← Back
Nursing home
Duncan Genns
751 EVERGREEN AVENUE · Bushwick (East) · BIN 3080124
💬 Discuss this project
1982Year Built
7Stories
I6Building Class
R6Zoning
90,095 sfGross Floor Area
103Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMPFDNY Report ↗
Nursing home · 30,017 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipment
Roof5p · 3 filings · 20 docs
Cellar1p · 3 filings · 16 docs
Basement3p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MULTIFAMILY MANAGEMENT SERVICES2007/08/2026
T-MOBILE403/22/2026
BSR MANAGEMENT103/22/2026
CLEARWIRE103/21/2026
ST THOMAS EPISCOPAL HOUSING303/21/2026
ST THOMAS EPISCOPAL CHURCH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GC1 EXPEDITING203/21/2026
S R SOLAR DESIGN403/21/2026
Rigid Structural Design, LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DECOR HOME REMODELING CONGeneral Contractor903/21/2026
CROSSFIELD PLBG.&HTGPlumbing307/08/2026
SQUAN CONSTRUCTION SERVICGeneral Contractor203/21/2026
ANTHONY COSTANZOElectrical203/21/2026
PLATINUM ELECTRICAL GRPElectrical103/22/2026
RICHARD NEUElectrical103/22/2026
VIALVA, JOSEPHElectrical103/21/2026
770 ELECTRIC CORPGeneral Contractor107/08/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
INNOVATION PLUMBING LLCPlumbing107/08/2026
JOHNNY'S P&H CONTRAC INCPlumbing107/08/2026
BECKER, CHARLESElectrical103/21/2026
FILARDI, JAMESElectrical103/21/2026
KIRK FERRIERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244205/13/2025
URBAN INTEGRATIONS LLC7993108/19/2024
STEWART ENGINEERING SERVI2506304/12/2024
BAZINI ENGINEERING, P.C.1808308/29/2023
RYAN SPECIAL ENGINEERING2018102/16/2023
KMB DESIGN GROUP, LLC513103/29/2022
Building Lifecycle
All (136)Filed (12)Permit Issued (12)Signed Off (8)Facade (FISP) (12)Violation (60)Inspection (7)Objection (4)Special Inspection (21)
11/18/2025
Violation issued (HPD, closed)
I
05/30/2025
Violation issued (HPD, closed)
B
05/30/2025
Violation issued (HPD, closed)
A
05/23/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01125882-I1
05/13/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01125882-P1
05/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
05/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
05/12/2025
Special inspection requirement — Final
NARESH MAHANGU
05/12/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
01/16/2025
Permit issued — Solar
B01125882-I1-SL
01/16/2025
Violation issued (HPD, closed)
B
01/16/2025
Violation issued (HPD, closed)
B
01/12/2025
Violation issued (HPD, closed)
C
12/27/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01093539-I1
11/26/2024
Violation issued (HPD, closed)
I
11/19/2024
Violation issued (HPD, closed)
B
11/19/2024
Violation issued (HPD, closed)
B
11/12/2024
Objection resolved — Addressed
11/12/2024
Objection resolved — Addressed
10/25/2024
Objection raised — Other
10/25/2024
Objection raised — Other
10/16/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01125882-I1
10/10/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01093539-P1
09/26/2024
Violation issued (FDNY_NOV, closed)
09/26/2024
Violation issued (FDNY_NOV, closed)
09/26/2024
Violation issued (FDNY_ORDER, closed)
08/22/2024
Permit issued — Suspended Scaffold
B01095774-I1-SC
08/19/2024
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
B01095774-I1
08/13/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Amal Hassan Hassan
08/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
08/13/2024
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
08/09/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01093539-I1
08/09/2024
Permit issued — Sidewalk Shed
B01093539-I1-SH
04/25/2024
Signed off — Alteration
Renovate six handicap adaptable apartments on the first floor as well as renovate the common areas on the first floor.. Create two ADA parking spaces in the parking lot and provide provide a concrete sidewalk from the building to access the parking lot
B00818768-I1
04/25/2024
Signed off — Alteration
Relocate kitchen and bathroom plumbing fixtures in six apartments and the common areas on the first floor.
B00819415-I1
04/17/2024
Signed off — Alteration
B00920489-I1
04/17/2024
Signed off — Alteration
INSTALL ONE (1) GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00920481-I1
04/17/2024
Signed off — Alteration
REPLACE ONE (1) MODULAR BOILER WITH ONE (1) GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00920463-I1
04/12/2024
Filed — Alteration
Relocate kitchen and bathroom plumbing fixtures in six apartments and the common areas on the first floor.
B00819415-P1
04/11/2024
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
04/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
04/09/2024
Violation issued (HPD, closed)
A
04/01/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/27/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/22/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/21/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/14/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/19/2024
Permit issued — Plumbing
B00819415-I1-PL
01/18/2024
Permit issued — General Construction
B00818768-I1-GC
11/17/2023
Violation issued (HPD, closed)
I
10/26/2023
Permit issued — General Construction
B00818768-I1-GC
09/06/2023
Permit issued — Boiler Equipment
B00920481-I1-BE
09/06/2023
Permit issued — Plumbing
B00920489-I1-PL
09/05/2023
Permit issued — Boiler Equipment
B00920463-I1-BE
08/29/2023
Filed — Alteration
B00920489-I1
08/29/2023
Filed — Alteration
INSTALL ONE (1) GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00920481-I1
08/29/2023
Filed — Alteration
REPLACE ONE (1) MODULAR BOILER WITH ONE (1) GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00920463-I1
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-off770 ELECTRIC CORP01/16/2025
DOB NOWSuspended ScaffoldPermit IssuedPHOENIX SUTTON STR, INC08/22/2024
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC08/09/2024
DOB NOWPlumbingSigned-offINNOVATION PLUMBING LLC01/19/2024
DOB NOWGeneral ConstructionSigned-offDECOR HOME REMODELING CON01/18/2024
DOB NOWGeneral ConstructionSigned-offDECOR HOME REMODELING CON10/26/2023
DOB NOWBoiler EquipmentSigned-offCROSSFIELD PLBG.&HTG09/06/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG09/06/2023
DOB NOWBoiler EquipmentSigned-offCROSSFIELD PLBG.&HTG09/05/2023
DOB NOWGeneral ConstructionSigned-offDECOR HOME REMODELING CON03/09/2023
DOB NOWPlumbingSigned-offJOHNNY NANHU03/07/2023
DOB NOWAntennaSigned-offSQUAN CONSTRUCTION SERVIC04/28/2022
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/18/2016
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/21/2015
BISOTISSUEDTELCOM ENGINEERING GP INC08/10/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC06/08/2015
BISOTISSUEDTELCOM ENGINEERING GP INC03/05/2013
BISOTISSUEDODYSSIA GLOBAL COMM. CORP08/01/2012
BISOTISSUEDCOSTROTTA CONSTRUCT MG IN03/28/2012
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM04/15/2011
BISOTISSUEDMILLENIUM RESTORATION CORP02/07/2011
BISOTISSUEDARETE DEVELOPMENT INC12/01/2010
BISOTISSUEDRAMAPO COMMUNICATION CORP07/19/2010
BISOTISSUEDBCI COMMUNICATIONS INC01/22/2009
BISOTISSUEDBCI COMM INC02/26/2008
BISOTISSUEDBCI COMMUNICATIONS, INC02/01/2008
BISOTISSUEDBCI COMMUNICATIONS, INC11/15/2007
BISOTISSUEDODYSSIA GLOBAL COMM. CORP08/08/2005
BISOTISSUEDBERLINER COMMUNICATIONS, INC.04/06/2001
BISOTISSUEDBERLINER COMMUNICATION12/16/1998
BISOTRE-ISSUEDODYSSIA GENERAL CONSTR INC09/13/1996
6 projects · most recent 04/21/2025
General Wiring
FiledStatusContractorScope
04/21/2025CompleteGRID CITY ELECTRIC, CORP72 meters, 1 new_meters
08/12/2024CompleteRICHARD NEU—
01/04/2024CompleteAPPROVED ELECTRIC CORP.General Wiring
12/08/2023CompleteAPPROVED ELECTRIC CORP.General Wiring
01/04/2019CompletePLATINUM ELECTRICAL GRPGeneral Wiring
09/28/2018CompletePLATINUM ELECTRICAL GRPGeneral Wiring
1 project · most recent 08/19/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/19/2024Permit IssuedPHOENIX SUTTON STR, INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/01/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/27/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/22/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/12/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/12/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
05/12/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
05/12/2025FinalNARESH MAHANGUprogress
05/12/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/13/2024Alternative Materials - OTCR Buildings Bulletin NumberAmal Hassan Hassanspecial
08/13/2024Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
08/13/2024Post-installed AnchorsDANNY TRUJILLOspecial
04/11/2024Energy Code Compliance InspectionsEGAR STEWARTprogress
04/11/2024Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
08/29/2023HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
08/29/2023HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
08/16/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
08/16/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
02/16/2023Tenant Protection Plan ComplianceWilliam Ryanspecial
01/28/2023Lighting in dwelling unitsEGAR STEWARTenergy_progress
01/28/2023Insulation placement and R valuesEGAR STEWARTenergy_progress
01/26/2023Energy Code Compliance InspectionsEGAR STEWARTprogress
01/26/2023Fire-Resistance Rated ConstructionEGAR STEWARTprogress
01/26/2023Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
01/25/2023FinalEGAR STEWARTprogress
▾Documents — 170 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/30/2026B00684518-I1Request digital key ↗
08/27/2026B00819415-P1Request digital key ↗
08/27/2026B00819415-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION15
10/19/2016321121255Open ↗
11/10/2015321121255Open ↗
08/12/2015321182028Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
06/18/2018321121255Open ↗
05/29/2018321121255Open ↗
07/31/2015321182028Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/05/2018321121255Open ↗
▸Seals & Professional Certifications47
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
07/19/2018321121255Open ↗
07/19/2018321121255Open ↗
10/06/2015321182028Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/30/2026B00684518-I1Open ↗
08/27/2026B00819415-I1Open ↗
08/27/2026B00819415-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B00920481-I1Open ↗
09/23/2026B00920463-I1Open ↗
08/28/2026B01125882-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B00920481-I1Open ↗
09/23/2026B00920463-I1Open ↗
08/28/2026B01125882-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/19/2011320294230Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/19/2011320294230Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA2
06/18/2018321121255Open ↗
01/29/2016321121255Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00819415-P1Open ↗
08/27/2026B00819415-I1Open ↗
08/26/2026B00920463-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
03/23/2012320452103Open ↗
10/06/2010320222914Open ↗
07/14/2010320187098Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/31/2015321182028Open ↗
07/24/2012320529656Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
04/19/2011320294230Open ↗
01/18/2011320262078Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
07/19/2018321121255Open ↗
10/06/2015321182028Open ↗
07/31/2015321182028Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/19/2018321121255Open ↗
10/06/2015321182028Open ↗
05/30/2013320452103Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/23/2012320452103Open ↗
▸Approvals, Objections & Sign-offs27
▸BISADMINISTRATIVE OBJECTIONS9
07/24/2012320529656Open ↗
03/23/2012320452103Open ↗
04/19/2011320294230Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/26/2026B00920489-I1Open ↗
08/21/2026B01125882-P1Open ↗
08/15/2026B01125882-I1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
07/19/2018321121255Open ↗
10/06/2015321182028Open ↗
08/27/2012320262078Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/30/2013320452103Open ↗
04/05/2012320294230Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
04/05/2012320294230Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01125882-I1Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
07/19/2018321121255Open ↗
10/06/2015321182028Open ↗
07/31/2015321182028Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
07/31/2015321182028Open ↗
05/07/2015321121255Open ↗
07/24/2012320529656Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
06/15/2018321121255Open ↗
03/14/2013320187098Open ↗
▸BISBOROUGH INTAKE FORM1
07/19/2018321121255Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01095774-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01095774-I1Open ↗