← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Stevenson Commons
755 WHITE PLAINS ROAD · BIN 2092718
💬 Discuss this project
1977Year Built
6Stories
D7Building Class
R6Zoning
1,021,752 sfGross Floor Area
953Units
LL97 CoveredRent Stabilized75 Active Violations 63 unresolved · 12 paperwork only 2 likely answered 1 old, status unconfirmed ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: Stevenson Commons Housing Company · 301,882 sf lot · 3.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCamber Property GroupUnder Construction6p · 3 filings · 8 docs
BulkheadCamber Property Group1p · 1 filing · 3 docs
Floor 1Commercial vent hood installation in deli1p · 1 filing · 3 docs
CellarNew Age plumbing work1 filing · 4 docs
Filed — no permit issuedStevenson Commons11p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stevenson Commons Affordable3303/21/2026
Camber Property Group803/22/2026
Grenadier Realty303/21/2026
Bruckner Plaza Pharmacy203/21/2026
Dolphin Property Services108/29/2026
NYC Department of Housing Preservation and Development103/21/2026
City103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sandeep Gunnala Engineering109/03/2026
Lingineering Consulting107/15/2026
New Age107/08/2026
Billah Engineering112/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Insha Building Consultants203/21/2026
Smep Design & Consultation203/21/2026
SMN Consulting Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dream Team ElectricalElectrical103/21/2026
WCK ElectricElectrical103/21/2026
KLK ElectricElectrical103/21/2026
Green Power ElectricElectrical103/21/2026
Medra Exhaust SystemsGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lingineering Consulting E5666107/15/2026
New Age Engineering7746107/08/2026
RI Consulting Services8904101/16/2024
Janha Building Ideas6129112/13/2023
Billah Engineering5838112/07/2021
Building Lifecycle
All (102)Filed (7)Permit Issued (5)Signed Off (3)Facade (FISP) (13)Violation (60)Objection (6)Special Inspection (8)
09/03/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01445454-I1
07/20/2026
Signed off — Alteration
X01358718-I1
07/15/2026
Filed — Alteration
Selective repair of brick replacement and concrete eyebrow patching.
X01424837-I1
07/08/2026
Filed — Alteration
FILING FOR CAP & REMOVAL OF BOILER UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS
X01402714-I1
07/06/2026
Special inspection requirement — Masonry
Chingyuan Lin
07/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Chingyuan Lin
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chingyuan Lin
07/06/2026
Special inspection requirement — Concrete - Cast-In-Place
Chingyuan Lin
06/30/2026
Special inspection requirement — Final
Chingyuan Lin
05/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
04/21/2026
Violation issued (HPD, closed)
B
04/21/2026
Violation issued (HPD, closed)
C
03/19/2026
Violation issued (HPD, closed)
C
03/19/2026
Violation issued (HPD, closed)
B
02/23/2026
Permit issued — Suspended Scaffold
X01358718-I1-SC
02/18/2026
Filed — Alteration
X01358718-I1
02/02/2026
Violation issued (HPD, open)
B
02/02/2026
Violation issued (HPD, open)
C
02/02/2026
Violation issued (HPD, open)
A
02/02/2026
Violation issued (HPD, open)
B
12/24/2025
Violation issued (HPD, closed)
B
12/24/2025
Violation issued (HPD, closed)
B
12/24/2025
Violation issued (HPD, closed)
B
12/24/2025
Violation issued (HPD, closed)
B
12/05/2025
Violation issued (HPD, closed)
C
11/18/2025
Violation issued (HPD, closed)
I
11/17/2025
Violation issued (HPD, closed)
B
11/17/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
B
11/17/2025
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
B
11/17/2025
Violation issued (HPD, closed)
A
11/17/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
C
11/07/2025
Violation issued (HPD, closed)
C
11/06/2025
Violation issued (HPD, open)
B
11/06/2025
Violation issued (HPD, open)
C
11/06/2025
Violation issued (HPD, open)
C
11/06/2025
Violation issued (HPD, open)
B
11/06/2025
Violation issued (HPD, open)
B
10/24/2025
Violation issued (ECB, open)
Construction
10/15/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
C
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
B
07/02/2025
Violation issued (ECB, open)
Construction
03/21/2025
Violation issued (HPD, closed)
A
03/21/2025
Violation issued (HPD, closed)
A
10/24/2024
Violation issued (HPD, closed)
B
10/24/2024
Violation issued (HPD, closed)
B
10/24/2024
Violation issued (HPD, closed)
B
10/24/2024
Violation issued (HPD, closed)
B
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation S02/23/2026
DOB NOWSuspended ScaffoldPermit IssuedCHK Construction02/27/2024
DOB NOWSuspended ScaffoldPermit IssuedCHK Construction01/29/2024
DOB NOWSuspended ScaffoldPermit IssuedCHK Construction01/26/2024
DOB NOWMechanical SystemsPermit IssuedMedra Exhaust Systems01/07/2022
BISEQISSUEDJ.k.construction New York05/22/2025
BISOTISSUEDMeridian Construction Group06/24/2023
BISEQISSUEDParsons Construction05/26/2023
BISOTISSUEDMeridian Construction Group07/07/2022
BISEQISSUEDParsons Construction04/15/2022
BISOTISSUEDMeridian Construction Group03/12/2021
BISOTISSUEDJ.S. Maintenance N.Y10/27/2020
BISEQISSUEDParsons Construction10/14/2020
BISBLISSUEDTradeline Plumbing06/25/2019
BISPLISSUEDTradeline Plumbing04/12/2019
BISPLISSUEDTT Mechanical03/20/2019
BISOTISSUEDMDG Design & Construction02/07/2019
BISOTISSUEDMDG Design & Construction02/07/2019
BISMHISSUEDMDG Design & Construction02/07/2019
BISEQISSUEDParsons Construction08/28/2018
BISMHISSUEDMDG Design & Construction02/13/2018
BISOTISSUEDMDG Design & Construction02/13/2018
BISOTISSUEDMDG Design & Construction02/13/2018
BISPLISSUEDTT Mechanical01/25/2018
BISEQISSUEDMDG Design & Construction09/20/2017
BISOTISSUEDMDG Design & Construction08/28/2017
BISEQISSUEDParsons Construction08/14/2017
BISEQISSUEDBilly Enterprises06/05/2017
BISOTISSUEDMDG Design & Construction02/23/2017
BISMHISSUEDMDG Design & Construction02/23/2017
BISMHISSUEDJKN Construction03/03/2014
BISEQISSUEDSpring Scaffolding01/16/2014
BISEQISSUEDSpring Scaffolding04/30/2013
BISOTISSUEDA L Eastmond & Sons10/01/2012
BISPLISSUEDRaptor Mechanical09/19/2012
BISPLISSUEDRaptor Mechanical03/15/2012
BISPLISSUEDRaptor Mechanical06/23/2011
BISMHISSUEDAegis Energy Services06/15/2011
BISOTISSUEDCrescent Eastern Gen Con05/01/2009
BISEQISSUEDOutdoor Installations03/19/2009
+ 11 more permits on file
1 project · most recent 12/07/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/07/2021Permit IssuedMedra Exhaust SystemsVentilation Systems
Ventilation
Captiveaire NCA16FA 2,800 CFM · Kitchen Exhaust ×1
1 project · most recent 07/08/2026
Gas
FiledStatusContractorScope
07/08/2026——Gas
4 projects · most recent 09/22/2020
General Wiring Boiler Controls
FiledStatusContractorScope
09/22/2020CompleteKLK ElectricGeneral Wiring
09/06/2019Permit IssuedAngler Electric—
10/06/2018Permit IssuedAngler ElectricBoiler Controls
12/06/2017Permit IssuedAngler Electric—
1 project · most recent 09/03/2026
Sidewalk Shed
FiledStatusContractorScope
09/03/2026——Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/06/2026MasonryChingyuan Linspecial
07/06/2026Tenant Protection Plan ComplianceChingyuan Linspecial
07/06/2026Structural Stability – Alterations of existing buildingsChingyuan Linspecial
07/06/2026Concrete - Cast-In-PlaceChingyuan Linspecial
06/30/2026FinalChingyuan Linprogress
05/14/2026Tenant Protection Plan ComplianceStephen Shishkospecial
12/13/2023Post-installed AnchorsKAMRUZ ZAMANspecial
12/13/2023Alternative Materials - OTCR Buildings Bulletin NumberKAMRUZ ZAMANspecial
▾Documents — 328 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/15/2026X01445454-I1Request digital key ↗
08/21/2026X00990211-I1Request digital key ↗
08/17/2026X01358718-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits82
▸BISPLAN / WORK APPROVAL APPLICATION38
12/18/2025220632153Open ↗
05/29/2025220604978Open ↗
12/05/2023220604978Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION35
05/30/2023220604978Open ↗
04/18/2022220604978Open ↗
03/12/2021220632153Open ↗
Showing 3 of 35 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications7
08/10/2020220556529Open ↗
08/07/2020220556529Open ↗
10/12/2018240198772Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/29/2025220604978Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
08/10/2020220632153Open ↗
▸Seals & Professional Certifications61
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
03/06/2020220651827Open ↗
08/01/2019220556510Open ↗
10/12/2018240198772Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
08/14/2017220604978Open ↗
08/07/2017220609544Open ↗
06/05/2017220600213Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
06/24/2019240257155Open ↗
09/18/2017240198772Open ↗
08/14/2017220604978Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/15/2026X01445454-I1Open ↗
08/25/2026X00640082-I1Open ↗
08/16/2026X01402714-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026X01424837-I1Open ↗
08/26/2026X01402714-I1Open ↗
08/23/2026X00976333-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
06/24/2019240257155Open ↗
09/18/2017240198772Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/24/2019240257155Open ↗
09/18/2017240198772Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026X01424837-I1Open ↗
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING6
06/24/2019240257155Open ↗
Showing 1 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/13/2020220556529Open ↗
09/21/2015220360605Open ↗
▸BISEQUIPMENT USE PERMITS2
08/13/2020220556529Open ↗
09/21/2015220360605Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/24/2019240257155Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/07/2017220609544Open ↗
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes9
08/25/2020220651827Open ↗
04/30/2018220632153Open ↗
08/14/2017220604978Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
08/25/2020220651827Open ↗
03/06/2020220651827Open ↗
06/24/2019240257155Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026X01424837-I1Open ↗
08/15/2026X00640082-I1Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
03/06/2020220651827Open ↗
10/30/2019220556529Open ↗
10/21/2019220556529Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/13/2020220556529Open ↗
07/13/2020220556529Open ↗
05/14/2020220609544Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/13/2020220556529Open ↗
05/14/2020220609544Open ↗
08/01/2019220556510Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/24/2019240257155Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
08/25/2020220651827Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/20/2021220651827Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/13/2020220556529Open ↗
07/13/2020220556529Open ↗
05/14/2020220609544Open ↗
Showing 3 of 5 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/25/2020220651827Open ↗
▸Approvals, Objections & Sign-offs40
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
12/23/2025220632153Open ↗
12/22/2021220651827Open ↗
08/13/2020220556529Open ↗
Showing 3 of 14 on file for this type
▸BISSHED LETTER10
05/29/2025220604978Open ↗
05/29/2025220604978Open ↗
05/30/2023220604978Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
05/30/2023220604978Open ↗
04/18/2022220604978Open ↗
08/25/2020220651827Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER2
05/29/2025220604978Open ↗
04/15/2019220123426Open ↗
▸BISFINAL1
12/20/2021220651827Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/16/2026X01402714-I1Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT17
12/20/2021220651827Open ↗
07/13/2020220556529Open ↗
05/14/2020220609544Open ↗
Showing 3 of 17 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
08/25/2020220651827Open ↗
▸Filing & Intake Forms37
▸BISEFILING COVER SHEET14
03/06/2020220651827Open ↗
01/23/2018220632153Open ↗
08/14/2017220604978Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION11
12/23/2025220632153Open ↗
12/05/2023220604978Open ↗
07/08/2021220651827Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM9
05/29/2025220604978Open ↗
05/30/2023220604978Open ↗
04/18/2022220604978Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
06/24/2019240257155Open ↗
09/18/2017240198772Open ↗
Showing 2 of 3 on file for this type
▸Other Documents7
▸DOB NOWManufacturer's Specifications2
08/13/2026X00976333-I1Open ↗
08/13/2026X00990211-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X00976333-I1Open ↗
08/13/2026X00990211-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHPD: CONH PILOT1
02/24/2020220556529Open ↗
▸DOB NOWIRA Certification1
08/13/2026X01358718-I1Open ↗