← Back
Two stories - detached, small or mid-size
75-31 183 STREET
QUEENS · BIN 4154898
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
1,296 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3058 BRACHA1607/08/2026
REMAX CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/02/2021$920K—Private party → Private party$710/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC406/22/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REMAX CONSTRUCTION LLCGeneral Contractor603/21/2026
AUSTIN PLBG & HTG CO.INCPlumbing107/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519206/22/2022
IP CONCRETE TESTING AND I6252106/09/2022
Building Lifecycle
All (47)Filed (4)Permit Issued (4)Signed Off (3)Violation (2)Inspection (4)Special Inspection (30)
08/17/2025
Signed off — Alteration
Q00637602-I1
08/15/2025
Signed off — Alteration
Horizontal Enlargement of Existing 2-story 1-family House including foundation and structural work.
Q00642283-I1
08/14/2025
Signed off — Alteration
PLUMBING PLANS FILED IN CONJUNCTION WITH DOB APPLICATION Q00661109. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00661109-I1
07/15/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/11/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/20/2025
Permit issued — Plumbing
Q00661109-I1-PL
06/22/2022
Filed — Alteration
Horizontal Enlargement of Existing 2-story 1-family House including foundation and structural work.
Q00642283-P1
06/22/2022
Violation issued (ECB, closed)
Construction
06/22/2022
Special inspection requirement — Metering
Younes Abouyaala
06/22/2022
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
06/22/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
06/22/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Younes Abouyaala
06/22/2022
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
06/22/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
06/22/2022
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
06/22/2022
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
06/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/22/2022
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
06/22/2022
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
06/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/22/2022
Special inspection requirement — Footing and Foundation
Younes Abouyaala
06/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/22/2022
Special inspection requirement — Final
NAVEEN KUMAR
06/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
06/22/2022
Special inspection requirement — Preliminary
Younes Abouyaala
06/22/2022
Special inspection requirement — Exterior lighting power
Younes Abouyaala
06/22/2022
Special inspection requirement — Fenestration areas
Younes Abouyaala
06/22/2022
Special inspection requirement — Lighting controls
Younes Abouyaala
06/22/2022
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
06/22/2022
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
06/22/2022
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
06/22/2022
Special inspection requirement — Interior lighting power
Younes Abouyaala
06/22/2022
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
06/22/2022
Special inspection requirement — Permanent certificate
Younes Abouyaala
06/22/2022
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
06/22/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
06/21/2022
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
06/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/14/2022
Permit issued — Plumbing
Q00661109-I1-PL
06/09/2022
Filed — Alteration
PLUMBING PLANS FILED IN CONJUNCTION WITH DOB APPLICATION Q00661109. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00661109-I1
05/13/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/13/2022
Permit issued — General Construction
Q00642283-I1-GC-CX
02/22/2022
Filed — Alteration
Horizontal Enlargement of Existing 2-story 1-family House including foundation and structural work.
Q00642283-I1
11/30/2021
Filed — Alteration
Q00637602-I1
11/30/2021
Permit issued — Construction Fence
Q00637602-I1-FN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAUSTIN PLBG & HTG CO.INC06/20/2025
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING06/14/2022
DOB NOWGeneral ConstructionSigned-offREMAX CONSTRUCTION LLC04/13/2022
DOB NOWConstruction FenceSigned-offREMAX CONSTRUCTION LLC11/30/2021
1 project · most recent 05/24/2022
General Wiring
FiledStatusContractorScope
05/24/2022Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/15/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
06/22/2022MeteringYounes Abouyaalaenergy_progress
06/22/2022Structural Steel - DetailsYounes Abouyaalaspecial
06/22/2022Structural Steel - High Strength BoltingYounes Abouyaalaspecial
06/22/2022Subsurface Conditions – Fill Placement & In-Place DensityYounes Abouyaalaspecial
06/22/2022Subgrade InspectionsYounes Abouyaalaspecial
06/22/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
06/22/2022Structural Cold-Formed SteelYounes Abouyaalaspecial
06/22/2022Concrete - Cast-In-PlaceYounes Abouyaalaspecial
06/22/2022Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
06/22/2022Structural Steel - WeldingYounes Abouyaalaspecial
06/22/2022Post-installed AnchorsYounes Abouyaalaspecial
06/22/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
06/22/2022Footing and FoundationYounes Abouyaalaprogress
06/22/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
06/22/2022FinalNAVEEN KUMARprogress
06/22/2022Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
06/22/2022PreliminaryYounes Abouyaalaprogress
06/22/2022Exterior lighting powerYounes Abouyaalaenergy_progress
06/22/2022Fenestration areasYounes Abouyaalaenergy_progress
06/22/2022Lighting controlsYounes Abouyaalaenergy_progress
06/22/2022Lighting in dwelling unitsYounes Abouyaalaenergy_progress
06/22/2022Fenestration air leakageYounes Abouyaalaenergy_progress
06/22/2022Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
06/22/2022Interior lighting powerYounes Abouyaalaenergy_progress
06/22/2022Insulation placement and R valuesYounes Abouyaalaenergy_progress
Latest 25 of 57.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00637602-I1Request digital key ↗
08/26/2026Q00642283-P1Request digital key ↗
08/26/2026Q00642283-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00642283-P1Open ↗
08/13/2026Q00642283-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00642283-I1Open ↗
08/13/2026Q00642283-P1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q00642283-P1Open ↗
09/02/2026Q00642283-P1Open ↗
09/02/2026Q00642283-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026Q00661109-I1Open ↗
09/02/2026Q00642283-P1Open ↗
09/02/2026Q00642283-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00642283-P1Open ↗
08/26/2026Q00642283-I1Open ↗
08/26/2026Q00661109-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00642283-P1Open ↗
08/26/2026Q00642283-I1Open ↗
08/26/2026Q00661109-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00642283-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00642283-I1Open ↗
08/13/2026Q00642283-P1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00642283-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00642283-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00642283-I1Open ↗
08/13/2026Q00642283-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00642283-P1Open ↗
08/13/2026Q00642283-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00642283-P1Open ↗