← Back
Multi-story retail building (2+)
758 4 AVENUE
BROOKLYN · Sunset Park (West) · BIN 3009581
💬 Discuss this project
1941Year Built
2Stories
K2Building Class
M1-2DZoning
3,400 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: 750 4TH AVENUE LLC · 1,714 sf lot · 1.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof2p · 2 filings · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
H L GENERAL CONTRACTORS6607/08/2026
750 4TH AVENUE807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAALBAKI&ASSOCIATES ENGINEERING, PC2208/22/2023
LEON SKVIRSKY PE202/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B A INSPECTIONS4403/21/2026
BUILDING BROTHERS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H.L. GENERAL CONTRACTORSGeneral Contractor1507/08/2026
KCM PLUMBING & HEATING COPlumbing507/08/2026
PAUL SIGNSScaffold207/08/2026
SWITCH ELECT OF THE FIVEElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BZINSPECTION8294708/22/2023
BAALBAKI&ASSOCIATES ENGIN18581106/26/2023
Building Lifecycle
All (130)Filed (24)Permit Issued (18)Signed Off (9)Violation (3)Inspection (8)Objection (38)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/15/2023
Signed off — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING. NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00644619-I1
11/15/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH JOB # B00644619-I1
B00690254-I1
11/15/2023
Signed off — Alteration
INSTALLING CONSTRUCTION FENCE IN CONJUNCTION WITH JOB# B00644619-I1
B00689465-I1
11/09/2023
Signed off — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING. NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00644619-S2
11/03/2023
Signed off — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING. NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00644619-S1
10/31/2023
Signed off — Alteration
SUBSEQUENT FILING TO REFLECT # OF BOILERS AS PER INSPECTOR REQUIRMENTS
B00697258-S1
10/31/2023
Signed off — Alteration
SUBSEQUENT FILING TO REFLECT # OF BOILERS AS PER INSPECTOR REQUIRMENTS
B00697258-I1
10/25/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/13/2023
Permit issued — Boiler Equipment
B00697258-S1-BE
10/10/2023
Permit issued — General Construction
B00644619-I1-GC
08/22/2023
Filed — Alteration
SUBSEQUENT FILING TO REFLECT # OF BOILERS AS PER INSPECTOR REQUIRMENTS
B00697258-P9
08/22/2023
Filed — Alteration
SUBSEQUENT FILING TO REFLECT # OF BOILERS AS PER INSPECTOR REQUIRMENTS
B00697258-P8
08/12/2023
Special inspection requirement — Heating Systems
Barry Berg
06/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohammad Baalbaki
06/26/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH JOB # B00644619-I1
B00690254-P3
06/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohammad Baalbaki
06/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Mohammad Baalbaki
06/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
Mohammad Baalbaki
06/15/2023
Special inspection requirement — Mechanical Systems
Barry Berg
06/15/2023
Special inspection requirement — Final
JOHN MALVASIO
06/15/2023
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
06/15/2023
Special inspection requirement — Maintenance information
Mohammad Baalbaki
06/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
Mohammad Baalbaki
06/14/2023
Objection resolved — Addressed
06/06/2023
Objection raised — Fire_Protection
06/06/2023
Objection resolved — Addressed
06/06/2023
Objection raised — Scope
06/06/2023
Special inspection requirement — Final
JOHN MALVASIO
06/06/2023
Special inspection requirement — Structural Steel - Details
Mohammad Baalbaki
06/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mohammad Baalbaki
06/03/2023
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING. NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00644619-P3
06/03/2023
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BUILDING. NO CHANGE TO EGRESS, OCCUPANCY, OR USE.
B00644619-P4
05/16/2023
Filed — Alteration
SUBSEQUENT FILING TO REFLECT # OF BOILERS AS PER INSPECTOR REQUIRMENTS
B00697258-P7
05/16/2023
Filed — Alteration
SUBSEQUENT FILING TO REFLECT # OF BOILERS AS PER INSPECTOR REQUIRMENTS
B00697258-P6
05/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
Mohammad Baalbaki
05/16/2023
Special inspection requirement — Heating Systems
Barry Berg
05/16/2023
Special inspection requirement — Mechanical Systems
Barry Berg
05/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
05/16/2023
Special inspection requirement — Final
JOHN MALVASIO
05/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Mohammad Baalbaki
05/16/2023
Special inspection requirement — Maintenance information
Mohammad Baalbaki
05/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
Mohammad Baalbaki
05/05/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
05/02/2023
Permit issued — General Construction
B00644619-I1-GC
04/28/2023
Filed — Alteration
SUBSEQUENT FILING TO REFLECT # OF BOILERS AS PER INSPECTOR REQUIRMENTS
B00697258-P4
04/28/2023
Filed — Alteration
SUBSEQUENT FILING TO REFLECT # OF BOILERS AS PER INSPECTOR REQUIRMENTS
B00697258-P5
04/28/2023
Special inspection requirement — Heating Systems
Barry Berg
04/24/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Mohammad Baalbaki
04/24/2023
Special inspection requirement — Lighting controls
Mohammad Baalbaki
04/24/2023
Special inspection requirement — Fenestration air leakage
Mohammad Baalbaki
04/24/2023
Special inspection requirement — Interior lighting power
Mohammad Baalbaki
04/24/2023
Special inspection requirement — Insulation placement and R values
Mohammad Baalbaki
04/24/2023
Special inspection requirement — Air barrier - visual inspection
Mohammad Baalbaki
04/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
04/24/2023
Special inspection requirement — Fenestration areas
Mohammad Baalbaki
04/19/2023
Objection raised — Other
04/19/2023
Objection resolved — Addressed
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offKCM PLUMBING & HEATING CO10/13/2023
DOB NOWGeneral ConstructionSigned-offH.L. GENERAL CONTRACTORS10/10/2023
DOB NOWGeneral ConstructionSigned-offH.L. GENERAL CONTRACTORS05/02/2023
DOB NOWSignSigned-offPAUL SIGNS, INC02/11/2023
DOB NOWSignSigned-offPAUL SIGNS, INC02/11/2023
DOB NOWBoiler EquipmentSigned-offKCM PLUMBING & HEATING CO12/23/2022
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO12/23/2022
DOB NOWBoiler EquipmentSigned-offKCM PLUMBING & HEATING CO11/16/2022
DOB NOWStructuralSigned-offH.L. GENERAL CONTRACTORS10/06/2022
DOB NOWGeneral ConstructionSigned-offH.L. GENERAL CONTRACTORS10/06/2022
DOB NOWMechanical SystemsSigned-offH.L. GENERAL CONTRACTORS10/06/2022
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO09/16/2022
DOB NOWStructuralSigned-offH.L. GENERAL CONTRACTORS09/15/2022
DOB NOWMechanical SystemsSigned-offH.L. GENERAL CONTRACTORS08/22/2022
DOB NOWGeneral ConstructionSigned-offH.L. GENERAL CONTRACTORS04/29/2022
DOB NOWConstruction FenceSigned-offH.L. GENERAL CONTRACTORS04/29/2022
DOB NOWConstruction FenceSigned-offH.L. GENERAL CONTRACTORS03/16/2022
DOB NOWGeneral ConstructionSigned-offH.L. GENERAL CONTRACTORS03/10/2022
1 project · most recent 10/05/2023
General Wiring
FiledStatusContractorScope
10/05/2023CompleteSWITCH ELECT OF THE FIVEGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
05/05/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
03/15/2023Fail-Final Boiler Equipment InspectionFailView ↗
02/21/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/21/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
01/31/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/11/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
08/12/2023Heating SystemsBarry Bergspecial
06/28/2023Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
06/26/2023Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
06/15/2023HVAC-R and service water piping design and insulationMohammad Baalbakienergy_progress
06/15/2023HVAC-R and service water heating equipmentMohammad Baalbakienergy_progress
06/15/2023Mechanical SystemsBarry Bergspecial
06/15/2023FinalJOHN MALVASIOprogress
06/15/2023Energy Code Compliance InspectionsMohammad Baalbakiprogress
06/15/2023Maintenance informationMohammad Baalbakienergy_progress
06/15/2023HVAC-R and service water heating system controlsMohammad Baalbakienergy_progress
06/06/2023FinalJOHN MALVASIOprogress
06/06/2023Structural Steel - DetailsMohammad Baalbakispecial
06/06/2023Structural Stability – Alterations of existing buildingsMohammad Baalbakispecial
05/16/2023HVAC-R and service water heating system controlsMohammad Baalbakienergy_progress
05/16/2023Heating SystemsBarry Bergspecial
05/16/2023Mechanical SystemsBarry Bergspecial
05/16/2023Energy Code Compliance InspectionsMohammad Baalbakiprogress
05/16/2023FinalJOHN MALVASIOprogress
05/16/2023HVAC-R and service water piping design and insulationMohammad Baalbakienergy_progress
05/16/2023Maintenance informationMohammad Baalbakienergy_progress
05/16/2023HVAC-R and service water heating equipmentMohammad Baalbakienergy_progress
04/28/2023Heating SystemsBarry Bergspecial
04/24/2023Fenestration and door U-factor and product ratingsMohammad Baalbakienergy_progress
04/24/2023Lighting controlsMohammad Baalbakienergy_progress
04/24/2023Fenestration air leakageMohammad Baalbakienergy_progress
Latest 25 of 54.
▾Documents — 124 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/31/2026B00644619-P1Request digital key ↗
08/31/2026B00644619-P4Request digital key ↗
08/31/2026B00644619-S1Request digital key ↗
Showing 3 of 24 on file for this type
▸Seals & Professional Certifications78
▸DOB NOWProgress Inspector Seal & Signature32
09/23/2026B00644619-S2Open ↗
09/23/2026B00644619-S2Open ↗
09/01/2026B00644619-S1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/31/2026B00644619-P1Open ↗
08/31/2026B00644619-P2Open ↗
08/31/2026B00644619-P3Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/23/2026B00644619-S2Open ↗
09/01/2026B00690254-P1Open ↗
09/01/2026B00644619-S1Open ↗
Showing 3 of 22 on file for this type
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
08/31/2026B00644619-P1Open ↗
08/31/2026B00644619-P4Open ↗
08/31/2026B00644619-S1Open ↗
Showing 3 of 20 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00644619-S2Open ↗
08/13/2026B00644619-I1Open ↗