← Back
Two family frame
76-04 267 STREET
QUEENS · BIN 4174079
💬 Discuss this project
1940Year Built
1.75Stories
B2Building Class
R2AZoning
1,384 sfGross Floor Area
2Units
Two family frame · 4,700 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 25p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/14/2024$766K—— → —$554/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRISE CONTRACTING GROUP, INC903/25/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PERSI CONTRACTING CORPGeneral Contractor1107/08/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIRISE CONTRACTING GROUP,8228503/25/2026
AMERILAND BROOK LLC1506203/15/2025
BRIAN ILL DEVELOPMENT LLC1402203/15/2025
Building Lifecycle
All (89)Filed (9)Permit Issued (8)Signed Off (3)Inspection (9)Objection (30)Special Inspection (30)
05/27/2026
Signed off — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q01155972-S3
05/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/16/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/10/2026
Signed off — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q01155972-S2
04/08/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/26/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/25/2026
Filed — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q01155972-P5
03/24/2026
Special inspection requirement — Air barrier — testing
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Permanent certificate
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Ventilation and air distribution system
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Fenestration air leakage
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Insulation placement and R values
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Fenestration areas
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Final
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Metering
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
03/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Footing and Foundation
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Structural Wood Frame
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Structural Steel - Details
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Electric vehicle service equipment requirements
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Subgrade Inspections
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Concrete - Cast-In-Place
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Structural Steel - Welding
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Mechanical Systems
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Masonry
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Heating Systems
ROBERT ERVOLINA
03/24/2026
Special inspection requirement — Interior lighting power
ROBERT ERVOLINA
01/22/2026
Permit issued — Curb Cut
Q01155972-S3-CC
01/17/2026
Filed — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q01155972-P4
01/15/2026
Signed off — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q01155972-S1
01/14/2026
Permit issued — Mechanical Systems
Q01155972-I1-GC-CX
01/12/2026
Permit issued — Construction Fence
Q01155972-S1-FN
01/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/26/2025
Filed — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q01155972-P3
11/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2025
Filed — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q01155972-P2
10/03/2025
Permit issued — Structural
Q01155972-I1-GC-CX
10/01/2025
Permit issued — Construction Fence
Q01155972-S1-FN
07/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2025
Objection resolved — Addressed
07/22/2025
Objection raised — Admin
06/25/2025
Filed — Alteration CO
INSTALL 8' TEMP. CONSTRUCTION FENCE AT THE ABOVE ADDRESS.
Q01155972-P1
06/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/31/2025
Permit issued — Plumbing
Q01155972-S2-PL
03/25/2025
Objection resolved — Addressed
03/25/2025
Objection resolved — Addressed
03/25/2025
Objection resolved — Addressed
03/25/2025
Objection resolved — Addressed
03/24/2025
Permit issued — Foundation
Q01155972-I1-GC-CX
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPERSI CONTRACTING CORP01/22/2026
DOB NOWMechanical SystemsPermit IssuedPERSI CONTRACTING CORP01/14/2026
DOB NOWConstruction FenceSigned-offPERSI CONTRACTING CORP01/12/2026
DOB NOWStructuralPermit IssuedPERSI CONTRACTING CORP10/03/2025
DOB NOWConstruction FenceSigned-offPERSI CONTRACTING CORP10/01/2025
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG03/31/2025
DOB NOWFoundationPermit IssuedPERSI CONTRACTING CORP03/24/2025
DOB NOWConstruction FenceSigned-offPERSI CONTRACTING CORP01/30/2025
1 project · most recent 03/25/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2026Signed-offPERSI CONTRACTING CORPHeating Systems
Heating
A.O. Smith PCG-75 100,000 BTU · Water Heater ×3
Williamson GWA-100-N-T 100,000 BTU · Boiler ×3
1 project · most recent 03/25/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/25/2026Signed-offBELLEROSE PLBG & HTGGas, Storm, Water/Sanitary
1 project · most recent 01/31/2025
General Wiring
FiledStatusContractorScope
01/31/2025CompleteVOLTRON ELECTRIC LLCGeneral Wiring
1 project · most recent 03/25/2026
Masonry Wood
FiledStatusContractorScope
03/25/2026Signed-offPERSI CONTRACTING CORPMasonry, Wood
1 project · most recent 03/25/2026
Fence
FiledStatusContractorScope
03/25/2026Signed-offPERSI CONTRACTING CORPFence
1 project · most recent 03/25/2026
Earthwork
FiledStatusContractorScope
03/25/2026Signed-offPERSI CONTRACTING CORPEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/08/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
03/26/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
01/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
03/24/2026Structural Steel - High Strength BoltingROBERT ERVOLINAspecial
03/24/2026Structural Steel - DetailsROBERT ERVOLINAspecial
03/24/2026Structural Stability – Alterations of existing buildingsROBERT ERVOLINAspecial
03/24/2026Mechanical SystemsROBERT ERVOLINAspecial
03/24/2026MasonryROBERT ERVOLINAspecial
03/24/2026Heating SystemsROBERT ERVOLINAspecial
03/24/2026Fire-Resistant Penetrations and JointsROBERT ERVOLINAspecial
03/24/2026Concrete - Cast-In-PlaceROBERT ERVOLINAspecial
03/24/2026Maintenance informationROBERT ERVOLINAenergy_progress
03/24/2026Interior lighting powerROBERT ERVOLINAenergy_progress
03/24/2026Permanent certificateROBERT ERVOLINAenergy_progress
03/24/2026Insulation placement and R valuesROBERT ERVOLINAenergy_progress
03/24/2026Fenestration and door U-factor and product ratingsROBERT ERVOLINAenergy_progress
03/24/2026Air barrier — testing ROBERT ERVOLINAenergy_progress
03/24/2026Fenestration air leakageROBERT ERVOLINAenergy_progress
03/24/2026Air barrier - visual inspectionROBERT ERVOLINAenergy_progress
03/24/2026Structural Wood FrameROBERT ERVOLINAprogress
03/24/2026Footing and FoundationROBERT ERVOLINAprogress
03/24/2026Fire-Resistance Rated ConstructionROBERT ERVOLINAprogress
03/24/2026FinalROBERT ERVOLINAprogress
03/24/2026Energy Code Compliance InspectionsROBERT ERVOLINAprogress
03/24/2026Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
03/24/2026Subgrade InspectionsROBERT ERVOLINAspecial
03/24/2026Structural Steel - WeldingROBERT ERVOLINAspecial
03/24/2026Ventilation and air distribution systemROBERT ERVOLINAenergy_progress
Latest 25 of 94.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/17/2026Q01155972-S1Request digital key ↗
08/17/2026Q01155972-P4Request digital key ↗
08/17/2026Q01155972-P5Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q01155972-P5Open ↗
08/13/2026Q01155972-I1Open ↗
08/13/2026Q01155972-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026Q01155972-P5Open ↗
08/13/2026Q01155972-P1Open ↗
08/13/2026Q01155972-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q01155972-P1Open ↗
08/13/2026Q01155972-P5Open ↗
08/13/2026Q01155972-I1Open ↗
▸Seals & Professional Certifications70
▸DOB NOWProgress Inspector Seal & Signature35
09/21/2026Q01155972-I1Open ↗
09/21/2026Q01155972-I1Open ↗
09/02/2026Q01155972-P3Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/21/2026Q01155972-I1Open ↗
09/21/2026Q01155972-I1Open ↗
09/21/2026Q01155972-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/17/2026Q01155972-P4Open ↗
08/17/2026Q01155972-P5Open ↗
08/17/2026Q01155972-S3Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q01155972-I1Open ↗
08/13/2026Q01155972-P1Open ↗
08/13/2026Q01155972-P5Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026Q01155972-P3Open ↗
08/17/2026Q01155972-P4Open ↗
08/17/2026Q01155972-P5Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q01155972-P1Open ↗
08/13/2026Q01155972-I1Open ↗
08/13/2026Q01155972-P5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01155972-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026Q01155972-P1Open ↗
08/13/2026Q01155972-P5Open ↗
08/13/2026Q01155972-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q01155972-I1Open ↗
08/13/2026Q01155972-P1Open ↗
08/13/2026Q01155972-P5Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q01155972-I1Open ↗
08/13/2026Q01155972-P1Open ↗
08/13/2026Q01155972-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026Q01155972-P5Open ↗
08/17/2026Q01155972-P1Open ↗
08/17/2026Q01155972-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01155972-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01155972-I1Open ↗