← Back
Two family brick
759 48 STREET
BROOKLYN · BIN 3012443
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R6BZoning
2,272 sfGross Floor Area
2Units
Two family brick · 2,003 sf lot · 1.13 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 22p · 2 filings · 16 docs
Floor 12p · 2 filings · 16 docs
Basement7p · 2 filings · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/25/2025$1.4M—Private party → Private party$615/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI612/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394312/04/2025
Building Lifecycle
All (18)Filed (6)Permit Issued (2)Signed Off (2)Inspection (2)Special Inspection (6)
02/18/2026
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, COMBINED BOILERS AND HOT WATER HEATER IN BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01256940-I1
12/24/2025
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REMOVE FRONT YARD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01256937-I1
12/22/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/04/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, COMBINED BOILERS AND HOT WATER HEATER IN BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01256940-P2
12/04/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REMOVE FRONT YARD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01256937-P2
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
12/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/09/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REMOVE FRONT YARD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01256937-P1
09/09/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, COMBINED BOILERS AND HOT WATER HEATER IN BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01256940-P1
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/09/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
08/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/31/2025
Permit issued — Plumbing
B01256940-I1-PL
07/21/2025
Permit issued — General Construction
B01256937-I1-GC
07/17/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, COMBINED BOILERS AND HOT WATER HEATER IN BASEMENT; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01256940-I1
07/17/2025
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK;REMOVE FRONT YARD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01256937-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L PLUMBING INC07/31/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC07/21/2025
1 project · most recent 07/31/2025
General Wiring
FiledStatusContractorScope
07/31/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/22/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/04/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
12/04/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
12/04/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
09/09/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/09/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/09/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026B01256940-P2Request digital key ↗
08/20/2026B01256940-P1Request digital key ↗
08/20/2026B01256940-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026B01256940-P1Open ↗
08/20/2026B01256940-P2Open ↗
08/20/2026B01256940-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B01256937-P1Open ↗
08/23/2026B01256937-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01256937-P1Open ↗
08/23/2026B01256937-P2Open ↗