← Back
Office with apartments (no commercial)
7523 FT HAMILTON PARKWAY
BROOKLYN · Dyker Heights · BIN 3148924
💬 Discuss this project
1899Year Built
2Stories
O8Building Class
R5BZoning
3,300 sfGross Floor Area
3Units
Office with apartments (no commercial) · 2,098 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction7p · 2 filings · 6 docs
Floor 1Under Construction7p · 2 filings · 6 docs
CellarUnder Construction1 filing · 2 docs
Sub-BasementUnder Construction7p · 2 filings · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI308/03/2026
B&Z ENGINEERING CONSULTANTS108/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B A INSPECTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PERSPECTIVE GENERAL CONSTGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing208/12/2026
KALE CONSTRUCTION INCGeneral Contractor108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394108/03/2026
BAALBAKI&ASSOCIATES ENGIN1858108/18/2022
Building Lifecycle
All (15)Filed (4)Permit Issued (4)Signed Off (1)Special Inspection (6)
08/11/2026
Permit issued — Boiler Equipment
B01432573-I1-BE
08/11/2026
Permit issued — Plumbing
B01432569-I1-PL
08/05/2026
Permit issued — General Construction
B01432561-I1-GC
08/03/2026
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01432561-I1
08/03/2026
Filed — Alteration
INSTALL (2) NEW BOILERS FOR EXISTING 1-FAMILY DWELLING AND (1)DENTIST OFFICE ON BASEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01432573-I1
08/03/2026
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, BOILERS AND HOT WATER HEATERS ON BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01432569-I1
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
08/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
07/19/2023
Signed off — Alteration
REPLACE DAMAGED FLOOR JOISTS AND INSTALL A STEEL BEAM
B00792553-I1
03/10/2023
Permit issued — Structural
B00792553-I1-ST
08/18/2022
Filed — Alteration
REPLACE DAMAGED FLOOR JOISTS AND INSTALL A STEEL BEAM
B00792553-I1
08/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mohammad Baalbaki
08/12/2022
Special inspection requirement — Structural Steel - Details
Mohammad Baalbaki
08/12/2022
Special inspection requirement — Final
NABIL ASAAD
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedJOHN FITZGERALD PLBG &HTG08/11/2026
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG08/11/2026
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC08/05/2026
DOB NOWStructuralSigned-offPERSPECTIVE GENERAL CONST03/10/2023
1 project · most recent 08/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/03/2026Permit IssuedJOHN FITZGERALD PLBG &HTGGas, Storm, Water/Sanitary
3 projects · most recent 08/24/2026
General Wiring
FiledStatusContractorScope
08/24/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
07/23/2023CompleteCL ELECTRICAL CORP3 meters, 1 new_meters
10/26/2021Permit IssuedWCK ELECTRIC CORP.3 meters, 3 new_meters
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/03/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
08/03/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
08/03/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
08/12/2022Structural Stability – Alterations of existing buildingsMohammad Baalbakispecial
08/12/2022Structural Steel - DetailsMohammad Baalbakispecial
08/12/2022FinalNABIL ASAADprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/28/2026B00792553-I1Request digital key ↗
08/16/2026B01432569-I1Request digital key ↗
08/16/2026B01432573-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026B00792553-I1Open ↗
08/16/2026B01432569-I1Open ↗
08/16/2026B01432573-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026B00792553-I1Open ↗
08/31/2026B00792553-I1Open ↗
08/23/2026B01432561-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026B00792553-I1Open ↗
08/23/2026B01432561-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/28/2026B00792553-I1Open ↗