← Back
Miscellaneous two family
76 GREEN VALLEY ROAD
STATEN ISLAND · Arden Heights-Rossville · BIN 5079087
💬 Discuss this project
1983Year Built
3Stories
B9Building Class
R3-2Zoning
2,248 sfGross Floor Area
2Units
Miscellaneous two family · 2,649 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Roof7p · 1 filing · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC208/28/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272208/28/2024
Building Lifecycle
All (14)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (10)
02/07/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01084773-I1
08/30/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/30/2024
Special inspection requirement — Final
Walid Abdulla
08/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/28/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01084773-P1
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/28/2024
Special inspection requirement — Final
Walid Abdulla
08/28/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/01/2024
Permit issued — Solar
S01084773-I1-SL
07/29/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01084773-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/01/2024
1 project · most recent 07/29/2024
FiledStatusContractorScope
07/29/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/30/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
08/30/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/30/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/30/2024FinalWalid Abdullaprogress
08/30/2024Energy Code Compliance InspectionsWalid Abdullaprogress
08/28/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/28/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/28/2024Energy Code Compliance InspectionsWalid Abdullaprogress
08/28/2024FinalWalid Abdullaprogress
08/28/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S01084773-I1Request digital key ↗
08/21/2026S01084773-P1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/06/2026S01084773-P1Open ↗
09/06/2026S01084773-P1Open ↗
09/06/2026S01084773-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/06/2026S01084773-P1Open ↗
09/06/2026S01084773-P1Open ↗
08/31/2026S01084773-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01084773-I1Open ↗
08/13/2026S01084773-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S01084773-P1Open ↗
08/13/2026S01084773-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01084773-I1Open ↗