← Back
Elevator apt, fireproof without stores
755 10 AVENUE
MANHATTAN · BIN 1087482
💬 Discuss this project
2005Year Built
8Stories
D3Building Class
C6-3Zoning
69,540 sfGross Floor Area
85Units
LL97 CoveredRent Stabilized59 Open Violations 58 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: ENCORE WEST RESIDENCE HDFC · 12,552 sf lot · 5.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRENMAC507/08/2026
WEST 3 EQUITIES904/09/2026
ENCORE WEST RESIDENCE HDFC503/22/2026
HPD 806103/22/2026
TELEBEAM TELE CORP103/21/2026
HPD603/21/2026
ENCORE COMMUNITY SERVICES103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.209/29/2025
HAIDER ENGINEERING, P.E.107/27/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P403/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & C HTG SERVICES, INCPlumbing407/08/2026
BRENMAC CORPGeneral Contractor207/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
AMERICAN RIGGING CORPElectrical103/21/2026
HICKEY, DAVIDElectrical103/21/2026
HEMNATH, BHOOWANESHWARNAUTHElectrical103/21/2026
CLIFTON WALDRONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851209/29/2025
Building Lifecycle
All (86)Filed (3)Permit Issued (6)Signed Off (3)Facade (FISP) (3)Violation (60)Inspection (3)Special Inspection (8)
05/08/2026
Signed off — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS.
M01292352-S1
05/08/2026
Signed off — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS.
M01292352-I1
05/08/2026
Violation issued (HPD, open)
A
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, closed)
C
03/29/2026
Violation issued (HPD, open)
C
03/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/17/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/12/2026
Permit issued — Plumbing
M01292352-S1-PL
02/11/2026
Permit issued — Boiler Equipment
M01292352-I1-BE
10/14/2025
Permit issued — Plumbing
M01292352-S1-PL
10/10/2025
Permit issued — Boiler Equipment
M01292352-I1-BE
09/29/2025
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS.
M01292352-S1
09/29/2025
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS.
M01292352-I1
09/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/24/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
09/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
09/24/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
09/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
09/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
09/02/2025
Violation issued (HPD, open)
A
09/02/2025
Violation issued (HPD, open)
B
06/13/2025
Violation issued (HPD, open)
A
03/11/2025
Violation issued (HPD, closed)
C
02/17/2025
Violation issued (HPD, open)
C
02/17/2025
Violation issued (HPD, open)
C
02/17/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, open)
C
01/24/2025
Violation issued (HPD, closed)
C
01/24/2025
Violation issued (HPD, open)
C
01/14/2025
Violation issued (HPD, closed)
C
11/22/2024
Violation issued (HPD, closed)
I
09/10/2024
Violation issued (FDNY_NOV, closed)
07/01/2024
Violation issued (FDNY_ORDER, closed)
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/22/2024
Violation issued (HPD, open)
C
01/10/2024
Violation issued (HPD, open)
B
11/29/2023
Violation issued (FDNY_NOV, closed)
11/15/2023
Violation issued (HPD, closed)
I
11/10/2023
Violation issued (HPD, open)
C
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (FDNY_NOV, closed)
11/02/2022
Violation issued (HPD, closed)
I
08/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/2022
Violation issued (HPD, open)
A
05/04/2022
Violation issued (HPD, open)
C
05/04/2022
Violation issued (HPD, open)
A
03/09/2022
Violation issued (HPD, closed)
A
11/10/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00056244-I1
06/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP02/12/2026
DOB NOWBoiler EquipmentSigned-offDMC PLBG & HTG CORP02/11/2026
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP10/14/2025
DOB NOWBoiler EquipmentSigned-offDMC PLBG & HTG CORP10/10/2025
DOB NOWSidewalk ShedSigned-offBRENMAC CORP12/17/2019
DOB NOWSidewalk ShedSigned-offBRENMAC CORP07/30/2018
BISOTISSUEDROMO CONSTRUCTION CORP07/16/2020
BISOTISSUEDROMO CONSTRUCTION CORP03/26/2019
BISOTISSUEDROMO CONSTRUCTION CORP07/06/2018
BISBLISSUEDJ.E.S. PLBG & HTG CORP10/02/2006
BISPLISSUEDJ.E.S. PLBG & HTG CORP03/07/2006
BISEQISSUEDUNITED HOISTING CORPORATION01/13/2006
BIS—ISSUEDMONADNOCK CONSTRUCTION IN11/30/2005
BISEQISSUEDSAFWAY SERVS INC10/13/2005
BISEQISSUEDSAFWAY SERVS INC08/04/2005
BISEQISSUEDUNITED HOISTING CORPORATION07/22/2005
BISSDISSUEDJ.E.S. PLBG & HTG CORP04/15/2005
BISPLISSUEDJ.E.S. PLBG & HTG CORP03/11/2005
BISEQISSUEDMONADNOCK CONSTRUCTION IN03/09/2005
BIS—ISSUEDMONADNOCK CONSTRUCTION IN10/19/2004
BISEQISSUEDMONADNOCK CONSTRUCTION IN10/18/2004
BISEQISSUEDLAKHI GENERAL CONTRACTOR02/25/2003
BISEQISSUEDA RUSSO WRECKING INC01/09/2003
BISEQISSUEDA RUSSO WRECKING INC01/09/2003
BISEQISSUEDA RUSSO WRECKING INC01/09/2003
BIS—ISSUEDA RUSSO WRECKING INC.01/09/2003
BIS—ISSUEDA RUSSO WRECKING INC01/09/2003
BISEQISSUEDA RUSSO WRECKING INC.01/09/2003
BISEQISSUEDA. RUSSO WRECKING INC01/08/2003
BISEQISSUEDA. RUSSO WRECKING INC01/08/2003
BIS—ISSUEDA. RUSSO WRECKING INC01/08/2003
BISEQISSUEDLILLY CONSTRUCTION CO. INC.08/04/2000
BISEQISSUEDLILLY CONSTRUCTION07/18/2000
BISEQISSUEDSIDHU CONSTRUCTION, INC.10/14/1998
BISOTISSUEDSONALI CONSTRUCION CO INC09/24/1998
BISEQISSUEDSONALI CONSTRUCION CO INC09/24/1998
1 project · most recent 09/29/2025
Gas
FiledStatusContractorScope
09/29/2025Signed-offA & C HTG SERVICES, INCGas
1 project · most recent 06/26/2018
FiledStatusContractorScope
06/26/2018Permit IssuedBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/17/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/24/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
09/24/2025Heating SystemsLOUIS ARENAspecial
09/24/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
09/24/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
09/24/2025Maintenance informationLOUIS ARENAenergy_progress
09/24/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
09/24/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/25/2018FinalSunil Saigalprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/06/2026M00056244-I1Request digital key ↗
08/21/2026M01292352-I1Request digital key ↗
08/21/2026M01292352-S1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
07/17/2020123214084Open ↗
03/27/2019123214084Open ↗
07/06/2018123214084Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
06/28/2018123214084Open ↗
06/26/2018123214084Open ↗
05/22/2018123214084Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026M01292352-I1Open ↗
08/28/2026M01292352-I1Open ↗
08/28/2026M01292352-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/06/2018123214084Open ↗
06/26/2018123214084Open ↗
05/22/2018123214084Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026M01292352-I1Open ↗
08/21/2026M01292352-S1Open ↗
08/13/2026M00056244-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026M01292352-I1Open ↗
08/28/2026M01292352-I1Open ↗
08/28/2026M01292352-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/26/2018123214084Open ↗
05/22/2018123214084Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/22/2018123214084Open ↗
▸Safety & Tenant Protection5
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist3
08/13/2026M00056244-I1Open ↗
08/13/2026M01292352-S1Open ↗
08/13/2026M01292352-I1Open ↗
▸BISTenant Protection Plan and Notes1
05/22/2018123214084Open ↗
▸BISANTI-HARASSMENT CHECKLIST: CLINTON1
05/22/2018123214084Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026M01292352-I1Open ↗
08/21/2026M01292352-S1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/26/2018123214084Open ↗
05/22/2018123214084Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/15/2021123214084Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/21/2026M01292352-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/15/2021123214084Open ↗
03/12/2021123214084Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M01292352-I1Open ↗
08/13/2026M01292352-S1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/17/2020123214084Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/15/2021123214084Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/15/2021123214084Open ↗
05/22/2018123214084Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
07/17/2020123214084Open ↗
06/26/2018123214084Open ↗
▸BISEFILING COVER SHEET1
05/22/2018123214084Open ↗
▸BISADDITIONAL INFORMATION1
06/28/2018123214084Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/22/2018123214084Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026M00056244-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026M00056244-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00056244-I1Open ↗