← Back
Five to six families
759 52 STREET
BROOKLYN · BIN 3013777
💬 Discuss this project
1907Year Built
3Stories
C2Building Class
R6BZoning
3,016 sfGross Floor Area
6Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: 759 JC PENNY REALTY LLC · 2,003 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Floor 22p · 1 filing · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
759 JC PENNY REALTY1507/08/2026
OWNER: 759 52ND STREET103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/16/2022$1.6M—— → —$524/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S M TAM ARCHITECT, PLLC501/08/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ERIC & NG ELEC'L, INC.Electrical103/22/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
CROWN PLUMBING INCPlumbing107/08/2026
NEW YORK STANDARD MECH CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NTD ENGINEERING CONSULTAN7634501/08/2024
Building Lifecycle
All (80)Filed (5)Permit Issued (3)Signed Off (2)Violation (34)Inspection (4)Objection (2)Special Inspection (30)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/08/2024
Violation issued (HPD, open)
A
02/07/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATION AT PARTIAL CELLAR, 1ST AND 2ND FLOOR WITH MINOR PARTITION AS PER PLAN. COMBINES 2 DWELLING UNITS TO CHANGE FROM 6 FAMILY TO 5 FAMILY BUILDING AS PER PLAN AND T.P.P.N NOTICE #3 OF 1997. PROPOSED MECHANICAL WORK AS PER PLAN.
B00786279-I1
01/26/2024
Signed off — Alteration
PROPOSED PLUMBING WORK WHICH INCLUDES WATER/SANITARY WORK AND GAS PIPING WORK OF INSTALLING WATER CLOSETS, SINKS, LAVATORIES, SHOWER, STOVE AND COMBINED BOILERS @ CELLAR, 1ST AND 2ND FLOOR AS PER PLAN.
B00789155-I1
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LI-YUAN LIN
01/24/2024
Special inspection requirement — Mechanical Systems
LI-YUAN LIN
01/24/2024
Special inspection requirement — Energy Code Compliance Inspections
LI-YUAN LIN
01/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
LI-YUAN LIN
01/24/2024
Special inspection requirement — Final
LI-YUAN LIN
01/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LI-YUAN LIN
01/24/2024
Special inspection requirement — Maintenance information
LI-YUAN LIN
01/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
LI-YUAN LIN
01/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
LI-YUAN LIN
01/24/2024
Special inspection requirement — Interior lighting power
LI-YUAN LIN
01/08/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT PARTIAL CELLAR, 1ST AND 2ND FLOOR WITH MINOR PARTITION AS PER PLAN. COMBINES 2 DWELLING UNITS TO CHANGE FROM 6 FAMILY TO 5 FAMILY BUILDING AS PER PLAN AND T.P.P.N NOTICE #3 OF 1997. PROPOSED MECHANICAL WORK AS PER PLAN.
B00786279-P3
01/03/2024
Special inspection requirement — Final
LI-YUAN LIN
01/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LI-YUAN LIN
01/03/2024
Special inspection requirement — Mechanical Systems
LI-YUAN LIN
01/03/2024
Special inspection requirement — Energy Code Compliance Inspections
LI-YUAN LIN
01/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
LI-YUAN LIN
01/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LI-YUAN LIN
01/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
LI-YUAN LIN
01/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
LI-YUAN LIN
01/03/2024
Special inspection requirement — Interior lighting power
LI-YUAN LIN
01/03/2024
Special inspection requirement — Maintenance information
LI-YUAN LIN
11/21/2023
Violation issued (HPD, closed)
I
11/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
LI-YUAN LIN
11/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LI-YUAN LIN
11/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
LI-YUAN LIN
11/13/2023
Special inspection requirement — Maintenance information
LI-YUAN LIN
11/08/2023
Filed — Alteration
PROPOSED PLUMBING WORK WHICH INCLUDES WATER/SANITARY WORK AND GAS PIPING WORK OF INSTALLING WATER CLOSETS, SINKS, LAVATORIES, SHOWER, STOVE AND COMBINED BOILERS @ CELLAR, 1ST AND 2ND FLOOR AS PER PLAN.
B00789155-P1
11/06/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT PARTIAL CELLAR, 1ST AND 2ND FLOOR WITH MINOR PARTITION AS PER PLAN. COMBINES 2 DWELLING UNITS TO CHANGE FROM 6 FAMILY TO 5 FAMILY BUILDING AS PER PLAN AND T.P.P.N NOTICE #3 OF 1997. PROPOSED MECHANICAL WORK AS PER PLAN.
B00786279-P1
10/26/2023
Permit issued — Plumbing
B00789155-I1-PL
08/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LI-YUAN LIN
08/30/2023
Special inspection requirement — Mechanical Systems
LI-YUAN LIN
08/30/2023
Special inspection requirement — Energy Code Compliance Inspections
LI-YUAN LIN
08/30/2023
Special inspection requirement — Final
LI-YUAN LIN
08/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
LI-YUAN LIN
08/30/2023
Special inspection requirement — Interior lighting power
LI-YUAN LIN
06/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/02/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2023
Permit issued — Plumbing
B00789155-I1-PL
03/20/2023
Violation issued (HPD, open)
A
02/21/2023
Permit issued — General Construction
B00786279-I1-GC-CX
01/09/2023
Filed — Alteration
PROPOSED PLUMBING WORK WHICH INCLUDES WATER/SANITARY WORK AND GAS PIPING WORK OF INSTALLING WATER CLOSETS, SINKS, LAVATORIES, SHOWER, STOVE AND COMBINED BOILERS @ CELLAR, 1ST AND 2ND FLOOR AS PER PLAN.
B00789155-I1
11/10/2022
Violation issued (HPD, closed)
I
10/05/2022
Objection raised — Other
10/05/2022
Objection resolved — Addressed
09/30/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT PARTIAL CELLAR, 1ST AND 2ND FLOOR WITH MINOR PARTITION AS PER PLAN. COMBINES 2 DWELLING UNITS TO CHANGE FROM 6 FAMILY TO 5 FAMILY BUILDING AS PER PLAN AND T.P.P.N NOTICE #3 OF 1997. PROPOSED MECHANICAL WORK AS PER PLAN.
B00786279-I1
02/22/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, open)
A
04/06/2021
Violation issued (HPD, open)
A
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROWN PLUMBING INC10/26/2023
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP04/05/2023
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC02/21/2023
1 project · most recent 03/30/2023
General Wiring
FiledStatusContractorScope
03/30/2023CompleteERIC & NG ELEC'L, INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/02/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
01/24/2024Fire-Resistant Penetrations and JointsLI-YUAN LINspecial
01/24/2024Mechanical SystemsLI-YUAN LINspecial
01/24/2024Energy Code Compliance InspectionsLI-YUAN LINprogress
01/24/2024Fire-Resistance Rated ConstructionLI-YUAN LINprogress
01/24/2024FinalLI-YUAN LINprogress
01/24/2024HVAC-R and service water piping design and insulationLI-YUAN LINenergy_progress
01/24/2024Maintenance informationLI-YUAN LINenergy_progress
01/24/2024HVAC-R and service water heating equipmentLI-YUAN LINenergy_progress
01/24/2024HVAC-R and service water heating system controlsLI-YUAN LINenergy_progress
01/24/2024Interior lighting powerLI-YUAN LINenergy_progress
01/03/2024FinalLI-YUAN LINprogress
01/03/2024Fire-Resistant Penetrations and JointsLI-YUAN LINspecial
01/03/2024Mechanical SystemsLI-YUAN LINspecial
01/03/2024Energy Code Compliance InspectionsLI-YUAN LINprogress
01/03/2024Fire-Resistance Rated ConstructionLI-YUAN LINprogress
01/03/2024HVAC-R and service water piping design and insulationLI-YUAN LINenergy_progress
01/03/2024HVAC-R and service water heating system controlsLI-YUAN LINenergy_progress
01/03/2024HVAC-R and service water heating equipmentLI-YUAN LINenergy_progress
01/03/2024Interior lighting powerLI-YUAN LINenergy_progress
01/03/2024Maintenance informationLI-YUAN LINenergy_progress
11/13/2023HVAC-R and service water heating system controlsLI-YUAN LINenergy_progress
11/13/2023Fire-Resistant Penetrations and JointsLI-YUAN LINspecial
11/13/2023HVAC-R and service water heating equipmentLI-YUAN LINenergy_progress
11/13/2023Maintenance informationLI-YUAN LINenergy_progress
08/30/2023Fire-Resistant Penetrations and JointsLI-YUAN LINspecial
Latest 25 of 34.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026B00786279-P3Request digital key ↗
08/28/2026B00786279-P1Request digital key ↗
08/26/2026B00789155-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature27
09/19/2026B00786279-P3Open ↗
09/19/2026B00786279-P3Open ↗
09/19/2026B00786279-P3Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/19/2026B00786279-P3Open ↗
09/19/2026B00786279-P3Open ↗
08/29/2026B00786279-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026B00786279-P3Open ↗
08/28/2026B00786279-P1Open ↗
08/28/2026B00786279-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026B00786279-P3Open ↗
08/28/2026B00786279-P1Open ↗
08/26/2026B00789155-I1Open ↗
Showing 3 of 5 on file for this type