DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB12/31/2009V-DOB VIOLATION - ACTIVE
HPD10/18/2005SECTION 27-2045 ADM CODE - PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS 2STY APT 2
HPD10/18/2005SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
HPD09/19/2005SECTION 27-2045, 2046 ADM CODE PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS ... IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY
HPD04/04/2002SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF UNCAPPED GAS PIPE EAST WALL CENTER 2ND AND 3RD STORY PUBLIC HALL.
HPD04/04/2002SECTION 9, 170, 171, 300, 301, 302 M.D.LAW-FILE PLANS AND APPLICATION AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE CONVERSION FROM A PRIVATE DWELLING TO MULTIPLE DWELLING USE IF LAWFULLY FEASIBLE OR RESTORE TO LAWFUL OCCUPANCY #426306.
ECB04/21/2006FAILURE TO MAINTAIN BLDG THE MAIN STAIR CASE IS SHAKING PARTS OF THE HAND RAILING ARE MISSING HOLES & CRACKS IN THE SHEETROCK AND IN THE CEILING IN THE BATHROOM. REMEDY:REMOVE & REPAIR DEFECTIVE ITEMS.Nothing owed — awaiting certificate of correction
ECB11/05/2005FAILURE TO MAINTAIN BUILDING. NOTED: THE STAIRCASE IS SHAKING. SOME PARTS OF RAILING ARE MISSING, THERE ARE HOLES AND CRACKS IN SHEETROCK PARTITIONS. THERE ARE HOLES AND CRACKS IN SUSPENDED CEILING IN BATHROOM.Nothing owed — awaiting certificate of correction
ECB04/18/2000OCCUPANCY CONTRARY TO THAT ALLOWED ACCORDING TO BUILDING DEPT.'S REVCORDS WHICH INDICATES PREMISES TO BE OCCUPIED AS A STORE.PREMISE NOW OCCUPIED AS A CLASS A APT.REMEDY:DISCONTINUE ILLEGAL OCCUPANCY FORTHWITHNothing owed — awaiting certificate of correction
ECB04/18/2000FAILURE TO PROVIDE AT LEAST 2 MEANS OF EGRESS 1ST FLOOR.STORE HAS ONLY FRONT DOOR.FULL HEIGHT PETITION WALL ERECTED AT REAR OF STORE.REMEDY:TAKE ALL NECESSARY ACTION TO REMEDY FORTHWITHNothing owed — awaiting certificate of correction
ECB04/18/2000FAILURE TO MAINTAIN OBSERVED HANDRAILS LOOSE & SPINDLES MISSING.CRACKED PLASTER IN DANGER OF FALLING.REMEDY;MAKE ALL NECESSARY REPAIRS FORTHWITHNothing owed — awaiting certificate of correction
ECB04/13/2000USE OR INSTALLATION OF PLUMBING MATERIALS ON EQUIPMENT WHICH DO NOT COMPLY WITH RS-16 "PVC PIPE USED IN NAIL SALON .PVC PIPE NOT PERMITTED IN COMMERCIAL SPACES". REMEDY: REMOVE NON-COMPLYING MATERIAL ON EQUIPMNothing owed — awaiting certificate of correction
ECB08/14/1999FAILURE TO PROVIDE AT LEAST 2 MEANS OF EGRESS FROM ROOM OR SPACE. 1STFLR FRONT STORE HAS ONLY 1 MEAN OF EGRESS. FULL HEIGHT PARTITION ERECTED AT REAR WALL OF STORE. REMEDY: TAKE ALL NECESSARY ACTIONS TONothing owed — awaiting certificate of correction
ECB08/14/1999OCCUPANCY CONTRARY TO THAT ALLOWED ACCORDING TO BLDING DEPT RECORDS D O B RECORDS WHICH INDICATES PREMISES TO BE OCCUPIED AS FRIST FL TO BE OCCUPIED AS A STORE BLDING FRIST FL NOW OCCUPIED AS A STORE BLDG FRISTNothing owed — awaiting certificate of correction
ECB08/14/1999WORK WITHOUT PERMIT 1ST FL ERECTED FULL HEIGHT PARTITION SUBDIVIDING FLR INTO SEPAEATE UNITS 1ST FL REAR INSTALLED FULLPLUMBING AND ELECTRCAL SERVICES FOR 3PC BATHRM GAS STOVE KITCHEN SINK ALSO 1ST FL FRONT INNothing owed — awaiting certificate of correction
ECB08/14/1999FAILURE TO MAINTAIN ENTIRE STAIRCASE AND LANDINGS SEVERELY SLOPED AND IN DANGER OF COLAPSE ALSO PLASTER CEILINGS ON 1ST 2ND 2 ACK CRACKED MISSING AND IN DANGER CEILINGS OF COLLAPSE ALSO HANDRAILS AND ARRISTERSNothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 2,068 sf lot · 1.6 FAR built · Flood zone X