← Back
Two stories - detached, small or mid-size
752 Delafield Avenue
752 DELAFIELD AVENUE · Port Richmond · BIN 5006233
💬 Discuss this project
1750Year Built
1.5Stories
A1Building Class
R3AZoning
2,212 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 14,850 sf lot · 0.15 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof4p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC212/29/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854212/29/2025
Building Lifecycle
All (10)Filed (2)Permit Issued (1)Signed Off (1)Objection (2)Special Inspection (4)
01/26/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01217715-I1
12/29/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01217715-P1
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
12/29/2025
Special inspection requirement — Final
TOM PETERSEN
12/29/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
06/17/2025
Permit issued — Solar
S01217715-I1-SL
05/28/2025
Objection resolved — Addressed
05/16/2025
Objection raised — Electrical
04/29/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01217715-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY06/17/2025
1 project · most recent 04/14/2025
FiledStatusContractorScope
04/14/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
12/29/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
12/29/2025Energy Code Compliance InspectionsTOM PETERSENprogress
12/29/2025FinalTOM PETERSENprogress
12/29/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026S01217715-P1Request digital key ↗
08/19/2026S01217715-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/13/2026S01217715-I1Open ↗
08/13/2026S01217715-P1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026S01217715-P1Open ↗
08/22/2026S01217715-P1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026S01217715-I1Open ↗
08/19/2026S01217715-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026S01217715-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026S01217715-I1Open ↗
08/19/2026S01217715-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01217715-I1Open ↗