← Back
BuildNYC
Two family converted from one family
76-36 168TH STREET
QUEENS · BIN 4151527
💬 Discuss this project
1945Year Built
1.5Stories
B3Building Class
R3-2Zoning
2,295 sfGross Floor Area
2Units
Two family converted from one family · 3,935 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Attic7p · 1 filing · 20 docs
Floor 215p · 2 filings · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar7p · 1 filing · 20 docs
Site & exterior8p · 2 filings · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2020$935K—— → —$407/sf building
02/06/2020$910K—Private party → Private party$397/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mehdi Ghazi, P.E606/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ibuild Consulting1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS RenovationGeneral Contractor1307/08/2026
CS RenovationScaffold303/21/2026
Champ Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mehdi Ghazi, P.E7129406/07/2022
Building Lifecycle
All (54)Filed (6)Permit Issued (8)Signed Off (3)Inspection (7)Special Inspection (30)
08/17/2022
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00458437-I1
08/04/2022
Signed off — Alteration
Q00453572-I1
08/03/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/22/2022
Permit issued — Plumbing
Q00458437-I1-PL
07/06/2022
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/03/2022
Permit issued — Curb Cut
Q00453572-I1-CC
06/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
06/08/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
06/08/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MEHDI GHAZI
06/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
06/08/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
06/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
06/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
06/07/2022
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00458437-P1
06/07/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
06/07/2022
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
06/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
06/07/2022
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
06/07/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MEHDI GHAZI
06/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
06/07/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
05/20/2022
Permit issued — General Construction
Q00477886-I1-FO-EA
05/20/2022
Permit issued — Mechanical Systems
Q00477886-I1-GC-CX
05/17/2022
Signed off — Alteration
Q00451525-I1
05/11/2022
Special inspection requirement — Masonry
MEHDI GHAZI
05/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
05/11/2022
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
05/11/2022
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
05/11/2022
Special inspection requirement — Final
MEHDI GHAZI
05/11/2022
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
05/11/2022
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
05/11/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
05/11/2022
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
05/11/2022
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
05/11/2022
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
05/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
05/11/2022
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
05/11/2022
Special inspection requirement — Metering
MEHDI GHAZI
05/11/2022
Special inspection requirement — Fenestration areas
MEHDI GHAZI
05/11/2022
Special inspection requirement — Heating Systems
MEHDI GHAZI
05/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/04/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ENLARGEMENT FOR CONVERSION ONE- TO TWO-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00477886-P1
08/27/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/27/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/27/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/27/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/23/2021
Permit issued — Plumbing
Q00458437-I1-PL
06/17/2021
Permit issued — Foundation
Q00477886-I1-FO-EA
06/17/2021
Permit issued — Earth Work
Q00477886-I1-GC-CX
06/11/2021
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00458437-I1
06/07/2021
Permit issued — Construction Fence
Q00451525-I1-FN
05/25/2021
Filed — Alteration
Q00453572-I1
05/25/2021
Filed — Alteration
Q00451525-I1
03/01/2021
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ENLARGEMENT FOR CONVERSION ONE- TO TWO-FAMILY DETACHED RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00477886-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offChamp Plumbing & Heating07/22/2022
DOB NOWCurb CutSigned-offCS Renovation07/03/2022
DOB NOWGeneral ConstructionSigned-offCS Renovation05/20/2022
DOB NOWMechanical SystemsPermit IssuedCS Renovation05/20/2022
DOB NOWPlumbingSigned-offChamp Plumbing & Heating06/23/2021
DOB NOWFoundationSigned-offCS Renovation06/17/2021
DOB NOWEarth WorkPermit IssuedCS Renovation06/17/2021
DOB NOWConstruction FenceSigned-offCS Renovation06/07/2021
BISOTISSUEDEmpower CES12/03/2021
1 project · most recent 05/04/2022
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/04/2022Signed-offCS RenovationHeating Systems, Ventilation Systems
Heating
Williamson GWA-105 105,000 BTU · Boiler ×2
Ventilation
Renewaire EV90 90 CFM · Erv ×2
2 projects · most recent 12/11/2021
General Wiring
FiledStatusContractorScope
12/11/2021CompleteIsland Electric—
06/28/2021CompleteGoodall ElectricGeneral Wiring
1 project · most recent 05/04/2022
Steel Masonry Wood
FiledStatusContractorScope
05/04/2022Permit IssuedCS RenovationSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/03/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
07/06/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
05/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/27/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/27/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
06/08/2022HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
06/08/2022HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
06/08/2022HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
06/08/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMEHDI GHAZIspecial
06/08/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
06/08/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
06/08/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
06/07/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
06/07/2022HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
06/07/2022HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
06/07/2022HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
06/07/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
06/07/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMEHDI GHAZIspecial
06/07/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
05/11/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
05/11/2022FinalMEHDI GHAZIprogress
05/11/2022Footing and FoundationMEHDI GHAZIprogress
05/11/2022Structural Wood FrameMEHDI GHAZIprogress
05/11/2022Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
05/11/2022HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
05/11/2022MeteringMEHDI GHAZIenergy_progress
05/11/2022Fenestration areasMEHDI GHAZIenergy_progress
05/11/2022Electric vehicle service equipment requirementsMEHDI GHAZIenergy_progress
05/11/2022Interior lighting powerMEHDI GHAZIenergy_progress
05/11/2022Fenestration air leakageMEHDI GHAZIenergy_progress
Latest 25 of 85.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch2
08/26/2026Q00477886-I1Request digital key ↗
08/26/2026Q00477886-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00458437-I1Request digital key ↗
08/15/2026Q00458437-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026Q00453572-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00451525-I1Request digital key ↗
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation2
04/26/2022440671587Open ↗
04/09/2021440671587Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/19/2021440696310Open ↗
▸BISWORK PERMIT APPLICATION1
12/03/2021440696310Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/26/2026Q00477886-I1Open ↗
08/26/2026Q00477886-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/26/2026Q00477886-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026Q00477886-I1Open ↗
09/01/2026Q00477886-I1Open ↗
09/01/2026Q00477886-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q00477886-I1Open ↗
09/01/2026Q00477886-I1Open ↗
09/01/2026Q00477886-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00453572-I1Open ↗
08/27/2026Q00458437-I1Open ↗
08/27/2026Q00458437-P1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/19/2021440696310Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/26/2026Q00477886-I1Open ↗
08/26/2026Q00477886-P1Open ↗
08/26/2026Q00477886-P1Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST1
04/09/2021440671587Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
12/03/2021440696310Open ↗
▸DOB NOWStreet Trees Site Plan1
08/26/2026Q00477886-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/26/2026Q00477886-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/26/2026Q00477886-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00458437-P1Open ↗
08/27/2026Q00458437-I1Open ↗
08/26/2026Q00477886-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/31/2022440696310Open ↗
12/03/2021440696310Open ↗
11/19/2021440696310Open ↗
Showing 3 of 4 on file for this type
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)2
09/09/2022440696310Open ↗
08/31/2022440696310Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/26/2026Q00477886-I1Open ↗
08/13/2026Q00458437-I1Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
11/19/2021440696310Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/31/2022440696310Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/31/2022440696310Open ↗
12/03/2021440696310Open ↗
11/19/2021440696310Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT2
08/26/2026Q00477886-I1Open ↗
08/26/2026Q00477886-P1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/26/2026Q00477886-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/26/2026Q00477886-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/09/2021440671587Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/12/2022440696310Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
09/12/2022440696310Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
11/19/2021440696310Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/31/2022440696310Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/19/2021440696310Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/26/2026Q00477886-P1Open ↗
08/26/2026Q00477886-I1Open ↗
▸BISTax Abatement Miscellaneous1
09/08/2022440696310Open ↗
▸DOB NOWFinal Survey1
08/26/2026Q00477886-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/26/2026Q00477886-I1Open ↗