← Back
Three families
7521 19 AVENUE
BROOKLYN · Bensonhurst · BIN 3160316
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R5Zoning
2,760 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,600 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar4p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BASIC GROUPS CORP1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/20/2021$1.6M—Private party → Private party$591/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP212/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HUNG YIP CONTRACTORS INCGeneral Contractor603/21/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371212/21/2021
Building Lifecycle
All (25)Filed (2)Permit Issued (3)Signed Off (2)Violation (11)Inspection (5)Special Inspection (2)
11/19/2025
Violation issued (HPD, closed)
I
06/06/2025
Violation issued (HPD, closed)
A
11/26/2024
Violation issued (HPD, closed)
I
04/03/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/27/2023
Signed off — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00648622-I1
03/20/2023
Violation issued (HPD, closed)
A
03/14/2023
Signed off — Alteration
INSTALL NEW GAS METER, BOILER AND H.W.H. IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00648007-I1
11/10/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2022
Violation issued (HPD, closed)
I
07/07/2022
Permit issued — General Construction
B00648622-I1-GC
05/02/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/22/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/22/2022
Violation issued (HPD, closed)
A
12/29/2021
Permit issued — General Construction
B00648622-I1-GC
12/22/2021
Permit issued — Plumbing
B00648007-I1-PL
12/21/2021
Filed — Alteration
INSTALL NEW GAS METER, BOILER AND H.W.H. IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00648007-I1
12/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/20/2021
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
12/15/2021
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. PARTITION, FLOORING AND PAINTING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00648622-I1
04/06/2021
Violation issued (HPD, closed)
A
10/06/2015
Violation issued (HPD, closed)
I
02/06/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHUNG YIP CONTRACTORS INC07/07/2022
DOB NOWGeneral ConstructionSigned-offHUNG YIP CONTRACTORS INC12/29/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC12/22/2021
1 project · most recent 02/16/2022
General Wiring
FiledStatusContractorScope
02/16/2022CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
12/20/2021Fire-Resistant Penetrations and JointsEric Sunspecial
12/20/2021Energy Code Compliance InspectionsEric Sunprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/31/2026B00648622-I1Request digital key ↗
08/31/2026B00648007-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/31/2026B00648622-I1Open ↗
08/13/2026B00648007-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026B00648007-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026B00648007-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/31/2026B00648622-I1Open ↗
08/13/2026B00648007-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00648622-I1Open ↗