1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: GETZ PLAZA CORP. · 48,232 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof1p · 1 filing · 4 docs
Floor 13p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAGONA LANDSCAPING.LTD303/22/2026
MASSI STATEN ISLAND LLC203/22/2026
GETZ PLAZA1803/21/2026
TOMMY JHON DEVELOPMENT403/21/2026
ANDREW KATZ ENGINEERING103/21/2026
GETZ103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC510/30/2025
C&P DESIGN CONSULTANTS105/10/2025
ROGERS CALVANICO GROUP PLLC104/02/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIBENEDETTO HTG & AIR CONDIT.General Contractor204/09/2026
MONELLO ENTERPRISES INCGeneral Contractor204/09/2026
K-10 ELECTRIC CORPElectrical103/22/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
R.S.F. PLBG & HTG CORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216207/03/2025
A TECH ENGINEERING NYC, P6738106/23/2025
C&P DESIGN CONSULTANT8472105/10/2025
Building Lifecycle
All (60)Filed (7)Permit Issued (7)Signed Off (6)Violation (7)Inspection (8)Objection (10)Special Inspection (15)
03/02/2026
Signed off — Alteration
1)REPLACEMENT OF TWO (2) EXISTING ROOFTOP UNITS WITH NEW AND RECONNECTION TO EXISTING DUCTWORK AND CONTROLS.
S01203920-I1
02/12/2026
Permit issued — Mechanical Systems
S01203920-I1-MS
02/04/2026
Signed off — Alteration
S01244577-I1
12/30/2025
Signed off — Alteration
INSTALL NEW MAIN DUCT AND BRANCH DUCTS AND INSTALL A NEW ERV SYSTEM FOR FRESH AIR ALL ON THE FIRST FLOOR.
S01245422-I1
12/22/2025
Permit issued — Mechanical Systems
S01245422-I1-MS
12/19/2025
Signed off — Alteration
CAP AND REMOVE EXISTING COOKING EQUIPMENT AND SANITARY FIXTURES USED FOR THE BAKERY AND BAGEL SHOP AND INSTALL NEW 2- NEW TOILETS AND 2-NEW LAVS. ON THE FIRST FLOOR FOR THE NEW PHYSICAL THERAPY SPACE.
S01244782-I1
11/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/24/2025
Signed off — Alteration
RELOCATE 1- SPRINKLER HEAD AND INSTALL 2- NEW ADDITIONAL HEADS ON THE FIRST FLOOR.
S01244789-I1
11/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2025
Filed — Alteration
CAP AND REMOVE EXISTING COOKING EQUIPMENT AND SANITARY FIXTURES USED FOR THE BAKERY AND BAGEL SHOP AND INSTALL NEW 2- NEW TOILETS AND 2-NEW LAVS. ON THE FIRST FLOOR FOR THE NEW PHYSICAL THERAPY SPACE.
S01244782-P1
09/24/2025
Permit issued — Mechanical Systems
S01203920-I1-MS
09/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/21/2025
Permit issued — Sprinklers
S01244789-I1-EW-SP
07/16/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/07/2025
Permit issued — General Construction
S01244577-I1-GC
07/03/2025
Filed — Alteration
INSTALL NEW MAIN DUCT AND BRANCH DUCTS AND INSTALL A NEW ERV SYSTEM FOR FRESH AIR ALL ON THE FIRST FLOOR.
S01245422-I1
07/03/2025
Objection resolved — Addressed
07/03/2025
Objection resolved — Addressed
07/03/2025
Objection resolved — Addressed
06/26/2025
Permit issued — Plumbing
S01244782-I1-PL
06/23/2025
Filed — Alteration
S01244577-I1
06/23/2025
Filed — Alteration
CAP AND REMOVE EXISTING COOKING EQUIPMENT AND SANITARY FIXTURES USED FOR THE BAKERY AND BAGEL SHOP AND INSTALL NEW 2- NEW TOILETS AND 2-NEW LAVS. ON THE FIRST FLOOR FOR THE NEW PHYSICAL THERAPY SPACE.
S01244782-I1
06/23/2025
Filed — Alteration
RELOCATE 1- SPRINKLER HEAD AND INSTALL 2- NEW ADDITIONAL HEADS ON THE FIRST FLOOR.
S01244789-I1
06/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
06/23/2025
Special inspection requirement — Final
Steven Savino
06/23/2025
Special inspection requirement — Mechanical Systems
Steven Savino
06/20/2025
Special inspection requirement — Sprinkler Systems
anthony santoro
05/19/2025
Objection raised — Zoning
05/19/2025
Objection raised — Mechanical
05/19/2025
Objection raised — Scope
05/19/2025
Objection raised — Fire_Protection
05/19/2025
Objection raised — Mechanical
05/10/2025
Filed — Alteration
1)REPLACEMENT OF TWO (2) EXISTING ROOFTOP UNITS WITH NEW AND RECONNECTION TO EXISTING DUCTWORK AND CONTROLS.
S01203920-I1
05/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
05/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
05/10/2025
Special inspection requirement — Shutoff dampers
Stanislav Pilipenko
05/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
05/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
05/10/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
05/10/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
04/29/2025
Signed off — Alteration
ALTERATION FILING TO REMOVE SHOWER AND RELATED PLUMBING ROM EXISTING STORAGE AREA. WORK RELATED TO ECB VIOLATION # 39070490Z, 30970489L.
S01203518-I1
04/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
04/22/2025
Permit issued — Plumbing
S01203518-I1-PL
04/02/2025
Filed — Alteration
ALTERATION FILING TO REMOVE SHOWER AND RELATED PLUMBING ROM EXISTING STORAGE AREA. WORK RELATED TO ECB VIOLATION # 39070490Z, 30970489L.
S01203518-I1
04/01/2025
Special inspection requirement — Final
Stanislav Pilipenko
04/01/2025
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
11/16/2023
Violation issued (FDNY_NOV, closed)
09/20/2022
Violation issued (ECB, closed)
Construction
09/20/2022
Violation issued (ECB, closed)
Construction
06/16/2022
Violation issued (FDNY_NOV, closed)
04/06/2021
Violation issued (FDNY_NOV, closed)
03/03/2020
Violation issued (FDNY_NOV, closed)
01/20/2010
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDIBENEDETTO HTG AIR CON02/12/2026
DOB NOWMechanical SystemsSigned-offMONELLO ENTERPRISES INC12/22/2025
DOB NOWMechanical SystemsSigned-offDIBENEDETTO HTG AIR CON09/24/2025
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP07/21/2025
DOB NOWGeneral ConstructionSigned-offMONELLO ENTERPRISES INC07/07/2025
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/26/2025
DOB NOWPlumbingSigned-offR.S.F. PLBG & HTG CORP.04/22/2025
BISMHISSUEDAFGO MECHANICAL SVCS INC07/26/2018
BISPLISSUEDACCURATE PLG & HTG CORP11/02/2005
BISPLISSUEDACCURATE PLBG & HTG CORP.09/02/2005
BISOTISSUEDCAMPA CONSTRUCTION CORP08/16/2005
BISPLISSUEDAAA PLUMBING & HTNG LLC07/13/2005
BISFPISSUEDIDEAL FIRE SYSTEMS. INC04/01/2005
BISSPISSUEDVILLAGE P & H NY INC12/29/2004
BISPLISSUEDVILLAGE P & H NY INC12/20/2004
BIS—ISSUEDKAM CONSTRUCTION SERVICES10/05/2004
BISEQISSUEDKAM CONSTRUCTION SERVICES10/05/2004
BIS—ISSUEDMAD SIGNS INC09/17/2004
BISOTISSUEDMAD SIGNS INC09/14/2004
BIS—ISSUEDMAD SIGNS INC09/14/2004
BIS—ISSUEDMAUCERI SIGN CO., INC05/20/2004
BIS—ISSUEDMAUCERI SIGN CO., INC05/20/2004
BIS—ISSUEDMAUCERI SIGN CO., INC05/03/2004
BIS—ISSUEDMAUCERI SIGN CO., INC05/03/2004
BISPLISSUEDVILLAGE P & H NY INC03/15/2004
BISPLISSUEDVILLAGE P & H NY INC03/15/2004
BIS—ISSUEDKAM CONSTRUCTION SERVICES11/07/2003
3 projects · most recent 12/08/2025
General Wiring
FiledStatusContractorScope
12/08/2025CompleteK-10 ELECTRIC CORPGeneral Wiring
09/09/2024CompleteMANGI ELECTRICAL CORP1 meters, 1 new_meters
09/03/2024CompleteMANGI ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2025Pass-Final PL - UndergroundPassView ↗
04/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/23/2025HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
06/23/2025FinalSteven Savinoprogress
06/23/2025Mechanical SystemsSteven Savinospecial
06/20/2025Sprinkler Systemsanthony santorospecial
05/10/2025HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
05/10/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
05/10/2025Shutoff dampersStanislav Pilipenkoenergy_progress
05/10/2025Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
05/10/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
05/10/2025Maintenance informationStanislav Pilipenkoenergy_progress
05/10/2025Permanent certificateStanislav Pilipenkoenergy_progress
04/24/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
04/24/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
04/01/2025FinalStanislav Pilipenkoprogress
04/01/2025Mechanical SystemsStanislav Pilipenkospecial
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026S01203518-I1Request digital key ↗
08/19/2026S01203920-I1Request digital key ↗
08/19/2026S01244789-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
05/19/2025520211020Open ↗
07/25/2018540149828Open ↗
10/22/2014520211020Open ↗
▸BISWORK PERMIT APPLICATION1
07/25/2018540149828Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/19/2026S01203920-I1Open ↗
08/19/2026S01244789-I1Open ↗
08/19/2026S01244577-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026S01203920-I1Open ↗
08/25/2026S01203920-I1Open ↗
08/23/2026S01245422-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026S01244789-I1Open ↗
08/25/2026S01203920-I1Open ↗
08/23/2026S01245422-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/24/2019540149828Open ↗
10/22/2014520211020Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/25/2018540149828Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/25/2018540149828Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/25/2018540149828Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
04/18/2016520211020Open ↗
▸BISEQUIPMENT USE PERMITS1
12/24/2019540149828Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/24/2019540149828Open ↗
10/22/2014520211020Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/25/2018540149828Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/24/2019540149828Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/25/2018540149828Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/25/2018540149828Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/16/2025520211020Open ↗
12/24/2019540149828Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/24/2019540149828Open ↗
12/24/2019540149828Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/22/2014520211020Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
12/24/2019540149828Open ↗
07/25/2018540149828Open ↗
10/22/2014520211020Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/03/2025520211020Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
07/25/2018540149828Open ↗
▸BISEFILING COVER SHEET1
10/22/2014520211020Open ↗
▸BISBOROUGH INTAKE FORM1
12/24/2019540149828Open ↗