← Back
BuildNYC
Other college and university
Elizabeth Seton Library
755 WEST 261ST STREET · Name © OpenStreetMap contributors · BIN 2101022
💬 Discuss this project
1956Year Built
3Stories
W6Building Class
R4Zoning
83,366 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Other college and university · 257,775 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2UMSVUnder Construction28p · 1 filing · 17 docs
Floor 1UMSVUnder Construction27p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
College of Mount Saint Vincent1310/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Environetics Group Architects205/11/2026
BD Engineering205/11/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
College of MT St VincentGeneral Contractor309/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Prudigm Engineering Llcu4304305/11/2026
Building Lifecycle
All (60)Filed (4)Permit Issued (3)Signed Off (1)Violation (35)Special Inspection (17)
09/29/2026
Permit issued — Mechanical Systems
X01398059-S1-MS
09/29/2026
Permit issued — General Construction
X01398059-I1-GC
05/11/2026
Filed — Alteration
PROPOSED SAXBY'S CAFE ON SETON LIBRARY. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01398059-I1
05/11/2026
Filed — Alteration
PROPOSED SAXBY'S CAFE ON SETON LIBRARY. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01398059-S1
05/11/2026
Filed — Alteration
PROPOSED SAXBY'S CAFE ON SETON LIBRARY. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01398059-S2
05/07/2026
Special inspection requirement — Ventilation and air distribution system
Naeem Anwar
05/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Naeem Anwar
05/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Naeem Anwar
05/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Naeem Anwar
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
05/07/2026
Special inspection requirement — Interior lighting power
Naeem Anwar
05/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
Naeem Anwar
05/07/2026
Special inspection requirement — Lighting controls
Naeem Anwar
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
05/06/2026
Special inspection requirement — Final
Naeem Anwar
05/06/2026
Special inspection requirement — Mechanical Systems
Naeem Anwar
05/06/2026
Special inspection requirement — Final
Naeem Anwar
05/05/2026
Signed off — Alteration
PROPOSED INTERIOR RENOVATION/UPGRADES FOR REMOVAL OF PARTITION WALLS TO CREATE ADDITIONAL CLASSROOM SPACES AND COMPUTER LABS. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGREES OF OCCUPANCY.
X01341977-I1
02/12/2026
Permit issued — General Construction
X01341977-I1-GC
01/05/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION/UPGRADES FOR REMOVAL OF PARTITION WALLS TO CREATE ADDITIONAL CLASSROOM SPACES AND COMPUTER LABS. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGREES OF OCCUPANCY.
X01341977-I1
01/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Naeem Anwar
01/05/2026
Special inspection requirement — Lighting controls
Naeem Anwar
01/05/2026
Special inspection requirement — Interior lighting power
Naeem Anwar
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
01/05/2026
Special inspection requirement — Final
Naeem Anwar
06/18/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/12/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/03/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/07/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/08/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/02/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/22/2006
Violation issued (FDNY_NOV, closed)
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/19/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/19/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/08/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/22/2001
Violation issued (FDNY_NOV, closed)
01/22/2001
Violation issued (ECB, closed)
Elevators
01/06/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/13/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/13/1997
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/08/1996
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/1995
Violation issued (FDNY_NOV, closed)
04/17/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/15/1993
Violation issued (FDNY_NOV, closed)
04/07/1992
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/1990
Violation issued (FDNY_NOV, closed)
10/12/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCollege of MT St Vincent09/29/2026
DOB NOWGeneral ConstructionSigned-offCollege of MT St Vincent09/29/2026
DOB NOWGeneral ConstructionSigned-offMalek Rakshan Associates02/12/2026
BISOTISSUEDAmerican Solar Partners07/02/2019
BISOTISSUEDNations Roof East02/28/2011
BISPLISSUEDPat Sementa P & H Co03/21/2006
BISMHISSUEDCollege of MT St Vincent12/21/2005
BISFBISSUEDR & M Combustion10/05/1993
BISPLISSUEDWard Mechanical10/05/1993
1 project · most recent 05/11/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/11/2026Permit IssuedCollege of MT St VincentVentilation Systems
Ventilation
Greenheck SQ-120-VG 1,000 CFM · Exhaust Fan ×1
1 project · most recent 05/11/2026
Water/Sanitary
FiledStatusContractorScope
05/11/2026——Water/Sanitary
2 projects · most recent 10/05/2026
FiledStatusContractorScope
10/05/2026Permit IssuedNee Electrical—
12/11/2019CompleteHaugland Energy Group—
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
05/07/2026Ventilation and air distribution systemNaeem Anwarenergy_progress
05/07/2026HVAC-R and service water heating equipmentNaeem Anwarenergy_progress
05/07/2026HVAC-R and service water piping design and insulationNaeem Anwarenergy_progress
05/07/2026HVAC-R and service water heating system controlsNaeem Anwarenergy_progress
05/07/2026Energy Code Compliance InspectionsNaeem Anwarprogress
05/07/2026Interior lighting powerNaeem Anwarenergy_progress
05/07/2026Duct leakage testing, insulation and designNaeem Anwarenergy_progress
05/07/2026Lighting controlsNaeem Anwarenergy_progress
05/07/2026Fire-Resistant Penetrations and JointsNaeem Anwarspecial
05/06/2026FinalNaeem Anwarprogress
05/06/2026Mechanical SystemsNaeem Anwarspecial
05/06/2026FinalNaeem Anwarprogress
01/05/2026Fire-Resistance Rated ConstructionNaeem Anwarprogress
01/05/2026Lighting controlsNaeem Anwarenergy_progress
01/05/2026Interior lighting powerNaeem Anwarenergy_progress
01/05/2026Fire-Resistant Penetrations and JointsNaeem Anwarspecial
01/05/2026FinalNaeem Anwarprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
UMSVEducationFloors 1, 2
Project X01398059 Alteration · Permit Entire · 05/11/2026
Project X01341977 Alteration · LOC Issued · 01/05/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026X01341977-I1Request digital key ↗
08/16/2026X01398059-S2Request digital key ↗
08/16/2026X01398059-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
06/14/2019240249405Open ↗
04/03/2019240249405Open ↗
06/15/2011220088321Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
07/02/2019240249405Open ↗
03/01/2011220088321Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026X01398059-S1Open ↗
09/02/2026X01398059-S1Open ↗
09/02/2026X01398059-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026X01341977-I1Open ↗
08/16/2026X01398059-S1Open ↗
08/16/2026X01398059-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026X01398059-S1Open ↗
08/29/2026X01398059-I1Open ↗
08/26/2026X01341977-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
06/17/2019240249405Open ↗
04/03/2019240249405Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/20/2011220088321Open ↗
10/25/2010220088321Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/25/2010220088321Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/25/2010220088321Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
10/25/2010220088321Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
04/03/2019240249405Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026X01341977-I1Open ↗
08/16/2026X01398059-S1Open ↗
08/16/2026X01398059-S2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/03/2019240249405Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/03/2019240249405Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
06/17/2019240249405Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/03/2019240249405Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/16/2026X01398059-S1Open ↗
08/16/2026X01398059-S2Open ↗
08/16/2026X01398059-I1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
10/25/2010220088321Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/25/2010220088321Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/20/2011220088321Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
06/17/2019240249405Open ↗
04/03/2019240249405Open ↗
06/20/2011220088321Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
06/21/2019240249405Open ↗
06/17/2019240249405Open ↗
▸BISEFILING COVER SHEET1
10/25/2010220088321Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/03/2019240249405Open ↗