← Back
BuildNYC
Multi-story retail building (2+)
751 4TH AVENUE
BROOKLYN · BIN 3009613
💬 Discuss this project
1945Year Built
2Stories
K2Building Class
M1-1DZoning
4,800 sfGross Floor Area
1Units
1 Active Violation 1 old, status unconfirmed ▸FDNY Report ↗
Multi-story retail building (2+) · 2,775 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Remove and rebuild parapet wall1p · 1 filing · 5 docs
Floor 1Installation of Heavy Duty Sidewalk Shed5p · 1 filing · 2 docs
CellarDaily Store1 filing · 3 docs
Site & exteriorHeavy duty sidewalk shed9p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sherry Painting Construction807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mumtaz Enterprises110/10/2025
Syed Engineering207/26/2021
Ashraf107/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sheikh Expediting403/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kaj NY ConstructionScaffold303/21/2026
Sherry Painting and ConstructionScaffold303/21/2026
June ElectricElectrical103/21/2026
Sherry Painting and ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mumtaz Enterprises9459110/10/2025
Enthink Engineers6247107/13/2021
Building Lifecycle
All (55)Filed (4)Permit Issued (3)Signed Off (1)Violation (44)Special Inspection (3)
09/14/2026
Violation issued (ECB, open)
Construction
10/10/2025
Filed — Alteration
APPLICATION FILE TO INSTALL WALK-IN-COOLER WITH COMPRESSOR FOR REFRIGERATORS AT CELLAR FLOOR, INSTALL AIR CONDITION WITH SMALL DUCT AT 1st FLOOR FOR EXIST. DAILY STORE AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01272079-I1
07/17/2025
Violation issued (ECB, closed)
Construction
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2021
Violation issued (ECB, closed)
Construction
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2021
Signed off — Alteration
APPLICATION FILE TO EXIST. PARAPET WALL REMOVE AND REBUILD AT FRONT & SIDE ELEVATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00550898-I1
10/19/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/24/2021
Violation issued (ECB, closed)
Construction
08/13/2021
Permit issued — Supported Scaffold
B00564169-I1-SF
07/29/2021
Permit issued — General Construction
B00550898-I1-GC
07/26/2021
Filed — Alteration
B00564169-I1
07/13/2021
Filed — Alteration
APPLICATION FILE TO EXIST. PARAPET WALL REMOVE AND REBUILD AT FRONT & SIDE ELEVATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00550898-I1
07/01/2021
Special inspection requirement — Masonry
Sunil Saigal
07/01/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
07/01/2021
Special inspection requirement — Final
Sunil Saigal
06/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/2021
Permit issued — Sidewalk Shed
B00545250-I1-SH
06/25/2021
Filed — Alteration
B00545250-I1
06/22/2021
Violation issued (ECB, closed)
Construction
06/22/2021
Violation issued (ECB, closed)
Construction
06/22/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/28/2020
Violation issued (FDNY_NOV, closed)
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/02/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/10/2012
Violation issued (ECB, closed)
Unknown
10/10/2012
Violation issued (ECB, closed)
Unknown
11/09/2011
Violation issued (ECB, closed)
Construction
10/06/2011
Violation issued (ECB, closed)
Construction
09/17/2011
Violation issued (ECB, closed)
Construction
08/10/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/10/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/14/2011
Violation issued (ECB, closed)
Construction
07/14/2011
Violation issued (ECB, closed)
Construction
05/10/2011
Violation issued (ECB, closed)
Construction
05/10/2011
Violation issued (ECB, closed)
Construction
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/13/2008
Violation issued (ECB, closed)
Construction
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/23/1989
Violation issued (ECB, closed)
Public Assembly
02/23/1989
Violation issued (ECB, closed)
Public Assembly
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedSherry Painting and Construction08/13/2021
DOB NOWGeneral ConstructionSigned-offSherry Painting and Construction07/29/2021
DOB NOWSidewalk ShedPermit IssuedKaj NY Construction06/28/2021
BIS—ISSUEDNeptune Signs & Awnings02/19/2016
BIS—ISSUEDNeptune Signs & Awnings02/19/2016
BISFPISSUEDFire Command Co10/09/2012
BISPLISSUEDMichael Gangi P&H Contracting01/25/1999
BISFPISSUEDB & J Fire06/30/1998
BISSPISSUEDHeads Up Fire Sprinkler02/05/1998
BISSPISSUEDHeads Up Fire Sprinkler02/05/1998
BISPLISSUEDRaytone Plumbing Spec01/15/1998
1 project · most recent 10/10/2025
Air Conditioning Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
10/10/2025——Air Conditioning Systems, Refrigeration Systems
Cooling
American Standard AMERICAN STANDARD MOD NO. 4A7C3060A3000BA 60,000 BTU · Condensing Unit ×1
Refrigeration
Trenton TEZAO3OL8HT3CF 44,100 BTU · Refrigeration Unit ×5
2 projects · most recent 07/29/2025
General Wiring
FiledStatusContractorScope
07/29/2025Permit IssuedSwitch Electric of the FiveGeneral Wiring
07/29/2025Permit IssuedSwitch Electric of the FiveGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/01/2021MasonrySunil Saigalspecial
07/01/2021Structural Stability – Alterations of existing buildingsSunil Saigalspecial
07/01/2021FinalSunil Saigalprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Daily StoreRetailCellar
Project B01272079 Alteration · Approved · 10/10/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00545250-I1Request digital key ↗
09/01/2026B00550898-I1Request digital key ↗
09/01/2026B00564169-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
02/23/2016321312708Open ↗
02/23/2016321312691Open ↗
10/10/2012320542454Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
02/23/2016321312691Open ↗
02/20/2016321312708Open ↗
09/25/2012320542454Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/23/2016321312691Open ↗
02/20/2016321312708Open ↗
10/10/2012320542454Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00545250-I1Open ↗
09/01/2026B00550898-I1Open ↗
09/01/2026B00564169-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/23/2016321312691Open ↗
02/20/2016321312708Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/23/2016321312691Open ↗
02/20/2016321312708Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00550898-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00550898-I1Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/23/2016321312691Open ↗
02/20/2016321312708Open ↗
09/25/2012320542454Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00550898-I1Open ↗
08/20/2026B01272079-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS3
02/23/2016321312691Open ↗
02/20/2016321312708Open ↗
09/25/2012320542454Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/11/2016321312708Open ↗
04/08/2016321312691Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/11/2016321312708Open ↗
04/08/2016321312691Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
04/11/2016321312708Open ↗
04/08/2016321312691Open ↗
02/23/2016321312691Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
02/20/2016321312708Open ↗
02/20/2016321312691Open ↗
09/25/2012320542454Open ↗