BuildNYC
Condo, residential unit in elevator building
Colton Condominium
76-15 35TH AVENUE · Jackson Heights · BIN 4029032
💬 Discuss this project
1939Year Built
6Stories
R4Building Class
R7-1Zoning
99,824 sfGross Floor Area
96Units
LL97 CoveredRent Stabilized20 Active Violations ▸FISP: SAFEFDNY Report ↗
Condo, residential unit in elevator building · 28,000 sf lot · 3.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofColton Condominium project5p · 4 filings · 13 docs
Floor 3Unit 3E6p · 1 filing · 11 docs
Floor 2
Floor 1Unit 1KUnder Construction7p · 2 filings · 5 docs
Site & exteriorColton CondominiumUnder Construction33p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Colton Condominium2409/07/2026
SLJ Property Managment103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Morali Architecture104/21/2026
Bitopi Consultants410/17/2025
Cataldo Properties105/08/2025
MVN Associates111/21/2023
Urban Pioneering Architecture207/09/2021
Richard Koenigsberg104/27/2021
Syed Engineering104/02/2021
KMB Design Group111/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution803/21/2026
Municipal Building Consultants203/21/2026
PS Engineers203/21/2026
Somma Design Consulting203/21/2026
Expediting103/21/2026
AK Consulting Services803/21/2026
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRC ConstructionScaffold809/07/2026
WKR ConstructionGeneral Contractor203/21/2026
Proto Restoration Specialspecialty_contractor207/08/2026
Fast Track Electricspecialty_contractor203/21/2026
Water Dynamic P & HPlumbing207/08/2026
AMS ContractorScaffold107/08/2026
RRP PlumbingPlumbing107/08/2026
Teamwork EnterprisesGeneral Contractor107/08/2026
Paul M. & Son's Electrical ConElectrical103/22/2026
Timothy Coleman LicensedElectrical103/21/2026
Cresco ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Anthony Morali Architect4810104/21/2026
Leo Y Lee Associates2481510/20/2025
Cataldo Engineering2174105/08/2025
Urban Pioneering Architects6521207/09/2021
Koenigsberg Engineering2247104/27/2021
KMB Design Group513111/16/2020
Building Lifecycle
All (157)Filed (17)Permit Issued (19)Signed Off (5)Facade (FISP) (13)Violation (60)Inspection (3)Objection (22)Special Inspection (18)
09/03/2026
Permit issued — Sidewalk Shed
Q01204992-I1-SH
07/21/2026
Permit issued — Sidewalk Shed
Q01204992-I1-SH
06/01/2026
Permit issued — Suspended Scaffold
Q01225153-I1-SC
05/12/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/04/2026
Permit issued — Plumbing
Q01378077-I1-PL
04/28/2026
Permit issued — Sidewalk Shed
Q01204992-I1-SH
04/27/2026
Permit issued — Protection and Mechanical Methods
Q01218938-I1-PMM
04/21/2026
Filed — Alteration
Plumbing fixture work at residential apartment #1K. No change to use, egress or occupancy under this application. Plumbing fixture work previously filed on Alt #402455981 being refiled herewith for sign-off purposes. All physical work previously complete
Q01378077-I1
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY MORALI
11/18/2025
Permit issued — General Construction
Q01216897-I1-GC
10/28/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
10/28/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
10/20/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. Amend #1 added anchors details and hoist spec that was missing in previous filing Amend #2, added protection
Q01225153-P3
10/20/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
10/20/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
10/17/2025
Filed — Alteration
INSTALLATION OF DEBRIS CHUTE AT 76-15 35TH AVENUE, QUEENS, NY 11372 AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01218938-P1
08/28/2025
Permit issued — General Construction
Q01216897-I1-GC
08/21/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 76-15 35TH AVENUE, QUEENS, NY 11372 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01204992-P1
07/08/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. Amend #1 added anchors details and hoist spec that was missing in previous filing Amend #2, added protection
Q01225153-P2
07/08/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
07/08/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
06/24/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. Amend #1 added anchors details and hoist spec that was missing in previous filing Amend #2, added protection
Q01225153-P1
06/24/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
06/24/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
06/17/2025
Permit issued — Suspended Scaffold
Q01225153-I1-SC
05/23/2025
Permit issued — Suspended Scaffold
Q01225153-I1-SC
05/22/2025
Objection raised — Other
05/22/2025
Objection resolved — Addressed
05/21/2025
Permit issued — Protection and Mechanical Methods
Q01218938-I1-PMM
05/20/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. Amend #1 added anchors details and hoist spec that was missing in previous filing Amend #2, added protection
Q01225153-I1
05/19/2025
Filed — Alteration
INSTALLATION OF DEBRIS CHUTE AT 76-15 35TH AVENUE, QUEENS, NY 11372 AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01218938-I1
05/08/2025
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01216897-I1
04/28/2025
Permit issued — Sidewalk Shed
Q01204992-I1-SH
04/28/2025
Special inspection requirement — Final
Thomas Cataldo
04/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Thomas Cataldo
04/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Thomas Cataldo
04/25/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 76-15 35TH AVENUE, QUEENS, NY 11372 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01204992-I1
04/24/2025
Signed off — Alteration
Modification to existing Verizon site. Replace 7 antennas and 6 RRH units, replace 2 equipment cabinets, and install 1 new antenna on roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
Q00369087-I1
12/02/2024
Signed off — Alteration
FILE MATERIAL HOIST
Q00971920-I1
10/12/2024
Violation issued (HPD, open)
C
10/12/2024
Violation issued (HPD, open)
B
10/12/2024
Violation issued (HPD, open)
A
10/12/2024
Violation issued (HPD, open)
B
04/12/2024
Violation issued (HPD, closed)
A
04/10/2024
Violation issued (HPD, open)
B
04/10/2024
Violation issued (HPD, open)
B
04/10/2024
Violation issued (HPD, closed)
A
04/10/2024
Violation issued (HPD, open)
B
04/10/2024
Violation issued (HPD, open)
B
04/10/2024
Violation issued (HPD, open)
B
04/10/2024
Violation issued (HPD, open)
B
04/10/2024
Violation issued (HPD, open)
B
04/10/2024
Violation issued (HPD, open)
B
03/29/2024
Signed off — Alteration
Q00957344-I1
01/05/2024
Permit issued — General Construction
Q00957344-I1-GC
12/29/2023
Permit issued — Suspended Scaffold
Q00971920-I1-SC
12/29/2023
Objection resolved — Addressed
12/27/2023
Objection raised — Other
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPRC Construction09/03/2026
DOB NOWSidewalk ShedPermit IssuedPRC Construction07/21/2026
DOB NOWSuspended ScaffoldPermit IssuedProto Restoration Construction06/01/2026
DOB NOWPlumbingPermit IssuedRRP Plumbing05/04/2026
DOB NOWSidewalk ShedPermit IssuedPRC Construction04/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRC Construction04/27/2026
DOB NOWGeneral ConstructionPermit IssuedProto Restoration Special11/18/2025
DOB NOWGeneral ConstructionPermit IssuedProto Restoration Special08/28/2025
DOB NOWSuspended ScaffoldPermit IssuedProto Restoration Construction06/17/2025
DOB NOWSuspended ScaffoldPermit IssuedProto Restoration Construction05/23/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRC Construction05/21/2025
DOB NOWSidewalk ShedPermit IssuedPRC Construction04/28/2025
DOB NOWGeneral ConstructionSigned-offWKR Construction01/05/2024
DOB NOWSuspended ScaffoldSigned-offWKR Construction12/29/2023
DOB NOWAntennaSigned-offFast Track Electric06/25/2021
DOB NOWPlumbingSigned-offHydro Plumbing & Heating06/24/2021
DOB NOWGeneral ConstructionSigned-offTeamwork Enterprises06/15/2021
DOB NOWPlumbingSigned-offHydro Plumbing & Heating06/01/2021
DOB NOWSidewalk ShedPermit IssuedAMS Contractor05/24/2021
BISOTISSUEDStellar Industries03/10/2021
BISPLISSUEDPasseggio Plumbing & Heating08/16/2018
BISPLISSUEDMako Plumbing & Heating06/29/2015
BISOTISSUEDCel Tech Electric05/15/2015
BISMHISSUEDCel Tech Electric05/15/2015
BISEQISSUEDB H & B Construction06/07/2013
BISOTISSUEDArif Choudhry05/15/2013
BISOTISSUEDSkyline Restoration04/11/2007
BISEQISSUEDEverest Scaffolding04/02/2007
BISOTISSUEDForman Interiors09/15/2006
BISOTISSUEDFlag Waterproofing & Restoration02/20/1997
BISSPISSUEDSanford Stein Consultants04/15/1992
BISOTISSUEDIdc System01/03/1992
BISPLISSUEDOceanview PLG03/21/1991
BISFSISSUEDAbile03/21/1991
1 project · most recent 04/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/21/2026Permit IssuedRRP PlumbingGas, Water/Sanitary
18 projects · most recent 10/07/2026
General Wiring Lighting
FiledStatusContractorScope
10/07/2026CompleteHunter Electric—
07/29/2026CompleteHunter ElectricGeneral Wiring
06/01/2026CompleteHunter ElectricGeneral Wiring
10/07/2025CompleteHunter ElectricGeneral Wiring
07/07/2025CompleteHunter ElectricGeneral Wiring
07/07/2025CompleteHunter ElectricGeneral Wiring
06/30/2025CompleteHunter ElectricGeneral Wiring
06/24/2025Permit IssuedHigh Quality Electric of NYC—
06/18/2025Permit IssuedHigh Quality Electric of NYC—
12/12/2024CompleteHunter ElectricGeneral Wiring
12/05/2024CompleteHunter ElectricGeneral Wiring
11/14/2024CompletePaul M. & Son's Electrical ConGeneral Wiring
10/06/2023CompleteJP & Son ElectricGeneral Wiring
03/31/2021CompleteRichard Neu—
01/08/2020Permit IssuedCresco ElectricalGeneral Wiring
2 projects · most recent 08/21/2025
Sidewalk Shed
FiledStatusContractorScope
08/21/2025Permit IssuedPRC ConstructionSidewalk Shed
04/02/2021Permit IssuedAMS ContractorSidewalk Shed
1 project · most recent 10/20/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/20/2025Permit IssuedProto Restoration ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/12/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
03/25/2026Fire-Resistant Penetrations and JointsANTHONY MORALIspecial
10/28/2025Post-installed AnchorsLeo Leespecial
10/28/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
10/20/2025Post-installed AnchorsLeo Leespecial
10/20/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
07/08/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
07/08/2025Post-installed AnchorsLeo Leespecial
06/24/2025Post-installed AnchorsLeo Leespecial
06/24/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
04/28/2025FinalThomas Cataldoprogress
04/28/2025Tenant Protection Plan ComplianceThomas Cataldospecial
04/28/2025Structural Stability – Alterations of existing buildingsThomas Cataldospecial
08/09/2021Fire-Resistance Rated ConstructionJames Hillprogress
08/09/2021Fire-Resistant Penetrations and JointsJames Hillspecial
04/08/2021Post-installed AnchorsRICHARD KOENIGSBERGspecial
04/08/2021Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
04/08/2021MasonryRICHARD KOENIGSBERGspecial
04/07/2021FinalRICHARD KOENIGSBERGprogress
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
08/27/2026Q00495456-I1Request digital key ↗
08/27/2026Q00499532-I1Request digital key ↗
08/23/2026Q00957344-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/15/2026Q00408677-P1Request digital key ↗
08/14/2026Q00408677-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026Q00369087-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION12
10/29/2025402455981Open ↗
10/27/2025402455981Open ↗
10/24/2025402455981Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION8
03/10/2021440633682Open ↗
02/22/2021440633682Open ↗
09/14/2018421625432Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications50
▸DOB NOWSpecial Inspector Seal & Signature15
10/07/2026Q00499532-I1Open ↗
10/07/2026Q00499532-I1Open ↗
10/07/2026Q00499532-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
01/19/2019421069934Open ↗
04/27/2018421625432Open ↗
02/09/2018421601127Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026Q00408677-I1Open ↗
08/27/2026Q00408677-P1Open ↗
08/27/2026Q00369087-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/27/2018421625432Open ↗
06/12/2013420855417Open ↗
05/09/2013420840969Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
10/07/2026Q00499532-I1Open ↗
08/24/2026Q01216897-I1Open ↗
08/23/2026Q00408677-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/13/2013420855417Open ↗
05/09/2013420840969Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/27/2018421625432Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/09/2020440633682Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/09/2020440633682Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
04/27/2018421625432Open ↗
02/09/2018421601127Open ↗
05/09/2015421069202Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
10/27/2025402455981Open ↗
10/24/2025402455981Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/19/2019421069934Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/24/2022440633682Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
04/15/2015421069934Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/24/2022440633682Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
08/18/2015421069202Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan3
08/13/2026Q00408677-P1Open ↗
08/13/2026Q00408677-I1Open ↗
08/13/2026Q00369087-I1Open ↗
▸BISSTREET TREE CHECKLIST2
10/09/2020440633682Open ↗
02/09/2018421601127Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
10/09/2020440633682Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00499532-I1Open ↗
08/23/2026Q00957344-I1Open ↗
08/15/2026Q00408677-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/09/2020440633682Open ↗
10/09/2020440633682Open ↗
01/16/2015421069202Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
01/19/2019421069934Open ↗
04/27/2018421625432Open ↗
02/09/2018421601127Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/21/2022440633682Open ↗
01/18/2022440633682Open ↗
09/27/2021421069202Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/18/2022440633682Open ↗
09/27/2021421069202Open ↗
▸BISINTERIOR LIGHTING POWER1
01/26/2022440633682Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
10/09/2020440633682Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/26/2022440633682Open ↗
▸BISLIGHTING CONTROLS1
01/26/2022440633682Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/09/2020440633682Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/19/2019421069934Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/28/2025402455981Open ↗
01/21/2022440633682Open ↗
01/18/2022440633682Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/26/2022440633682Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
10/09/2020440633682Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/26/2022440633682Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
06/01/2022440633682Open ↗
09/27/2021421069202Open ↗
05/04/2019421069934Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/15/2015421069934Open ↗
06/13/2013420855417Open ↗
05/09/2013420840969Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/04/2019421069934Open ↗
04/16/2019421069934Open ↗
▸BISFINAL1
01/26/2022440633682Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026Q01216897-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
01/20/2022440633682Open ↗
09/27/2021421069202Open ↗
10/09/2020440633682Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/20/2022440633682Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION7
06/01/2022440633682Open ↗
07/08/2021440633682Open ↗
10/28/2020440633682Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
04/27/2018421625432Open ↗
02/09/2018421601127Open ↗
01/16/2015421069202Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
01/11/2019421069934Open ↗
03/26/2018420840969Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/09/2020440633682Open ↗
▸Other Documents14
▸DOB NOWCalculations5
08/13/2026Q01225153-P3Open ↗
08/13/2026Q00971920-I1Open ↗
08/13/2026Q01225153-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications5
08/13/2026Q00971920-I1Open ↗
08/13/2026Q01225153-P3Open ↗
08/13/2026Q01225153-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDHCR Document3
08/13/2026Q00957344-I1Open ↗
08/13/2026Q00408677-P1Open ↗
08/13/2026Q01216897-I1Open ↗
▸BISDEP CLEARANCE_FOR AIR1
09/27/2021421069202Open ↗