← Back
Cape Cod
76-17 162 STREET
QUEENS · BIN 4148272
💬 Discuss this project
1930Year Built
1.5Stories
A0Building Class
R3-2Zoning
866 sfGross Floor Area
1Units
Cape Cod · Owner of record: FORTUNE 5 LLC · 3,900 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Floor 23p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATOMIC CONTRACTING2407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/17/2025$1.9M—— → —$2,206/sf building
09/06/2024$840K—— → —$970/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC807/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor707/08/2026
RENEW PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108607/07/2025
Building Lifecycle
All (75)Filed (8)Permit Issued (4)Signed Off (3)Inspection (6)Objection (24)Special Inspection (30)
07/18/2025
Objection resolved — Addressed
07/16/2025
Objection raised — Other
07/07/2025
Filed — Alteration CO
THIS APPLICATION IS FILED TO REMOVE EXISTIG CC
Q01126426-P5
07/01/2025
Signed off — Alteration
Q01116742-I1
06/26/2025
Signed off — Alteration CO
THIS APPLICATION IS FILED TO REMOVE EXISTIG CC
Q01126426-S1
06/25/2025
Signed off — Alteration CO
THIS APPLICATION IS FILED TO REMOVE EXISTIG CC
Q01126426-S2
06/25/2025
Special inspection requirement — Ventilation and air distribution system
sion hourizadeh
06/25/2025
Special inspection requirement — Insulation placement and R values
sion hourizadeh
06/25/2025
Special inspection requirement — Fenestration areas
sion hourizadeh
06/25/2025
Special inspection requirement — Protection of exposed foundation insulation
sion hourizadeh
06/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
06/25/2025
Special inspection requirement — Metering
sion hourizadeh
06/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
sion hourizadeh
06/25/2025
Special inspection requirement — Permanent certificate
sion hourizadeh
06/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
06/25/2025
Special inspection requirement — Maintenance information
sion hourizadeh
06/25/2025
Special inspection requirement — Footing and Foundation
sion hourizadeh
06/25/2025
Special inspection requirement — Lighting in dwelling units
sion hourizadeh
06/25/2025
Special inspection requirement — Structural Wood Frame
sion hourizadeh
06/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
06/25/2025
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
06/25/2025
Special inspection requirement — Interior lighting power
sion hourizadeh
06/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
sion hourizadeh
06/25/2025
Special inspection requirement — Fenestration air leakage
sion hourizadeh
06/25/2025
Special inspection requirement — Final
sion hourizadeh
06/25/2025
Special inspection requirement — Electric vehicle service equipment requirements
sion hourizadeh
06/25/2025
Special inspection requirement — Concrete - Cast-In-Place
sion hourizadeh
06/25/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
sion hourizadeh
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
06/25/2025
Special inspection requirement — Heating Systems
sion hourizadeh
06/25/2025
Special inspection requirement — Mechanical Systems
sion hourizadeh
06/25/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
06/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
sion hourizadeh
06/25/2025
Special inspection requirement — Subgrade Inspections
sion hourizadeh
06/25/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
06/25/2025
Special inspection requirement — Air barrier - visual inspection
sion hourizadeh
06/24/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/05/2025
Permit issued — Curb Cut
Q01126426-S2-CC
06/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/22/2025
Objection resolved — Addressed
05/21/2025
Objection raised — Scope
05/05/2025
Filed — Alteration CO
THIS APPLICATION IS FILED TO REMOVE EXISTIG CC
Q01126426-P4
05/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2025
Filed — Alteration CO
THIS APPLICATION IS FILED TO REMOVE EXISTIG CC
Q01126426-P2
03/21/2025
Filed — Alteration CO
THIS APPLICATION IS FILED TO REMOVE EXISTIG CC
Q01126426-P1
03/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/26/2025
Filed — Alteration CO
THIS APPLICATION IS FILED TO REMOVE EXISTIG CC
Q01126426-S2
02/19/2025
Permit issued — Mechanical Systems
Q01126426-I1-GC-CX
02/18/2025
Permit issued — Plumbing
Q01126426-S1-PL
02/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/13/2025
Objection resolved — Addressed
02/13/2025
Objection resolved — Addressed
01/31/2025
Objection resolved — Addressed
01/20/2025
Objection resolved — Addressed
01/13/2025
Objection resolved — Addressed
01/10/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
12/19/2024
Filed — Alteration CO
THIS APPLICATION IS FILED TO REMOVE EXISTIG CC
Q01126426-S1
12/09/2024
Objection resolved — Addressed
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJ&J DESIGNS INC06/05/2025
DOB NOWMechanical SystemsPermit IssuedJ&J DESIGNS INC02/19/2025
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP02/18/2025
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC11/02/2024
BISPLISSUEDPHILLIPS UTILITIE CO04/07/1992
BISOTISSUEDCENTRAL HOME REMODELERS INC03/23/1992
1 project · most recent 07/07/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2025Signed-offJ&J DESIGNS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Blueridge BMM48C 48,000 BTU · Condensing Unit ×6
Ventilation
Delta Breeze SMT150 150 CFM · Exhaust Fan ×12
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×10
1 project · most recent 07/07/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/07/2025Signed-offRENEW PLUMBING CORPGas, Water/Sanitary
1 project · most recent 12/10/2024
General Wiring
FiledStatusContractorScope
12/10/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 07/07/2025
Wood
FiledStatusContractorScope
07/07/2025Signed-offJ&J DESIGNS INCWood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/24/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
06/25/2025Maintenance informationsion hourizadehenergy_progress
06/25/2025Electric vehicle service equipment requirementssion hourizadehenergy_progress
06/25/2025Fenestration and door U-factor and product ratingssion hourizadehenergy_progress
06/25/2025HVAC-R and service water heating equipmentsion hourizadehenergy_progress
06/25/2025HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
06/25/2025Meteringsion hourizadehenergy_progress
06/25/2025Fenestration air leakagesion hourizadehenergy_progress
06/25/2025Air barrier - visual inspectionsion hourizadehenergy_progress
06/25/2025Insulation placement and R valuession hourizadehenergy_progress
06/25/2025Ventilation and air distribution systemsion hourizadehenergy_progress
06/25/2025Permanent certificatesion hourizadehenergy_progress
06/25/2025Protection of exposed foundation insulationsion hourizadehenergy_progress
06/25/2025HVAC-R and service water heating system controlssion hourizadehenergy_progress
06/25/2025Fenestration areassion hourizadehenergy_progress
06/25/2025Energy Code Compliance Inspectionssion hourizadehprogress
06/25/2025Finalsion hourizadehprogress
06/25/2025Fire-Resistance Rated Constructionsion hourizadehprogress
06/25/2025Footing and Foundationsion hourizadehprogress
06/25/2025Structural Wood Framesion hourizadehprogress
06/25/2025Lighting in dwelling unitssion hourizadehenergy_progress
06/25/2025Interior lighting powersion hourizadehenergy_progress
06/25/2025Concrete - Cast-In-Placesion hourizadehspecial
06/25/2025Excavations - Sheeting, Shoring, and Bracingsion hourizadehspecial
06/25/2025Fire-Resistant Penetrations and Jointssion hourizadehspecial
06/25/2025Heating Systemssion hourizadehspecial
Latest 25 of 82.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026Q01116742-I1Request digital key ↗
08/20/2026Q01126426-P5Request digital key ↗
08/20/2026Q01126426-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q01126426-P5Open ↗
08/13/2026Q01126426-I1Open ↗
08/13/2026Q01126426-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026Q01126426-I1Open ↗
08/13/2026Q01126426-P1Open ↗
08/13/2026Q01126426-P5Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01126426-P5Open ↗
08/13/2026Q01126426-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026Q01116742-I1Open ↗
08/20/2026Q01126426-P5Open ↗
08/20/2026Q01126426-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/19/2026Q01126426-P2Open ↗
09/01/2026Q01126426-P1Open ↗
09/01/2026Q01126426-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/19/2026Q01126426-P2Open ↗
09/01/2026Q01126426-P1Open ↗
09/01/2026Q01126426-P1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q01126426-P1Open ↗
08/13/2026Q01126426-P5Open ↗
08/13/2026Q01126426-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/20/2026Q01126426-I1Open ↗
08/20/2026Q01126426-P5Open ↗
08/20/2026Q01126426-P2Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q01126426-P5Open ↗
08/13/2026Q01126426-P1Open ↗
08/13/2026Q01126426-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01126426-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026Q01126426-I1Open ↗
08/13/2026Q01126426-P5Open ↗
08/13/2026Q01126426-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q01126426-I1Open ↗
08/13/2026Q01126426-P1Open ↗
08/13/2026Q01126426-P5Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q01126426-I1Open ↗
08/13/2026Q01126426-P1Open ↗
08/13/2026Q01126426-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q01126426-P5Open ↗
08/20/2026Q01126426-P1Open ↗
08/20/2026Q01126426-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01126426-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01126426-I1Open ↗