← Back
BuildNYC
Elevator apt, fireproof without stores
751 ROSEDALE AVENUE
BRONX · BIN 2130545
💬 Discuss this project
2021Year Built
7Stories
D3Building Class
R6Zoning
21,711 sfGross Floor Area
33Units
Rent Stabilized0 Active Violations
Elevator apt, fireproof without stores · Owner of record: 545 NW 28 St · 7,500 sf lot · 2.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFamily dwelling35p · 3 filings · 20 docs
BulkheadFoundation for new 7 story building1p · 1 filing · 20 docs
Floor 7Family dwelling54p · 4 filings · 20 docs
Floor 6Family dwelling54p · 4 filings · 20 docs
Floor 5Family dwelling53p · 4 filings · 20 docs
Floor 4Family dwelling53p · 4 filings · 20 docs
Floor 3Family dwelling54p · 4 filings · 20 docs
Floor 2Family dwelling55p · 4 filings · 20 docs
Floor 1Above ground tank installation60p · 8 filings · 20 docs
Site & exteriorAbove ground tank installation56p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1467 Rosedale603/21/2026
545 NW 28 St103/22/2026
751 Rosedale I103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/25/2023$11.0M—751 ROSEDALE LLC → 545 NW 28 ST LLC$507/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Consolidated Scaffold Bridge1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vera CartingGeneral Contractor1207/08/2026
Consolidated ScaffoldingScaffold1107/08/2026
Vera CartingScaffold207/08/2026
Prime Piping & HeatingPlumbing207/08/2026
Prime Piping & HeatingFire Protection207/08/2026
Dennison ElectricGeneral Contractor203/22/2026
Chael ConstructionScaffold107/08/2026
Fernando GeremiaElectrical103/21/2026
SNS OrgnizationGeneral Contractor107/08/2026
Dennison ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Automated Design Consulta895603/13/2024
Certified Testing Laborat396509/15/2022
Building Lifecycle
07/15/2026
Elevator Category 1 inspection report filed
05/05/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · closed
05/05/2026
§27-2104(b) hmc post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the…
HPD violation · closed
05/05/2026
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · closed
01/13/2026
1) the cat-5 tag is missing (this elevator was tested in 2023). 2) the phone works but the operator could not connect the video/text). 3) the car…
ECB violation · closed
117 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz08/11/2023
DOB NOWMechanical SystemsSigned-offSNS Orgnization08/11/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating06/13/2023
DOB NOWSprinklersSigned-offAmb Mechanical06/13/2023
DOB NOWMechanical SystemsSigned-offVera Carting03/31/2023
DOB NOWCurb CutSigned-offVera Carting03/15/2023
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding03/02/2023
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding11/03/2022
DOB NOWStructuralSigned-offVera Carting10/14/2022
DOB NOWConstruction FenceSigned-offVera Carting08/02/2022
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding03/16/2022
DOB NOWSupported ScaffoldSigned-offConsolidated Scaffolding12/08/2021
DOB NOWSprinklersSigned-offAmb Mechanical12/07/2021
DOB NOWPlumbingSigned-offPrime Piping & Heating11/22/2021
DOB NOWSidewalk ShedSigned-offConsolidated Scaffolding11/02/2021
DOB NOWStructuralSigned-offVera Carting10/19/2021
DOB NOWFoundationSigned-offVera Carting08/30/2021
DOB NOWSupport of ExcavationSigned-offVera Carting08/19/2021
DOB NOWConstruction FenceSigned-offVera Carting08/18/2021
DOB NOWConstruction FenceSigned-offChael Construction03/08/2021
BIS—ISSUEDVera Carting06/27/2023
BIS—ISSUEDVera Carting06/09/2022
BIS—ISSUEDVera Carting11/24/2021
BIS—ISSUEDHatzlacha Home Improvements *11/27/2018
6 projects · most recent 10/24/2023
General Wiring
FiledStatusContractorScope
10/24/2023CompleteDennison ElectricGeneral Wiring
10/17/2023CompleteDennison ElectricGeneral Wiring
12/02/2022CompleteStar Electrical Contractors—
10/21/2022CompleteDennison ElectricGeneral Wiring
11/01/2021CompleteV. Vass Electric—
03/17/2021CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
09/22/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
07/20/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/29/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/10/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
03/14/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsGregory Mortmanspecial
03/13/2024Mechanical SystemsGregory Mortmanspecial
03/13/2024FinalGregory Mortmanprogress
03/11/2024Mechanical SystemsGregory Mortmanspecial
03/11/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsGregory Mortmanspecial
03/11/2024FinalGregory Mortmanprogress
09/19/2022FinalKIRT DOBBINSprogress
09/19/2022Structural Steel - High Strength BoltingKIRT DOBBINSspecial
09/19/2022Structural Steel - WeldingKIRT DOBBINSspecial
09/19/2022Structural Steel - DetailsKIRT DOBBINSspecial
09/19/2022Post-installed AnchorsKIRT DOBBINSspecial
09/19/2022Concrete - Cast-In-PlaceKIRT DOBBINSspecial
08/02/2022Structural Steel - DetailsKIRT DOBBINSspecial
08/02/2022Concrete - Cast-In-PlaceKIRT DOBBINSspecial
08/02/2022Post-installed AnchorsKIRT DOBBINSspecial
08/02/2022Structural Steel - High Strength BoltingKIRT DOBBINSspecial
08/02/2022Structural Steel - WeldingKIRT DOBBINSspecial
08/02/2022FinalKIRT DOBBINSprogress
07/20/2021HVAC-R and service water heating equipmentGregory Mortmanenergy_progress
07/20/2021HVAC-R and service water piping design and insulationGregory Mortmanenergy_progress
07/20/2021Sprinkler SystemsGregory Mortmanspecial
07/20/2021Energy Code Compliance InspectionsGregory Mortmanprogress
07/20/2021HVAC-R and service water heating system controlsGregory Mortmanenergy_progress
07/19/2021Mechanical SystemsGregory Mortmanspecial
07/19/2021Energy Code Compliance InspectionsGregory Mortmanprogress
Latest 25 of 37.
190 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account