND LLC07/02/2024
DOB NOWConstruction FenceSigned-offBELFOR LONG ISLAND LLC07/01/2024
DOB NOWGeneral ConstructionSigned-offBELFOR LONG ISLAND LLC07/01/2024
DOB NOWPlumbingSigned-offANTHONY CAIAZZO05/21/2024
DOB NOWConstruction FenceSigned-offBELFOR LONG ISLAND LLC04/15/2024
DOB NOWGeneral ConstructionSigned-offBELFOR LONG ISLAND LLC03/15/2024
DOB NOWMechanical SystemsSigned-offBELFOR LONG ISLAND LLC03/15/2024
DOB NOWStructuralSigned-offBELFOR LONG ISLAND LLC03/15/2024
DOB NOWPlumbingSigned-offANTHONY CAIAZZO05/11/2023
DOB NOWSprinklersSigned-offJ. CAIAZZO PLBG & HTG COR05/11/2023
DOB NOWConstruction FenceSigned-offBELFOR LONG ISLAND LLC05/10/2023
DOB NOWMechanical SystemsSigned-offBELFOR LONG ISLAND LLC04/12/2023
DOB NOWGeneral ConstructionSigned-offBELFOR LONG ISLAND LLC04/12/2023
DOB NOWStructuralSigned-offBELFOR LONG ISLAND LLC04/12/2023
DOB NOWGeneral ConstructionSigned-offCELTIC SERVICES NYC INC06/27/2022
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/03/2009
BISSPISSUEDUNITED FIRE PROTECTION INC.09/07/2000
BISMHISSUEDBARNEY SKANSKA CONST CO04/07/1999
2 projects · most recent 01/12/2026
Heating and Air Conditioning Systems Ventilation Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
01/12/2026Permit IssuedCRISTINA MICHAELS CONST*Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PURY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×8
PURY-EP120TNU-A 135,000 BTU · Vrf Outdoor ×4
PURY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×4
MUZ-FS06NA-U1 8,700 BTU · Condensing Unit ×2
Rupp Air RARTU4-E.602-22-22T-ERV 4,870 CFM · Doas ×4
Ventilation
Greenheck NA 9,720 CFM · Erv ×4
Ducts & Piping
N/A NA 60,000 CFM · Ahu ×2
10/28/2025Permit IssuedBELFOR LONG ISLAND LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Captiveaire RVE-40-30D-10A-1-G2 128,300 CFM · Exhaust Fan ×2
RVE-40-36D-7B-1-G2 94,800 BTU ×1
Mitsubishi Electric MXZ-SM36NAM2-U1 41,000 BTU · Condensing Unit ×1
MXZ-SM60NAM2-U1 66,000 BTU · Condensing Unit ×1
PURY-EP144TNU-A1 160,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck SP-B80 50 CFM · Exhaust Fan ×5
2 projects · most recent 01/12/2026
Sprinkler System
FiledStatusContractorScope
01/12/2026Signed-offJ. CAIAZZO PLBG & HTG CORSprinkler System
10/28/2025Permit IssuedA & F FIRE PROTECTION COSprinkler System
2 projects · most recent 01/12/2026
Storm Water/Sanitary Gas
FiledStatusContractorScope
01/12/2026Signed-offJ. CAIAZZO PLBG & HTG CORGas, Storm, Water/Sanitary
10/28/2025Permit IssuedJ. CAIAZZO PLBG & HTG CORStorm, Water/Sanitary
7 projects · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026Permit IssuedSCIENTIFIC ELEC. CO. INCGeneral Wiring
08/11/2026Permit IssuedSCIENTIFIC ELEC. CO. INCGeneral Wiring
12/18/2025Permit IssuedPOWER CONNECT ELECTRIC COGeneral Wiring
09/25/2025Permit IssuedSOLAS ELECTRICAL CORP—
01/04/2025Permit IssuedWILLDAN ELECTRICAL OF NYGeneral Wiring
10/25/2023CompleteNYCOM ELECTRICAL CORP—
07/31/2023Permit IssuedSCIENTIFIC ELEC. CO. INCGeneral Wiring
2 projects · most recent 01/12/2026
Steel Concrete Masonry
FiledStatusContractorScope
01/12/2026Permit IssuedCRISTINA MICHAELS CONST*Steel, Concrete, Masonry
10/28/2025Permit IssuedBELFOR LONG ISLAND LLC2 scope_items
2 projects · most recent 01/12/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
01/12/2026Permit IssuedCRISTINA MICHAELS CONST*Fence, Scaffold
06/21/2025Permit IssuedARSENAL SCAFFOLD INCFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
08/27/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/26/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/23/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/09/2026Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
02/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/18/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/14/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/02/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
08/17/2026Air barrier - visual inspectionRalph Pacificoenergy_progress
08/17/2026Fire-Resistant Penetrations and JointsRalph Pacificospecial
08/17/2026Structural Stability – Alterations of existing buildingsRalph Pacificospecial
08/17/2026Energy Code Compliance InspectionsRalph Pacificoprogress
08/17/2026FinalRalph Pacificoprogress
09/23/2025Standpipe SystemsMatthew Bendixspecial
09/23/2025Fire-Resistant Penetrations and JointsMatthew Bendixspecial
09/23/2025Fire-Resistant Penetrations and Joints—special
09/23/2025Sprinkler SystemsMatthew Bendixspecial
09/22/2025Duct leakage testing, insulation and designMatthew Bendixenergy_progress
09/22/2025HVAC-R and service water heating system controlsMatthew Bendixenergy_progress
09/22/2025Energy Code Compliance InspectionsMatthew Bendixprogress
09/22/2025HVAC-R and service water piping design and insulationMatthew Bendixenergy_progress
09/22/2025HVAC-R and service water heating equipmentMatthew Bendixenergy_progress
09/22/2025Maintenance informationMatthew Bendixenergy_progress
09/22/2025Shutoff dampersMatthew Bendixenergy_progress
09/18/2025FinalMatthew Bendixprogress
09/18/2025Mechanical SystemsMatthew Bendixspecial
07/31/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/31/2025PreliminarySAMI HAJJAR P.Eprogress
07/31/2025MasonrySAMI HAJJAR P.Especial
07/31/2025Subsurface Conditions – Fill Placement & In-Place DensitySAMI HAJJAR P.Especial
07/31/2025Subgrade InspectionsSAMI HAJJAR P.Especial
06/17/2025Structural Steel - WeldingSAMI HAJJAR P.Especial
06/17/2025Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
Latest 25 of 100.
▾Documents — 182 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch24
08/29/2026B00762306-I1Request digital key ↗
08/27/2026B08021104-P3Request digital key ↗
08/27/2026B08021104-S7Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/25/2026B01015870-I1Request digital key ↗
08/25/2026B01050097-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
06/26/2024301039542Open ↗
12/22/2008310238720Open ↗
▸BISWORK PERMIT APPLICATION2
03/03/2009310238720Open ↗
03/03/2009310238720Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram5
08/20/2026B00879256-P6Open ↗
08/13/2026B00879256-P4Open ↗
08/13/2026B00879256-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/20/2026B00879256-P6Open ↗
08/13/2026B00879256-I1Open ↗
08/13/2026B00879256-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications64
▸DOB NOWProgress Inspector Seal & Signature26
09/23/2026B01447049-I1Open ↗
09/23/2026B01447049-I1Open ↗
09/07/2026B00879256-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/29/2026B00762306-I1Open ↗
08/27/2026B08021104-P3Open ↗
08/27/2026B08021104-P4Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026B01447049-I1Open ↗
09/01/2026B08021104-I1Open ↗
08/29/2026B08021104-S2Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/18/2026340916539Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/22/2008310238720Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
12/22/2008310238720Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00879256-S4Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist6
08/20/2026B00879256-P6Open ↗
08/13/2026B00879256-P3Open ↗
08/13/2026B00879256-I1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
02/23/2026340916539Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00879256-S4Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
08/27/2026B08021104-I1Open ↗
08/27/2026B08021104-S2Open ↗
08/15/2026B00879256-S9Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/05/2009310238720Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/29/2026B00762306-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08021104-S1Open ↗
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/22/2026B01447049-I1Open ↗
08/20/2026B00879256-P6Open ↗
08/13/2026B08021104-S6Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
12/22/2008310238720Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/22/2008310238720Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
12/22/2008310238720Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/17/2025340916539Open ↗
▸Other Documents28
▸DOB NOWPlot Diagram7
08/20/2026B00879256-P6Open ↗
08/13/2026B00879256-P1Open ↗
08/13/2026B00879256-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial6
08/20/2026B00879256-P6Open ↗
08/13/2026B00879256-I1Open ↗
08/13/2026B00879256-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/20/2026B00879256-P6Open ↗
08/13/2026B00879256-S4Open ↗
08/13/2026B00879256-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification5
08/20/2026B00879256-P6Open ↗
08/13/2026B00879256-P3Open ↗
08/13/2026B00879256-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
02/18/2026340916539Open ↗
02/18/2026340916539Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/19/2026340916539Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00879256-S3Open ↗