← Back
Condo, residential unit in walk-up building
Star Corner Condominium
76 BEDFORD STREET · BIN 1009975
💬 Discuss this project
1921Year Built
5Stories
R2Building Class
R6Zoning
14,563 sfGross Floor Area
30Units
Rent Stabilized1 Open Violation ▸
Condo, residential unit in walk-up building · Owner of record: STAR CORNER CONDOMINIUM INC · 5,663 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 36p · 1 filing · 20 docs
Floor 2
Floor 14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARBROSE REALTY2007/08/2026
OWNER OF 89 BEDFORD ST103/22/2026
STAR CORNER CONDOMINIUM603/22/2026
STAR CORNER CONDOMINIUM BOARD OF203/21/2026
78 BEDFORD STREET CONDOMINUM403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE803/21/2026
CLARKE CONSTRUCTION CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DK MASON & HOME IMPR LLCGeneral Contractor1107/08/2026
A T CONCEPT INCGeneral Contractor507/08/2026
BROOKLYN SISTERS INCGeneral Contractor207/08/2026
NEW YORK PARK PLBG&HTG COPlumbing207/08/2026
ALEXANDER MERZLYAKElectrical103/21/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
AAA TOTAL PLUMBING, INCPlumbing107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACE STRUCTURAL ENGINEERIN496411/12/2025
DOMANI INSPECTION SERVICE843408/26/2025
BADALY ARCHITECT PLLC7137107/15/2024
DTLS.ARCHITECTURE8388107/10/2024
HUAN DESIGN INC7669210/13/2020
Building Lifecycle
All (100)Filed (14)Permit Issued (16)Signed Off (10)Violation (18)Inspection (10)Objection (2)Special Inspection (30)
02/18/2026
Signed off — Alteration
Replacement of (1) kitchen and (3) bathroom plumbing fixtures. Installation of new dishwasher and clothes washing machine. Replacement of radiators. Removal of (1) gas range and installation of (1) electric range.
M01049610-S1
02/13/2026
Signed off — Alteration
Replacement of (1) kitchen and (3) bathroom plumbing fixtures. Installation of new dishwasher and clothes washing machine. Replacement of radiators. Removal of (1) gas range and installation of (1) electric range.
M01049610-I1
01/27/2026
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW PL AND GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01035307-S2
01/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
01/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY UGBEBOR
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY UGBEBOR
01/06/2026
Objection resolved — Addressed
11/29/2025
Objection raised — Admin
11/19/2025
Signed off — Alteration
Interior renovation of Apartment 3A. No change in use, egress, or occupancy.
M00947195-S2
11/12/2025
Filed — Alteration
Replacement of (1) kitchen and (3) bathroom plumbing fixtures. Installation of new dishwasher and clothes washing machine. Replacement of radiators. Removal of (1) gas range and installation of (1) electric range.
M01049610-P2
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY UGBEBOR
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY UGBEBOR
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
11/06/2025
Signed off — Alteration
Interior renovation of Apartment 3A. No change in use, egress, or occupancy.
M00947195-I1
10/24/2025
Permit issued — Plumbing
M00947195-S2-PL
10/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/26/2025
Filed — Alteration
Interior renovation of Apartment 3A. No change in use, egress, or occupancy.
M00947195-P1
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/03/2025
Signed off — Alteration
Interior renovation of Apartment 3A. No change in use, egress, or occupancy.
M00947195-S1
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2025
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW PL AND GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01035307-I1
06/03/2025
Signed off — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW PL AND GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01035307-S1
04/30/2025
Permit issued — Mechanical Systems
M00947195-S1-MS
04/21/2025
Permit issued — General Construction
M00947195-I1-GC
04/14/2025
Signed off — Alteration
M01124987-I1
04/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
04/11/2025
Special inspection requirement — Final
Kyle Keene
04/11/2025
Special inspection requirement — Lighting in dwelling units
ANTHONY UGBEBOR
04/03/2025
Permit issued — General Construction
M00947195-I1-GC
04/02/2025
Filed — Alteration
Replacement of (1) kitchen and (3) bathroom plumbing fixtures. Installation of new dishwasher and clothes washing machine. Replacement of radiators. Removal of (1) gas range and installation of (1) electric range.
M01049610-P1
04/02/2025
Special inspection requirement — Final
Kyle Keene
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
04/02/2025
Special inspection requirement — Lighting in dwelling units
ANTHONY UGBEBOR
03/07/2025
Permit issued — Plumbing
M01049610-S1-PL
03/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/27/2025
Permit issued — General Construction
M01049610-I1-GC
12/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/10/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/26/2024
Permit issued — General Construction
M01035307-I1-GC
11/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2024
Permit issued — General Construction
M00947195-I1-GC
10/10/2024
Filed — Alteration
M01124987-I1
10/10/2024
Permit issued — Supported Scaffold
M01124987-I1-SF
10/04/2024
Permit issued — Plumbing
M00947195-S2-PL
10/01/2024
Permit issued — General Construction
M01049610-I1-GC
09/26/2024
Violation issued (ECB, closed)
Construction
09/13/2024
Permit issued — Plumbing
M01035307-S1-PL
08/12/2024
Filed — Alteration
Replacement of (1) kitchen and (3) bathroom plumbing fixtures. Installation of new dishwasher and clothes washing machine. Replacement of radiators. Removal of (1) gas range and installation of (1) electric range.
M01049610-S1
08/05/2024
Permit issued — Mechanical Systems
M01035307-S2-MS
08/02/2024
Permit issued — General Construction
M01035307-I1-GC
07/15/2024
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW PL AND GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01035307-S2
07/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
07/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
07/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
07/10/2024
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW PL AND GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01035307-I1
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO10/24/2025
DOB NOWMechanical SystemsSigned-offDK MASON & HOME IMPR LLC04/30/2025
DOB NOWGeneral ConstructionSigned-offDK MASON & HOME IMPR LLC04/21/2025
DOB NOWGeneral ConstructionSigned-offDK MASON & HOME IMPR LLC04/03/2025
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP03/07/2025
DOB NOWGeneral ConstructionSigned-offBROOKLYN SISTERS02/27/2025
DOB NOWGeneral ConstructionSigned-offA T CONCEPT INC11/26/2024
DOB NOWGeneral ConstructionSigned-offDK MASON & HOME IMPR LLC10/31/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC10/10/2024
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO10/04/2024
DOB NOWGeneral ConstructionSigned-offBROOKLYN SISTERS10/01/2024
DOB NOWPlumbingSigned-offAAA TOTAL PLUMBING, INC09/13/2024
DOB NOWMechanical SystemsSigned-offA T CONCEPT INC08/05/2024
DOB NOWGeneral ConstructionSigned-offA T CONCEPT INC08/02/2024
DOB NOWGeneral ConstructionSigned-offDK MASON & HOME IMPR LLC06/11/2024
DOB NOWPlumbingSigned-offNICHOLAS SUIDA07/08/2020
BISOTISSUEDGA INDUSTRIES INC01/04/2022
BISOTISSUEDSHUN SHENG CONSTRUCTION04/07/2021
BISOTISSUEDGA INDUSTRIES INC09/14/2020
BISOTISSUEDSHUN SHENG CONSTRUCTION07/13/2020
BISPLISSUEDMETROTECH MECHANICAL CORP12/12/2019
BISOTISSUEDGA INDUSTRIES INC05/21/2019
BISPLISSUEDADRIANO PLMBG & HTG CORP05/17/2019
BISPLISSUEDMETROTECH MECHANICAL CORP12/19/2018
BISOTISSUEDGA INDUSTRIES INC05/03/2018
BISPLISSUEDMETROTECH MECHANICAL CORP01/16/2018
BISOTISSUEDEC FRAMING INC12/18/2017
BISPLISSUEDGANIC PLUMBING & HTG INC10/05/2017
BISOTISSUEDROMANOV INC09/22/2017
BISPLISSUEDMETROTECH MECHANICAL CORP07/13/2017
BISOTISSUEDEC FRAMING INC06/27/2017
BISPLISSUEDA.M.N. CORPORATION08/30/2016
BISOTISSUEDP.D.P. CONTRACTING INC08/25/2016
BISPLISSUEDA.M.N. CORPORATION12/30/2015
BISOTISSUEDB&G FULL CONSTRUCTION INC10/29/2015
BISPLISSUEDMETRO INCORPORATED03/30/2015
BISOTISSUEDR & F CONSTRUCTION INC03/26/2015
BISOTISSUEDLOUIS TURCHIOE03/12/2010
BISPLISSUEDTRISTAR PLBG & HTG INC11/19/2009
BISOTISSUEDLANDMARK RESTORATION & CONSTRUCT03/20/2008
+ 8 more permits on file
4 jobs · most recent 01/28/2026
General Wiring
FiledStatusContractorScope
01/28/2026CompleteSTELLAR ELECTRIC LLCGeneral Wiring
06/05/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
08/29/2024CompleteRAINBOW ELECTRIC CO., INCGeneral Wiring
07/01/2020CompleteLEONE ELECTRIC CO. INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
01/20/2026Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
01/20/2026HVAC-R and service water piping design and insulationANTHONY UGBEBORenergy_progress
01/20/2026Energy Code Compliance InspectionsANTHONY UGBEBORprogress
11/10/2025HVAC-R and service water piping design and insulationANTHONY UGBEBORenergy_progress
11/10/2025Energy Code Compliance InspectionsANTHONY UGBEBORprogress
11/10/2025Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
09/15/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/19/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/11/2025Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
04/11/2025FinalKyle Keeneprogress
04/11/2025Lighting in dwelling unitsANTHONY UGBEBORenergy_progress
04/02/2025FinalKyle Keeneprogress
04/02/2025Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
04/02/2025Lighting in dwelling unitsANTHONY UGBEBORenergy_progress
07/12/2024HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
07/12/2024HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
07/12/2024HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
04/17/2024Fire-Resistance Rated ConstructionMark Bearakprogress
04/16/2024Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
04/15/2024Mechanical SystemsSHAHIN BADALYspecial
04/15/2024FinalMOHAMMAD BADALYprogress
04/12/2024Interior lighting powerMark Bearakenergy_progress
04/12/2024Fire-Resistant Penetrations and JointsMark Bearakspecial
04/12/2024FinalMark Bearakprogress
04/12/2024Energy Code Compliance InspectionsMark Bearakprogress
Latest 25 of 30.
▾Documents — 287 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
08/27/2026M01049610-S1Request digital key ↗
08/27/2026M01049610-I1Request digital key ↗
08/27/2026M01049610-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00365081-I1Request digital key ↗
08/15/2026M00365081-P1Request digital key ↗
▸Applications & Permits57
▸BISWORK PERMIT APPLICATION24
07/13/2020140920519Open ↗
10/04/2019122975735Open ↗
05/22/2019123356830Open ↗
Showing 3 of 24 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION20
07/03/2020140920519Open ↗
12/03/2019122975735Open ↗
03/26/2019122975735Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWLPC Approval/Permit13
08/26/2026M01035307-I1Open ↗
08/26/2026M01035307-S1Open ↗
08/13/2026M00365081-I1Open ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/01/2018123356830Open ↗
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature17
09/25/2026M00947195-I1Open ↗
08/30/2026M01049610-I1Open ↗
08/30/2026M01049610-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
02/03/2020122975735Open ↗
05/03/2018123356830Open ↗
05/01/2018123356830Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/04/2026M00365081-I1Open ↗
09/04/2026M00365081-P1Open ↗
08/27/2026M01049610-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/25/2026M00947195-I1Open ↗
08/30/2026M01049610-I1Open ↗
08/29/2026M00947195-S1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/09/2016122855339Open ↗
10/27/2009120185469Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/03/2020140920519Open ↗
09/09/2016122855339Open ↗
02/23/2015140307852Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/27/2009120185469Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/03/2020140920519Open ↗
02/23/2015140307852Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/03/2020140920519Open ↗
02/23/2015140307852Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
12/03/2019122975735Open ↗
03/26/2019122975735Open ↗
01/29/2019123116635Open ↗
Showing 3 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
12/29/2015140307852Open ↗
10/05/2015140307852Open ↗
12/14/2010120185469Open ↗
▸BISSCHEDULE B - PLUMBING3
02/23/2015140307852Open ↗
01/11/2011120185469Open ↗
10/27/2009120185469Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes5
05/01/2018123356830Open ↗
08/22/2017123116635Open ↗
03/29/2017122975735Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00365081-P1Open ↗
08/13/2026M00365081-I1Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026M01049610-I1Open ↗
08/27/2026M01049610-P2Open ↗
08/27/2026M01049610-P1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
07/03/2020140920519Open ↗
05/01/2018123356830Open ↗
08/22/2017123116635Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/27/2009120185469Open ↗
10/27/2009120185469Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/21/2008110103646Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
02/03/2020122975735Open ↗
05/03/2018123356830Open ↗
08/22/2017123116635Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
07/02/2021123116635Open ↗
02/03/2020122975735Open ↗
12/14/2016122855339Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/02/2021123116635Open ↗
05/12/2021140920519Open ↗
07/13/2020140920519Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/03/2020140920519Open ↗
02/23/2015140307852Open ↗
▸BISNYCECC ANALYSIS2
07/03/2020140920519Open ↗
02/23/2015140307852Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/12/2021140920519Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/02/2021123116635Open ↗
05/12/2021140920519Open ↗
07/08/2020140920519Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
05/01/2018123356830Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
07/02/2021123116635Open ↗
05/12/2021140920519Open ↗
02/06/2020122975735Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS APPROVAL7
07/03/2020140920519Open ↗
05/01/2018123356830Open ↗
08/22/2017123116635Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/27/2009120185469Open ↗
Showing 1 of 2 on file for this type
▸BISLANDMARKS SIGNOFF2
07/02/2021123116635Open ↗
05/12/2021140920519Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/02/2012110103646Open ↗
▸BISSUPERSEDING LETTER1
01/25/2018123116635Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT15
07/02/2021123116635Open ↗
07/03/2020140920519Open ↗
02/03/2020122975735Open ↗
Showing 3 of 15 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/12/2021140920519Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
09/09/2016122855339Open ↗
▸Filing & Intake Forms26
▸BISBOROUGH INTAKE FORM11
02/06/2020122975735Open ↗
02/03/2020122975735Open ↗
01/28/2020122975735Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET6
02/23/2018123356830Open ↗
08/22/2017123116635Open ↗
03/29/2017122975735Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION6
12/10/2019122975735Open ↗
05/03/2019122975735Open ↗
04/05/2019123116635Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/03/2020140920519Open ↗
02/23/2015140307852Open ↗
Showing 2 of 3 on file for this type
▸Other Documents2
▸BISDepartment of Consumer Affairs (DCA) Form1
09/25/2017123116635Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00947195-I1Open ↗