← Back
BuildNYC
Elevator cooperative
76-66 AUSTIN STREET
QUEENS · Forest Hills · BIN 4079606
💬 Discuss this project
1931Year Built
6Stories
D4Building Class
R6Zoning
122,833 sfGross Floor Area
98Units
LL97 CoveredRent Stabilized10 Active Violations ▸FISP: SAFE
Elevator cooperative · 30,000 sf lot · 4.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 5 docs
Floor 6Unit 6I13p · 2 filings · 18 docs
Floor 5
Floor 4Unit 4G4p · 2 filings · 2 docs
Floor 3
Floor 2
Floor 1Curb cut legalization3p · 1 filing · 10 docs
Site & exteriorTemporary heavy duty sidewalk shedUnder Construction19p · 4 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
76-66 Owners1903/21/2026
76-66 Austin Owners803/22/2026
Mark Greenberg Real Estate Co403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services109/30/2026
An Shen Ma Architect202/15/2022
Stone412/22/2021
Navi Structural Engineering411/26/2021
KZ Engineering109/28/2021
Daniel Odigie112/06/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Stone803/21/2026
Aca Associates403/21/2026
Synergy Building Consultants103/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock Group NYScaffold407/08/2026
Upgrade 1 Construction CoGeneral Contractor303/21/2026
Imperial Contrac of NYCGeneral Contractor303/21/2026
Malcon ConstructionGeneral Contractor107/08/2026
Pyramid Restoration NYspecialty_contractor107/08/2026
Andamio ScaffoldingScaffold110/30/2026
CS BridgeScaffold107/08/2026
E G ElectricElectrical103/22/2026
MC Cready & Rice PlumbingPlumbing107/08/2026
Enterprise Electrical SystemsElectrical103/22/2026
R.C.M. ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665110/05/2026
An Shen Ma Architect2968202/15/2022
Stone Engineering & Architects1362112/22/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
11/10/2026
Permit renewed — Suspended Scaffold
Renewed without changes
Q01467042-I1-SC
10/29/2026
Permit issued — Sidewalk Shed
Q01466853-I1-SH
10/29/2026
Permit issued — Suspended Scaffold
Q01467042-I1-SC
10/05/2026
Filed — Alteration
Installation of suspended scaffold and material hoist for facade inspection/repair.
Q01467042-I1
279 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedStreamline Consultants NY11/10/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding10/29/2026
DOB NOWSuspended ScaffoldPermit IssuedStreamline Consultants NY10/29/2026
DOB NOWGeneral ConstructionSigned-offPyramid Restoration NY07/12/2022
DOB NOWPlumbingSigned-offMC Cready & Rice Plumbing02/28/2022
DOB NOWGeneral ConstructionSigned-offImperial Contrac of NYC01/17/2022
DOB NOWGeneral ConstructionSigned-offUpgrade 1 Construction Co10/20/2021
DOB NOWSidewalk ShedSigned-offCS Bridge09/29/2021
DOB NOWCurb CutSigned-offMalcon Construction03/04/2021
DOB NOWSupported ScaffoldPermit IssuedRock Group NY03/26/2018
DOB NOWSupported ScaffoldPermit IssuedRock Group NY01/12/2018
BISOTISSUEDMalcon Construction12/24/2020
BISEQISSUEDRock Group NY08/01/2019
BISOTISSUEDSato Construction Co03/12/2019
BISOTISSUEDSato Construction Co06/20/2018
BISEQISSUEDRock Group NY05/09/2018
BISOTISSUEDSato Construction Co07/25/2017
BISEQISSUEDRock Group NY12/13/2016
BISOTISSUEDRally Restoration07/26/2016
BISOTISSUEDRally Restoration01/11/2016
BISEQISSUEDRock Group NY12/23/2015
BISOTISSUEDMohammad Aslam07/15/2015
BISEQISSUEDMohammad Aslam06/08/2015
BISOTISSUEDMohammad Aslam05/19/2015
BISEQISSUEDEverest Scaffolding05/06/2013
BISOTISSUEDRally Restoration04/30/2013
BISOTISSUEDRally Restoration11/14/2012
9 projects · most recent 10/29/2026
General Wiring
FiledStatusContractorScope
10/29/2026Permit IssuedBorowide Elect'l Contractors—
08/05/2024CompleteForest Brook Electrical ContractingGeneral Wiring
05/24/2024Permit IssuedMonte Electric CoGeneral Wiring
03/01/2023CompleteRJ Russo Electric CoGeneral Wiring
01/05/2023CompleteNion ElectricGeneral Wiring
02/16/2022Permit IssuedJoseph Weinstein ElectricGeneral Wiring
01/20/2022Permit IssuedE G ElectricGeneral Wiring
10/28/2021CompleteEnterprise Electrical SystemsGeneral Wiring
09/23/2021CompleteNash Electric Services—
2 projects · most recent 09/30/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
09/30/2026Permit IssuedAndamio ScaffoldingSidewalk Shed
12/06/2017Permit IssuedRock Group NYScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/07/2022Pass-Final General Construction Non-Directive 14PassView ↗
07/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/29/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
09/29/2026Post-installed AnchorsKarol Zdancewiczspecial
11/29/2021FinalHumayun Ahmedprogress
11/25/2021FinalHumayun Ahmedprogress
09/23/2021FinalKarol Zdancewiczprogress
241 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account