← Back
BuildNYC
Elevator apt, fireproof without stores
Encore West Residence
755 10TH AVENUE · BIN 1087482
💬 Discuss this project
2005Year Built
8Stories
D3Building Class
C6-3Zoning
69,540 sfGross Floor Area
85Units
LL97 CoveredRent Stabilized35 Active Violations 34 unresolved · 1 paperwork only 13 likely answered 5 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: Encore West Residence HDFC · 12,552 sf lot · 5.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Heavy duty sidewalk shed4p · 1 filing · 7 docs
CellarWest 3 Equities CORP5p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development3403/21/2026
West 3 Equities904/09/2026
Encore West Residence HDFC703/22/2026
Telebeam Tele103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company209/29/2025
Haider Engineering, P.E107/27/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company403/21/2026
Haider Engineering, P.E103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & C Heating ServicesPlumbing407/08/2026
DA-Will Electric CoElectrical303/21/2026
BrenmacScaffold207/08/2026
Walliccan Electrical ContractingElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851209/29/2025
Building Lifecycle
All (86)Filed (3)Permit Issued (6)Signed Off (3)Facade (FISP) (3)Violation (60)Inspection (3)Special Inspection (8)
05/08/2026
Signed off — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS.
M01292352-S1
05/08/2026
Signed off — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS.
M01292352-I1
05/08/2026
Violation issued (HPD, open)
A
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, open)
C
04/21/2026
Violation issued (HPD, closed)
C
03/29/2026
Violation issued (HPD, open)
C
03/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/17/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/12/2026
Permit issued — Plumbing
M01292352-S1-PL
02/11/2026
Permit issued — Boiler Equipment
M01292352-I1-BE
10/14/2025
Permit issued — Plumbing
M01292352-S1-PL
10/10/2025
Permit issued — Boiler Equipment
M01292352-I1-BE
09/29/2025
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS.
M01292352-S1
09/29/2025
Filed — Alteration
GAS CONNECTION TO REPLACEMENT GAS BOILERS.
M01292352-I1
09/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
09/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/24/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
09/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
09/24/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
09/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
09/02/2025
Violation issued (HPD, open)
A
09/02/2025
Violation issued (HPD, open)
B
06/13/2025
Violation issued (HPD, open)
A
03/11/2025
Violation issued (HPD, closed)
C
02/17/2025
Violation issued (HPD, open)
C
02/17/2025
Violation issued (HPD, closed)
C
02/17/2025
Violation issued (HPD, open)
C
01/29/2025
Violation issued (HPD, open)
C
01/24/2025
Violation issued (HPD, open)
C
01/24/2025
Violation issued (HPD, closed)
C
01/14/2025
Violation issued (HPD, closed)
C
11/22/2024
Violation issued (HPD, closed)
I
09/10/2024
Violation issued (FDNY_NOV, closed)
07/01/2024
Violation issued (FDNY_ORDER, closed)
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/22/2024
Violation issued (HPD, open)
C
01/10/2024
Violation issued (HPD, open)
B
11/29/2023
Violation issued (FDNY_NOV, closed)
11/15/2023
Violation issued (HPD, closed)
I
11/10/2023
Violation issued (HPD, open)
C
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (FDNY_NOV, closed)
11/02/2022
Violation issued (HPD, closed)
I
08/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/2022
Violation issued (HPD, open)
A
05/04/2022
Violation issued (HPD, open)
A
05/04/2022
Violation issued (HPD, open)
C
03/09/2022
Violation issued (HPD, closed)
A
11/10/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00056244-I1
06/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDMC Plumbing & Heating02/12/2026
DOB NOWBoiler EquipmentSigned-offDMC Plumbing & Heating02/11/2026
DOB NOWPlumbingSigned-offDMC Plumbing & Heating10/14/2025
DOB NOWBoiler EquipmentSigned-offDMC Plumbing & Heating10/10/2025
DOB NOWSidewalk ShedSigned-offBrenmac12/17/2019
DOB NOWSidewalk ShedSigned-offBrenmac07/30/2018
BISOTISSUEDRomo Construction07/16/2020
BISOTISSUEDRomo Construction03/26/2019
BISOTISSUEDRomo Construction07/06/2018
BISBLISSUEDJ.E.S. Plumbing & Heating10/02/2006
BISPLISSUEDJ.E.S. Plumbing & Heating03/07/2006
BISEQISSUEDUnited Hoisting01/13/2006
BIS—ISSUEDMonadnock Construction11/30/2005
BISEQISSUEDSafway Servs10/13/2005
BISEQISSUEDSafway Servs08/04/2005
BISEQISSUEDUnited Hoisting07/22/2005
BISSDISSUEDJ.E.S. Plumbing & Heating04/15/2005
BISPLISSUEDJ.E.S. Plumbing & Heating03/11/2005
BISEQISSUEDMonadnock Construction03/09/2005
BIS—ISSUEDMonadnock Construction10/19/2004
BISEQISSUEDMonadnock Construction10/18/2004
BISEQISSUEDLakhi General Contractor02/25/2003
BISEQISSUEDA Russo Wrecking01/09/2003
BISEQISSUEDA Russo Wrecking01/09/2003
BISEQISSUEDA Russo Wrecking01/09/2003
BIS—ISSUEDA Russo Wrecking01/09/2003
BIS—ISSUEDA Russo Wrecking01/09/2003
BISEQISSUEDA Russo Wrecking01/09/2003
BISEQISSUEDA. Russo Wrecking01/08/2003
BISEQISSUEDA. Russo Wrecking01/08/2003
BIS—ISSUEDA. Russo Wrecking01/08/2003
BISEQISSUEDLilly Construction Co08/04/2000
BISEQISSUEDLilly Construction07/18/2000
BISEQISSUEDSidhu Construction10/14/1998
BISOTISSUEDSonali Construcion Co09/24/1998
BISEQISSUEDSonali Construcion Co09/24/1998
1 project · most recent 09/29/2025
Gas
FiledStatusContractorScope
09/29/2025Signed-offA & C Heating ServicesGas
1 project · most recent 06/26/2018
FiledStatusContractorScope
06/26/2018Permit IssuedBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/17/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/24/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
09/24/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
09/24/2025Heating SystemsLOUIS ARENAspecial
09/24/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
09/24/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
09/24/2025Maintenance informationLOUIS ARENAenergy_progress
09/24/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
06/25/2018FinalSunil Saigalprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/06/2026M00056244-I1Request digital key ↗
08/21/2026M01292352-I1Request digital key ↗
08/21/2026M01292352-S1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
07/17/2020123214084Open ↗
03/27/2019123214084Open ↗
07/06/2018123214084Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
06/28/2018123214084Open ↗
06/26/2018123214084Open ↗
05/22/2018123214084Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026M01292352-I1Open ↗
08/28/2026M01292352-I1Open ↗
08/28/2026M01292352-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/06/2018123214084Open ↗
06/26/2018123214084Open ↗
05/22/2018123214084Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026M01292352-I1Open ↗
08/21/2026M01292352-S1Open ↗
08/13/2026M00056244-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026M01292352-I1Open ↗
08/28/2026M01292352-I1Open ↗
08/28/2026M01292352-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/26/2018123214084Open ↗
05/22/2018123214084Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/22/2018123214084Open ↗
▸Safety & Tenant Protection5
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist3
08/13/2026M00056244-I1Open ↗
08/13/2026M01292352-S1Open ↗
08/13/2026M01292352-I1Open ↗
▸BISTenant Protection Plan and Notes1
05/22/2018123214084Open ↗
▸BISANTI-HARASSMENT CHECKLIST: CLINTON1
05/22/2018123214084Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026M01292352-I1Open ↗
08/21/2026M01292352-S1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/26/2018123214084Open ↗
05/22/2018123214084Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/15/2021123214084Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/21/2026M01292352-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/15/2021123214084Open ↗
03/12/2021123214084Open ↗
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M01292352-I1Open ↗
08/13/2026M01292352-S1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/17/2020123214084Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/15/2021123214084Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/15/2021123214084Open ↗
05/22/2018123214084Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
07/17/2020123214084Open ↗
06/26/2018123214084Open ↗
▸BISEFILING COVER SHEET1
05/22/2018123214084Open ↗
▸BISADDITIONAL INFORMATION1
06/28/2018123214084Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/22/2018123214084Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026M00056244-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026M00056244-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00056244-I1Open ↗