← Back
BuildNYC
Church, synagogue, chapel
76 2ND AVENUE
MANHATTAN · East Village · BIN 1006200
💬 Discuss this project
1928Year Built
3Stories
M1Building Class
R7AZoning
6,708 sfGross Floor Area
2Units
2 Active Violations 1 old, status unconfirmed ▸
Church, synagogue, chapel · 2,400 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
ElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSpanish Evangelical Church, Cma5p · 1 filing · 13 docs
Floor 3Spanish Evangelical Church, Cma4p · 1 filing · 13 docs
Floor 2Spanish Evangelical Church, Cma5p · 1 filing · 13 docs
Floor 1Spanish Evangelical Church, Cma4p · 1 filing · 13 docs
CellarSpanish Evangelical Church, Cma5p · 1 filing · 13 docs
Site & exteriorSpanish Evangelical Church, Cma8p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Spanish Evangelical Church Cma1407/08/2026
MRS607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering212/23/2019
Baileys Engineering112/04/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nulite Fuel Oil CoGeneral Contractor307/08/2026
Everest ScaffoldingScaffold307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808212/23/2019
Building Lifecycle
All (20)Filed (3)Permit Issued (4)Signed Off (2)Violation (5)Special Inspection (6)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/26/2019
Signed off — Alteration
INSTALL 8 DUCT-LESS SPLIT AIR CONDITION SYSTEM 1 SYSTEM IN THE CELLAR, 2 SYSTEM ON THE 1ST AND 2ND FLOOR EACH AND 3 SYSTEM IN THE 3RD FLOOR. INSTALL AIR COOLED CONDENSERS ON THE ROOF AND REAR YARD PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00213163-I1
12/24/2019
Special inspection requirement — Mechanical Systems
Joseph Bazini
12/24/2019
Special inspection requirement — Final
Joseph Bazini
12/23/2019
Filed — Alteration
INSTALL 8 DUCT-LESS SPLIT AIR CONDITION SYSTEM 1 SYSTEM IN THE CELLAR, 2 SYSTEM ON THE 1ST AND 2ND FLOOR EACH AND 3 SYSTEM IN THE 3RD FLOOR. INSTALL AIR COOLED CONDENSERS ON THE ROOF AND REAR YARD PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00213163-P1
12/20/2019
Special inspection requirement — Mechanical Systems
Joseph Bazini
12/20/2019
Special inspection requirement — Final
Joseph Bazini
12/20/2019
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
10/23/2019
Permit issued — Mechanical Systems
M00213163-I1-MS
09/25/2019
Permit issued — Mechanical Systems
M00213163-I1-MS
09/23/2019
Filed — Alteration
INSTALL 8 DUCT-LESS SPLIT AIR CONDITION SYSTEM 1 SYSTEM IN THE CELLAR, 2 SYSTEM ON THE 1ST AND 2ND FLOOR EACH AND 3 SYSTEM IN THE 3RD FLOOR. INSTALL AIR COOLED CONDENSERS ON THE ROOF AND REAR YARD PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00213163-I1
07/10/2018
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00003276-I1
03/22/2018
Permit issued — Supported Scaffold
M00003276-I1-SF
12/04/2017
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00003276-I1
12/04/2017
Permit issued — Supported Scaffold
M00003276-I1-SF
11/30/2017
Special inspection requirement — Final
PAUL BAILEY
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNulite Fuel Oil Co10/23/2019
DOB NOWMechanical SystemsSigned-offNulite Fuel Oil Co09/25/2019
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding03/22/2018
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding12/04/2017
BISOTISSUEDJC Contracting Management03/13/2018
BISEQISSUEDEverest Scaffolding01/03/2018
BISEQISSUEDEverest Scaffolding01/05/2017
1 project · most recent 09/21/2018
HVAC Wiring
FiledStatusContractorScope
09/21/2018Permit IssuedDelta Power ElectricalHVAC Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/24/2019Mechanical SystemsJoseph Bazinispecial
12/24/2019FinalJoseph Baziniprogress
12/20/2019Mechanical SystemsJoseph Bazinispecial
12/20/2019FinalJoseph Baziniprogress
12/20/2019HVAC and service water heating equipment Joseph Bazinienergy_progress
11/30/2017FinalPAUL BAILEYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Spanish Evangelical Church, CmaReligiousCellar, Floors 1–3, Roof
Project M00213163 Alteration · LOC Issued · 09/23/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00213163-P1Request digital key ↗
09/05/2026M00213163-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/06/2026M00003276-I1Request digital key ↗
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION4
09/23/2019140865197Open ↗
03/13/2018123294069Open ↗
01/05/2018140591250Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
09/23/2019140865197Open ↗
10/13/2017123294069Open ↗
09/22/2017123294069Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLPC Approval/Permit2
09/05/2026M00213163-I1Open ↗
09/05/2026M00213163-P1Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/10/2020140865197Open ↗
02/13/2020140865197Open ↗
07/19/2018140591250Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026M00213163-I1Open ↗
08/24/2026M00003276-I1Open ↗
08/23/2026M00213163-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
09/23/2019140865197Open ↗
09/22/2017123294069Open ↗
01/04/2017140591250Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/05/2026M00213163-I1Open ↗
09/05/2026M00213163-P1Open ↗
08/13/2026M00003276-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/23/2019140865197Open ↗
01/04/2017140591250Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/23/2019140865197Open ↗
01/04/2017140591250Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026M00213163-I1Open ↗
08/23/2026M00213163-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/22/2017123294069Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/22/2017123294069Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/23/2019140865197Open ↗
10/13/2017123294069Open ↗
09/22/2017123294069Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/05/2026M00213163-P1Open ↗
09/05/2026M00213163-I1Open ↗
08/13/2026M00003276-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
09/18/2017123294069Open ↗
01/04/2017140591250Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
09/03/2024123294069Open ↗
▸DOB NOWOER: Notice to Proceed1
08/13/2026M00003276-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026M00003276-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/10/2020140865197Open ↗
09/22/2017123294069Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/10/2020140865197Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/23/2019140865197Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/23/2019140865197Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/04/2017140591250Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLANDMARKS APPROVAL4
03/10/2020140865197Open ↗
02/06/2020140865197Open ↗
09/22/2017123294069Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/10/2020140865197Open ↗
02/13/2020140865197Open ↗
02/07/2020140865197Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/10/2020140865197Open ↗
02/13/2020140865197Open ↗
02/13/2020140865197Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/05/2026M00213163-P1Open ↗
09/05/2026M00213163-I1Open ↗
08/13/2026M00003276-I1Open ↗
▸BISSHED LETTER1
01/05/2018140591250Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
03/10/2020140865197Open ↗
02/13/2020140865197Open ↗
09/23/2019140865197Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/03/2024123294069Open ↗
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM4
03/10/2020140865197Open ↗
02/13/2020140865197Open ↗
02/07/2020140865197Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/23/2019140865197Open ↗
01/04/2017140591250Open ↗
▸BISADDITIONAL INFORMATION1
07/19/2018140591250Open ↗
▸BISEFILING COVER SHEET1
09/22/2017123294069Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
01/04/2017140591250Open ↗