| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/11/2026 | Permit Issued | JT MAGEN & COMPANY INC | Air Conditioning Systems, Heating and Air Conditioning Systems | Cooling Hitachi TIWM030B22S 812 CFM · Vrf Indoor ×16 TVAHP0060B21S 3,530 CFM · Vrf Outdoor ×14 PAS-18BUFASDQ1 3,530 CFM · Fan Coil Indoor ×10 TIAH048B22M10H 1,500 CFM · Fan Coil Indoor ×4 TIWM030B23S 812 CFM · Fan Coil Indoor ×4 PAS-24BUFASDQ1 1,935 CFM · Condensing Unit ×2 PPK-B24UFAIDQ 2,235 CFM · Vrf Indoor ×2 RAS-1.5PNNBDH1 2,300 CFM · Condensing Unit ×2 RPK-1.0PNN1DH 500 CFM · Fan Coil Indoor ×2 RPK-1.5PNN1DH 530 CFM · Fan Coil Indoor ×2 RPK-2.0PNN1DH 500 CFM · Vrf Indoor ×2 RPK-3.0PNN1DH 500 CFM · Fan Coil Indoor ×2 Samsung AM036TXMDCH/AA 3,177 CFM · Vrf Outdoor ×2 Mitsubishi Electric PEAD-A30AA7 800 CFM · Fan Coil Indoor ×8 PUY-A30NHA7 1,940 CFM · Condensing Unit ×8 PKA-A24KA7 2 tons · Fan Coil Indoor ×2 PUY-A24NHA7 1,940 CFM · Condensing Unit ×2 Heat / Cool Aaon RNA-070DA3EJBTBA02N0 60 tons · Rooftop Unit ×12 RNA-050DA3EJATBA02N0 45 tons · Rooftop Unit ×6 RNA050DA3EJATBA02N0 45 tons · Rooftop Unit ×6 RNA-040DA3EJATBA01N0 40 tons · Rooftop Unit ×4 RNA030C03EJATAB01N0 25 tons · Rooftop Unit ×2 RNA031DA3EJATBA01N0 30 tons · Rooftop Unit ×2 RNA050DA3EJATBA01N0 46 tons · Rooftop Unit ×2 RNA050D03EJA0BA02NA 50 tons · Rooftop Unit ×9 RNA070D03EJB0BA02NB 70 tons · Rooftop Unit ×6 RNA031D03EJA0B00000 30 tons · Rooftop Unit ×1 RNA040D03EJA0B00000 40 tons · Rooftop Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/22/2026 | Permit Issued | ARIANA CONTRACTING INC | Sprinkler System |
| 06/11/2026 | Signed-off | STAT FIRE SPRINKLER NYC C | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/22/2026 | Permit Issued | COPPER PLUMBING INC | Water/Sanitary |
| 06/11/2026 | Signed-off | BEDROCK PLBG. & HTG., INC | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | Permit Issued | OPTIMAL ELECTRIC, INC | General Wiring |
| 05/11/2026 | Pending Payment | M.C. ELECTRICAL NY INC | General Wiring |
| 02/12/2026 | Complete | SPECTRUM ON BROADWAY-ELEC | — |
| 01/28/2026 | Complete | JAM ELECTRICAL CORP | — |
| 12/05/2025 | Complete | GREEN LIGHT ELECL & MECH | — |
| 11/13/2023 | Complete | TEAM ELECTRIC, INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/11/2026 | Permit Issued | JT MAGEN & COMPANY INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/11/2026 | Permit Issued | JT MAGEN & COMPANY INC | 2,356 panels, 1,390.04 kw, 69,383 roof_area_sqft |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/11/2026 | Permit Issued | JT MAGEN & COMPANY INC | Fence |
| Owner | Filings | Most Recent |
|---|---|---|
| VORNADO REALTY TRUST | 42 | 08/04/2026 |
| NYC ECONOMIC DEVELOPMENT CORP. | 66 | 04/09/2026 |
| NYS DEPARTMENT OF ENVIRONMENTAL CONSERVATION | 1 | 03/22/2026 |
| JT MAGEN COMPANY | 16 | 03/22/2026 |
| COLGATE ENTERPRISE | 4 | 03/21/2026 |
| NYC ECONOMIC DEVELOP | 9 | 03/21/2026 |
| NYCEDC | 25 | 03/21/2026 |
| NYEDC | 4 | 03/21/2026 |
| VORNADO REALTY TRUST-888 7TH AVE | 1 | 03/21/2026 |
| MERCHANDISE MART PROPERTIES | 3 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| SYNC ARCHITECTURE P.C | 3 | 07/30/2026 |
| AMA CONSULTING ENGINEERS, PC | 18 | 06/22/2026 |
| AAI ARCHITECTS, P.C. | 9 | 06/17/2026 |
| ANDREW FORMICHELLA | 15 | 05/07/2026 |
| URBAN INTEGRATIONS | 1 | 05/01/2026 |
| MURDOCH ENGINEERING | 8 | 02/06/2026 |
| PURE POWER ENGINEERING, INC. | 2 | 09/24/2025 |
| MCLAREN ENGINEERING GROUP | 9 | 09/08/2025 |
| RYAN BIGGS CLARK DAVIS | 9 | 08/15/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 2 | 01/06/2025 |
| MD TOHFAZ UDDIN | 1 | 01/02/2025 |
| PHILIP HABIB & ASSOCIATES | 3 | 09/19/2024 |
| JACOBS | 3 | 04/10/2024 |
| HOWARD I. SHAPIRO & ASSOCIATES, P.C | 4 | 10/12/2023 |
| WELLWORTH CONSULTING LLC | 1 | 08/30/2023 |
| LILKER ASSOCIATES CONSULTING ENGINE | 1 | 04/17/2020 |
| S.M. BERGER ARCHITECTURE PC | 14 | 01/02/2020 |
| RIP CONSTRUCTION CONSULTANTS | 1 | 04/08/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| GILLMAN CONSULTING | 74 | 03/21/2026 |
| BUILDING BROTHERS | 32 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 2 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 2 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 28 | 03/21/2026 |
| RIP CC | 2 | 03/21/2026 |
| D R BROWN | 2 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 8 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 14 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JT MAGEN & COMPANY INC | General Contractor | 26 | 07/08/2026 |
| NORTH SHORE NEON SIGN | Scaffold | 8 | 07/08/2026 |
| STAT FIRE SPRINKLER NYC C | Fire Protection | 7 | 07/08/2026 |
| N Y SIGN ART | Scaffold | 6 | 07/08/2026 |
| R. BAKER&SON ALL INDUSTRI | General Contractor | 4 | 04/09/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 4 | 07/08/2026 |
| ANTHONY LUCIANO | Electrical | 2 | 03/21/2026 |
| MARINE PLUMBING & MECH IN | Plumbing | 2 | 07/08/2026 |
| CAPITAL IMPROVEMENT SERVICES | General Contractor | 2 | 06/28/2026 |
| REICON GROUP LLC | General Contractor | 1 | 04/09/2026 |
| TOWER BUIDING GROUP INC | General Contractor | 1 | 07/08/2026 |
| WINICK PRODUCTIONS, LLC | General Contractor | 1 | 08/04/2026 |
| JAVIER VALERA ACERO | Electrical | 1 | 03/21/2026 |
| COPPER PLUMBING INC | Plumbing | 1 | 07/04/2026 |
| MPC PLUMBING & HEATING INC | Plumbing | 1 | 07/08/2026 |
| ARIANA CONTRACTING INC | Fire Protection | 1 | 07/09/2026 |
| FONTAO MANAGEMENT INC | General Contractor | 1 | 07/08/2026 |
| METRO R SERVICES INC | General Contractor | 1 | 04/09/2026 |
| NORTH SHORE NEON SIGN LLC | General Contractor | 1 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 44 | 06/22/2026 |
| LOMBARDO PROF ENGINEERING | 8566 | 2 | 01/06/2025 |
| MP ENGINEERS & ARCHITECTS | 1438 | 3 | 04/10/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 08/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | ARIANA CONTRACTING INC | 07/07/2026 |
| DOB NOW | Plumbing | Permit Issued | COPPER PLUMBING INC | 07/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CAPITAL IMPROVEMENT SERVICES | 06/26/2026 |
| DOB NOW | General Construction | Permit Issued | CAPITAL IMPROVEMENT SERVICES | 06/26/2026 |
| DOB NOW | General Construction | Permit Issued | FONTAO MANAGEMENT INC | 05/05/2026 |
| DOB NOW | Structural | Signed-off | NORTH SHORE NEON SIGN LLC | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 12/16/2025 |
| DOB NOW | Standpipe | Signed-off | STAT FIRE SPRINKLER NYC C | 12/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT MAGEN & COMPANY INC | 11/13/2025 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 11/10/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/24/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/24/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/24/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/24/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/22/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/22/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/22/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 10/22/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 10/22/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 10/22/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/22/2025 |
| DOB NOW | Solar | Signed-off | TOWER BUIDING GROUP INC | 10/10/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 10/07/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 10/07/2025 |
| DOB NOW | Sign | Signed-off | SKANSKA BUILDING INC | 10/07/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT MAGEN & COMPANY INC | 09/30/2025 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 09/30/2025 |
| DOB NOW | Construction Fence | Signed-off | JT MAGEN & COMPANY INC | 09/12/2025 |
| DOB NOW | Standpipe | Signed-off | STAT FIRE SPRINKLER NYC C | 05/13/2025 |
| DOB NOW | Structural | Signed-off | JT MAGEN & COMPANY INC | 04/16/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT MAGEN & COMPANY INC | 04/07/2025 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 04/07/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | METRO R SERVICES INC | 02/12/2025 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 12/12/2024 |
| DOB NOW | Foundation | Permit Issued | JT MAGEN & COMPANY INC | 12/12/2024 |
| DOB NOW | Structural | Signed-off | JT MAGEN & COMPANY INC | 12/12/2024 |
| DOB NOW | Foundation | Permit Issued | JT MAGEN & COMPANY INC | 12/09/2024 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 12/04/2024 |
| DOB NOW | Plumbing | Signed-off | MARINE PLUMBING & MECH IN | 12/03/2024 |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/02/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 07/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/09/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/24/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/12/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 12/08/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 12/03/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 12/01/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/19/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/14/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/28/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/25/2025 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 08/25/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/25/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 05/16/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 05/05/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 05/05/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/03/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/05/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 06/12/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 06/04/2024 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 05/31/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 05/29/2024 | Pass-Final PL - Underground | Pass | View ↗ |
| 05/21/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/23/2026 | Sprayed fire-resistant materials | ALEXIS SCHLESSINGERMAN | special |
| 07/23/2026 | Fenestration and door U-factor and product ratings | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/23/2026 | Protection of exposed foundation insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/23/2026 | Air barrier continuity plan testing | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/23/2026 | Air barrier - visual inspection | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/23/2026 | Insulation placement and R values | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/23/2026 | Vestibules | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/23/2026 | Fenestration air leakage | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/23/2026 | Fenestration areas | ALEXIS SCHLESSINGERMAN | energy_progress |
| 07/23/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 07/23/2026 | Lowest Floor Elevation | ALEXIS SCHLESSINGERMAN | progress |
| 07/23/2026 | Fire-Resistance Rated Construction | ALEXIS SCHLESSINGERMAN | progress |
| 07/23/2026 | Structural Stability – Alterations of existing buildings | ALEXIS SCHLESSINGERMAN | special |
| 07/23/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/23/2026 | Mastic and Intumescent Fire-resistant Coatings | ALEXIS SCHLESSINGERMAN | special |
| 07/23/2026 | Wall Panels, Curtain Walls, and Veneers | ALEXIS SCHLESSINGERMAN | special |
| 07/23/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | ALEXIS SCHLESSINGERMAN | special |
| 06/04/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 06/04/2026 | Seismic Isolation Systems | ALEXIS SCHLESSINGERMAN | special |
| 06/04/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 06/02/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 06/02/2026 | Sprinkler Systems | ALEXIS SCHLESSINGERMAN | special |
| 06/02/2026 | Mechanical Systems | ALEXIS SCHLESSINGERMAN | special |
| 06/02/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 06/02/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |