← Back
Walk-up apt, over six families with stores
753 9 AVENUE
MANHATTAN · BIN 1026689
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R8Zoning
10,650 sfGross Floor Area
13Units
Rent Stabilized0 Open Violations
Walk-up apt, over six families with stores · Owner of record: 753 NINTH AVE LLC · 2,517 sf lot · 4.23 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Permit Issued — active, not yet Signed-off
Floor 4Under Construction7p · 1 filing · 14 docs
Floor 3Under Construction8p · 2 filings · 19 docs
Floor 2Under Construction4p · 1 filing · 14 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SILVERSTONE PROPERTY GROUP1007/08/2026
753 NINTH AVE LLC103/22/2026
OWNER OF 753 9 AVE NY103/22/2026
KIC-1703/22/2026
LIP GOULD INC103/22/2026
THE OWNER OF103/22/2026
KIC-1 LLC JESSE EVANS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/15/2024$5.0M—— → —$469/sf building
03/01/2021$6.4M—— → —$598/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HT ASSOCIATES204/01/2025
UNFOLD ARCHITECT, PC304/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING203/21/2026
HAOTIAN & ASSOCIATES INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SENAD MEHOVICElectrical203/21/2026
KG MANAGEMENT CNSLTNG INCGeneral Contractor203/21/2026
VILLAGE P & H NY INCPlumbing207/08/2026
JESUS CORPORANElectrical103/21/2026
HT BUILDS LLCGeneral Contractor104/09/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373204/01/2025
UNFOLD ARCHITECT7707109/27/2021
Building Lifecycle
All (87)Filed (5)Permit Issued (5)Signed Off (2)Violation (60)Inspection (7)Objection (2)Special Inspection (6)
05/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/07/2026
Permit issued — Plumbing
M01188305-S1-PL
01/13/2026
Violation issued (HPD, closed)
A
01/13/2026
Violation issued (HPD, closed)
A
01/13/2026
Violation issued (HPD, closed)
C
01/13/2026
Violation issued (HPD, closed)
C
01/13/2026
Violation issued (HPD, closed)
C
01/13/2026
Violation issued (HPD, closed)
A
01/13/2026
Violation issued (HPD, closed)
A
01/13/2026
Violation issued (HPD, closed)
A
01/13/2026
Violation issued (HPD, closed)
B
01/13/2026
Violation issued (HPD, closed)
C
01/13/2026
Violation issued (HPD, closed)
B
11/17/2025
Violation issued (HPD, closed)
I
07/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
05/02/2025
Permit issued — General Construction
M01188305-I1-GC
04/10/2025
Permit issued — Plumbing
M01188305-S1-PL
04/01/2025
Filed — Alteration
PROPOSE INTERIOR RENOVATION AS PER PLAN FILE HEREWITH @ UNIT 2A, 2B, 3A, 3B, 4A AND 4B. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01188305-S1
03/03/2025
Filed — Alteration
PROPOSE INTERIOR RENOVATION AS PER PLAN FILE HEREWITH @ UNIT 2A, 2B, 3A, 3B, 4A AND 4B. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01188305-I1
02/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
KY FU
02/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
02/28/2025
Special inspection requirement — Energy Code Compliance Inspections
KY FU
02/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
KY FU
02/28/2025
Special inspection requirement — Lighting controls
KY FU
02/28/2025
Special inspection requirement — Lighting in dwelling units
KY FU
01/28/2025
Violation issued (HPD, closed)
C
01/28/2025
Violation issued (HPD, closed)
C
10/18/2023
Violation issued (HPD, closed)
C
10/18/2023
Violation issued (HPD, closed)
C
06/27/2023
Signed off — Alteration
file alteration type 2 for minor interior renovation to combine apt units 3C and 4C at third and fourth floors. No change of use, egress, or occupancy
M00578390-I1
08/16/2022
Signed off — Alteration
FILE ALTERATION TYPE 2 FOR MINOR PLUMBING INTERIOR RENOVATION TO COMBINE APARTMENT UNITS 3C AND 4C, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00578392-I1
08/15/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/19/2022
Violation issued (HPD, closed)
C
05/11/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/21/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/19/2022
Violation issued (HPD, closed)
B
04/19/2022
Violation issued (HPD, closed)
B
04/13/2022
Filed — Alteration
FILE ALTERATION TYPE 2 FOR MINOR PLUMBING INTERIOR RENOVATION TO COMBINE APARTMENT UNITS 3C AND 4C, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00578392-P2
04/11/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/09/2022
Permit issued — Plumbing
M00578392-I1-PL
01/21/2022
Permit issued — General Construction
M00578390-I1-GC
10/20/2021
Violation issued (HPD, closed)
A
10/20/2021
Violation issued (HPD, closed)
C
10/20/2021
Violation issued (HPD, closed)
A
10/20/2021
Violation issued (HPD, closed)
B
10/20/2021
Violation issued (HPD, closed)
A
10/20/2021
Violation issued (HPD, closed)
B
10/20/2021
Violation issued (HPD, closed)
C
10/20/2021
Violation issued (HPD, closed)
B
10/13/2021
Violation issued (HPD, closed)
B
09/28/2021
Objection raised — Accessibility
09/28/2021
Objection resolved — Addressed
09/27/2021
Filed — Alteration
file alteration type 2 for minor interior renovation to combine apt units 3C and 4C at third and fourth floors. No change of use, egress, or occupancy
M00578390-I1
09/27/2021
Filed — Alteration
FILE ALTERATION TYPE 2 FOR MINOR PLUMBING INTERIOR RENOVATION TO COMBINE APARTMENT UNITS 3C AND 4C, NO CHANGE OF USE, EGRESS, OR OCCUPANCY
M00578392-I1
05/14/2021
Violation issued (HPD, closed)
C
05/14/2021
Violation issued (HPD, closed)
B
05/14/2021
Violation issued (HPD, closed)
A
05/14/2021
Violation issued (HPD, closed)
A
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC05/07/2026
DOB NOWGeneral ConstructionPermit IssuedHT BUILDS LLC05/02/2025
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC04/10/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC02/09/2022
DOB NOWGeneral ConstructionSigned-offKG MANAGEMENT CNSLTNG01/21/2022
BISBLISSUEDBAYSIDE FUEL04/13/2004
BIS—ISSUEDR. ACEVEDO GENERAL CONTRA03/20/2002
BISPLISSUEDHYDRO MECHANICAL INC01/23/2002
BISSPISSUEDHYDRO MECHANICAL INC01/17/2002
BIS—ISSUEDHRW CONSTRUCTION CORPORATION07/02/2001
BISPLISSUEDAUTHENTIC PLBG CORP04/13/1998
BIS—ISSUEDLOWER EAST REDEVELOPMENT INC02/05/1998
BISPLISSUEDBISSETTA & LIST INC09/03/1997
BIS—ISSUEDLOWER EAST REDEVELOPMENT INC08/25/1997
BISFPISSUEDMASTER FIRE PREVENTION08/01/1997
BISPLRE-ISSUEDBISSETTA & LIST INC07/02/1997
BIS—ISSUEDLIPGOLD RESTAURANT INC04/09/1997
BISMHISSUEDLIPGOLD RESTAURANT INC01/23/1997
1 project · most recent 04/01/2025
Water/Sanitary
FiledStatusContractorScope
04/01/2025Permit IssuedPARAMOUNT SERVICES, LLCWater/Sanitary
1 project · most recent 05/02/2022
General Wiring
FiledStatusContractorScope
05/02/2022CompleteE & M ELECTRICAL NY CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2022Pass-Final General Construction Non-Directive 14PassView ↗
05/11/2022Fail-Final General Construction Non-Directive 14FailView ↗
04/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/28/2025Tenant Protection Plan ComplianceKY FUspecial
02/28/2025Fire-Resistant Penetrations and JointsKY FUspecial
02/28/2025Energy Code Compliance InspectionsKY FUprogress
02/28/2025Fire-Resistance Rated ConstructionKY FUprogress
02/28/2025Lighting controlsKY FUenergy_progress
02/28/2025Lighting in dwelling unitsKY FUenergy_progress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/02/2026M00578392-P2Request digital key ↗
09/02/2026M00578392-I1Request digital key ↗
08/24/2026M01188305-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026M00578392-I1Open ↗
09/02/2026M00578392-P2Open ↗
08/13/2026M00578390-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M01188305-I1Open ↗
09/01/2026M01188305-I1Open ↗
09/01/2026M01188305-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M01188305-I1Open ↗
09/01/2026M01188305-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist5
08/13/2026M01188305-I1Open ↗
08/13/2026M00578390-I1Open ↗
08/13/2026M01188305-S1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026M00578392-I1Open ↗
09/02/2026M00578392-P2Open ↗
08/13/2026M01188305-S1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00578390-I1Open ↗