HPD05/07/2026(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs website, www.NYC.gov\HPD, search bed bugs.
ECB11/06/2025Facade in disrepair, missing mortar throughout parapet level have vertical stress crack approx 4 ft long by 1/2 inch wide, exposure 1 and 4 corner has capping stone detached resting on leaning/bulging bricks, r$12K due
ECB11/06/2025Failure to certify corrections for violation 39128293Z, comply with commissioner's order$12K due
ECB11/06/2025Failure to certify corrections for violation 39128294K, file a certificate of correction$6K due
ECB07/15/2025A8 unapproved /unsafe/unsuitable electrical equipment apparatus materals devices appliances or wiring in use. Flexible cord used as permanent wiring method / extension cord in use, comply with ec; comply with e$4K due
HPD06/12/2025(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs website, www.NYC.gov\HPD, search bed bugs.
ECB11/06/2024Failure to maintain building in code-compliant manner noted: at time of inspection observed visible cracks and missing mortar between joints at exp#2., repair and/or replace$625 due
ECB11/06/2024Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings: violation #35030521K issued on 11/14/2013 for ftm building at time of inspection no coc has$1K due
ECB11/06/2024Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings: violation # 35554315R issued on 06/17/2021 for miscellaneous violation of zoning resolution$1K due
ECB11/06/2024Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings: violation #35554314P issued on 06/17/2021 for occupancy contrary at time of inspection no co$1K due
ECB11/06/2024Work without a permit noted: at time of inspection observed 2 metal and plexiglass structure with electrical wiring, selling plants and flowers attached to facade at exp #1 and #2 no permits on file., obtain al$1K due
ECB10/28/2024Failure to maintain building in code-compliant manner noted: at time of inspection observed visible cracks,loose blocks and missing mortar between joints, parapet wall at exp#1 and #4., repair and/or replace$3K due
ECB10/23/2024Unlawfully working without a permit prior to commencement of work. At time of inspection observed full height partitions creating 6 massage rooms. It was noted no permits were issued for this type of work in do$2K due
ECB10/23/2024Occupancy contrary to that allowed by building department records. DOB c of o #401685495F indicates 2FL be used offices however, 2FL being used as spa contrary to c of o. As per 28-118.3.2 no change shall be ma$2K due
HPD04/16/2024(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs website, www.NYC.gov\HPD, search bed bugs.
HPD03/29/2023(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs website, www.NYC.gov\HPD, search bed bugs.
HPD03/08/2022(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs website, www.NYC.gov\HPD, search bed bugs.
ECB07/09/2021Failure to comply with the commissioners order to file a certificate of correction with the department of buildings for violating conditionscited in nov#35450187P issued 9/20/19 pursuant to 282011;282042;1RCNY1$1K due
ECB07/09/2021Failure to comply with commissioners order to file a certificate of correction with the department of buildings for violating conditions cited nov#35450166X issued on 9/20/19 pursuant to 282011;282042;1RCNY1021$1K due
ECB07/09/2021Failure to comply with the commissioners order to file a certificate of correction with the department of buildings for violating conditionscited in nov#35450168J issued on 9/20/19 pursuant to 282011;282042;1RC$1K due
ECB06/17/2021Occupancy contrary to that allowed by c of o #203243 illegal occupany noted at 2ND floor front occupied as physical culture establishment "massage parlor" with 2 massage rooms and 2 tables.remedy:discontinue il$1K due
HPD04/16/2021(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs website, www.NYC.gov\HPD, search bed bugs.
ECB01/18/2020Occupancy contrary to that allowed by the c of o or building dept records.noted building dept issued c of o #401685495 indicates 2ND floor should be an office at teh time of inspection observed massage parlour$6K due
ECB09/20/2019Zr 73-36 2ND floor occupied as an adult physical culture establishmentand physical culture establisment "indigo spa" massage parlor w/o bsa approved as per zr 12-10.rem: comply eith zoining resolution$6K due
ECB06/17/2021ZR73-36 2ND floor front occupied as an adult physical culture establishment and physical culture establishment(per zr 12-10) massage parlor with 2 massage rooms without bsa approval as required per zr 73-36.remNothing owed — awaiting certificate of correction
ECB03/13/2020Occupancy contrary to that allowed by the cert of occupancy or bldg dept records. Noted: c of o #401685495F indicates 2ND floor lvl occupied as offices. @time of inspection, observed the 2ND floor lvl occupiedNothing owed — awaiting certificate of correction
ECB09/24/2019Work without a permit.work noted:at 2ND fl erected full height partition walls to subdivide floor to massage rooms and barber shop installed water and waste lines for 2 shower rooms,wash machine and chair for sNothing owed — awaiting certificate of correction
ECB09/24/2019At 2ND floor has been occupied as adult physical culture establishment and physical culture establishment-massage parlor"beauty plus"without bsa approval as required per zr 12-10.remedy:discontinue illegal use.Nothing owed — awaiting certificate of correction
ECB09/24/2019Work w/o a permit work noted @2ND floor erected full height partitionswalls to sundivide floor ro massage rooms, plumbing work to create 3PCS bathroom, including waste and water lines installed electrical wirinNothing owed — awaiting certificate of correction
ECB09/20/2019Occupancy contray to that allowed by co#401685495 illegal occupancy noted @2ND floor converted/occupied as phycial culture esbalishment and an adult physical culture establishment "indigo spa" with 6 massageNothing owed — awaiting certificate of correction
ECB11/14/2013Failure to maintain bldg walls or appurtenances: defective window sills & lintels at various location at front of bldg. Remedy: maintain exterior bldg wall.Nothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB07/21/2017The department of buildings intends to revoke all plumbing approvals & permits under laa#420427880 due to suspension of license.stop all wor work immediately except to make site safeIssued 2017; DOB's record still lists it as active
Predominantly retail with other uses · 8,471 sf lot · 1.83 FAR built · Flood zone X