← Back
Two stories - detached, small or mid-size
756 WOODROW ROAD
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5080798
💬 Discuss this project
1965Year Built
1Stories
A1Building Class
R3XZoning
2,450 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,656 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
Electrical
Roof5p · 1 filing · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC206/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272206/10/2024
Building Lifecycle
All (4)Filed (2)Permit Issued (1)Signed Off (1)
10/15/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01042550-I1
06/10/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01042550-P1
05/10/2024
Permit issued — Solar
S01042550-I1-SL
05/02/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01042550-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/10/2024
BISOTISSUEDSUNRUN INSTALLATION SVC05/20/2019
2 projects · most recent 05/02/2024
FiledStatusContractorScope
05/02/2024CompleteSUNRUN SOLAR ELECTL CORP—
05/21/2019CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/10/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/10/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/10/2024Energy Code Compliance InspectionsWalid Abdullaprogress
06/10/2024FinalWalid Abdullaprogress
06/10/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
05/31/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/31/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/31/2024Energy Code Compliance InspectionsWalid Abdullaprogress
05/31/2024FinalWalid Abdullaprogress
05/31/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S01042550-P1Request digital key ↗
08/21/2026S01042550-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/17/2019540164686Open ↗
▸BISWORK PERMIT APPLICATION1
05/17/2019540164686Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026S01042550-P1Open ↗
08/29/2026S01042550-P1Open ↗
08/29/2026S01042550-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026S01042550-P1Open ↗
08/29/2026S01042550-P1Open ↗
08/25/2026S01042550-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026S01042550-I1Open ↗
08/13/2026S01042550-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/17/2019540164686Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/17/2019540164686Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/17/2019540164686Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
05/17/2019540164686Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026S01042550-I1Open ↗
08/13/2026S01042550-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/17/2019540164686Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/26/2019540164686Open ↗
05/17/2019540164686Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/26/2019540164686Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
06/26/2019540164686Open ↗
▸BISNYCECC ANALYSIS1
05/17/2019540164686Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
05/17/2019540164686Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/17/2019540164686Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/26/2019540164686Open ↗
05/17/2019540164686Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/26/2019540164686Open ↗
05/17/2019540164686Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
06/26/2019540164686Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/26/2019540164686Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01042550-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/26/2019540164686Open ↗
05/17/2019540164686Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
05/17/2019540164686Open ↗